FACTORY SOLAR + ELECTRICAL PROJECT BRIEF Secured Engineers Pvt. Ltd. | 5 November 2026 | Version 1 https://www.securedengineers.com/industrial-solar-epc/ Use the same brief with every bidder, including us. Mark information as confirmed, assumed or missing. This is a scoping aid, not a design or approval certificate. Agree the review fee, deliverables and timing first. 1. THE DECISION Company and site: City / state: Project contact and role: Decision needed / target date: Budget status (approved / under review / not set): Package: [ ] Solar integration [ ] Electrical expansion [ ] Combined EPC Site: [ ] Operating [ ] New build [ ] Expansion Who approves the investment and who accepts the technical handover? 2. INPUTS AVAILABLE [ ] Complete recent electricity bill; 12 months if available [ ] Sanctioned load / contract demand and connection voltage [ ] Daytime load readings, operating shifts, holidays and shutdowns [ ] Existing or proposed single-line diagram (SLD) [ ] Transformer, panel, DG and protection details [ ] New machine list and load schedule for any expansion [ ] Roof layout, age/condition, structural information and access [ ] Existing BOQ / quotation and available construction drawings [ ] Target energisation date and permitted production shutdown window Missing inputs and who can obtain them: Do not publish private bills, account numbers or drawings. Agree a secure document-sharing channel with the recipient. 3. REVIEW OUTPUTS TO AGREE BEFORE WORK STARTS [ ] Input register: confirmed facts, assumptions and missing evidence [ ] Solar sizing basis: kWp DC and kW AC distinguished [ ] Self-consumption, export and curtailment assumptions, where relevant [ ] Electrical capacity and connection constraints needing verification [ ] Scope matrix: included / excluded / by client, with named owners [ ] Required site checks, studies and specialist assessments [ ] Shutdown dependencies and proposed execution sequence [ ] Applicable submission responsibilities and fees to confirm [ ] Proposal basis, exclusions, price validity and next decision An initial conversation does not commission a design or a free detailed report. 4. SCOPE BOUNDARIES - COMPLETE FOR EACH BIDDER For every item record: scope | responsible party | price basis | evidence. [ ] Roof assessment, strengthening, fixing and waterproofing [ ] Solar modules, inverters, structure and DC/AC capacity basis [ ] Panels, transformer/bay works, cables, routes, trays and earthing [ ] DG operating modes, interlocks, protection settings and tests [ ] Metering, monitoring access, communications and data ownership [ ] Utility/inspectorate submissions, fees and attendance where applicable [ ] Isolation, temporary supply, shutdown and restart coordination [ ] Civil works, access equipment, lifting and site safety responsibilities [ ] Commissioning, punch list, acceptance and handover documents [ ] Warranty issuer, exclusions, claim process and O&M responsibilities The relevant authority decides approvals; a contractor's scope is not a guarantee. 5. COMPARE TOTAL SCOPE, THEN PRICE [ ] Match capacity, specifications, quantities and makes before comparison [ ] Separate GST, exclusions, client works and recurring charges [ ] State quote validity, payment milestones and variation procedure [ ] Show savings inputs, avoidable charges, O&M and replacement costs [ ] Test lower daytime self-consumption and shutdown-day scenarios [ ] Separate projected generation from measured operating performance [ ] Define any performance commitment, measurement method and remedy Do not infer an industrial project's savings from roof area or a monthly bill alone. 6. EVIDENCE TO REQUEST FROM EVERY EPC BIDDER [ ] Comparable installation: client, location, scope and current status [ ] AC/DC capacity basis and completion / commissioning date [ ] Permitted reference contact and authentic site photographs [ ] Relevant test, commissioning and handover records [ ] Equipment warranties and applicable authority documentation [ ] As-built SLD, operating settings and monitoring handover [ ] Named project lead, execution resources and service responsibility Company-wide projects are not the same as commissioned solar installations. 7. NEXT ACTION Unresolved issues: Document / check needed: Responsible person: Agreed next meeting and date: Review scope, fee and timing accepted by: Discuss the project: https://www.securedengineers.com/industrial-solar-epc/#feasibility-review Electrical scope: https://www.securedengineers.com/services/electrical-infrastructure/ Quotation guide: https://www.securedengineers.com/guides/how-to-evaluate-solar-epc-proposals/