INDUSTRIAL SOLAR EPC: FEASIBILITY AND QUOTATION REVIEW Secured Engineers Pvt. Ltd. | Content updated 24 October 2026 https://www.securedengineers.com/industrial-solar-epc/ Use this brief with every bidder. Mark each item confirmed, assumed or missing. This checklist supports procurement; it is not a design or approval certificate. 1. FACTORY INPUTS [ ] Site city/state, industry, project stage and target decision date [ ] Recent complete electricity bill; 12 months where available [ ] Sanctioned load/contract demand, connection voltage and DISCOM [ ] Daytime load readings, shifts, weekly holidays and planned shutdowns [ ] Usable roof area/type, age/condition, drawings/photos and access constraints [ ] Transformer, DG and existing electrical system details [ ] Existing solar quotation/BOQ, if any Do not post bills, account numbers or private drawings in a public discussion. 2. SIZING AND SAVINGS [ ] State module capacity in kWp DC and inverter capacity in kW AC separately [ ] Show generation source, losses, shading and seasonal assumptions [ ] Separate working-day and shutdown-day demand and generation [ ] Separate self-consumption, export and curtailment [ ] State the applicable export/settlement assumption and who verified it [ ] Distinguish energy value from bill charges actually avoided [ ] Separate O&M, financing, tax and equipment-replacement assumptions [ ] Show a lower self-consumption scenario alongside the main estimate A monthly bill or annual energy total alone does not prove the savings. 3. LIKE-FOR-LIKE QUOTATION COMPARISON For each row record: Bidder A | Bidder B | included/excluded/by client | evidence. [ ] Capacity basis, module and inverter make/model [ ] GST and total installed price on the same basis [ ] Structure, structural assessment and roof strengthening/waterproofing [ ] Cable lengths/sizes/routes, trays, earthing and surge protection [ ] LT/HT interface, transformer/bay work, DG controls and protection [ ] Metering, DISCOM and inspectorate responsibility where applicable [ ] Monitoring access, communications costs and data ownership [ ] Installation access and production shutdowns required [ ] Commissioning tests, acceptance criteria and outstanding-work process [ ] Warranties: issuer, term, exclusions and claim responsibility [ ] Performance commitment: metric, measurement period, exclusions and remedy [ ] O&M: scope, cleaning, reporting, response commitment and recurring charges 4. HANDOVER EVIDENCE [ ] As-built layout/SLD, module serial schedule and applicable test records [ ] Inverter/protection settings and commissioning records [ ] Structural documentation and applicable authority permissions [ ] Monitoring credentials, warranties and operating instructions [ ] Named contact and process for faults, warranty claims and maintenance 5. DECISION RECORD Known constraints: Unverified assumptions: Missing evidence and responsible person: Next check/site visit: Decision date: Read the full guide: https://www.securedengineers.com/guides/how-to-evaluate-solar-epc-proposals/ Request a project review: https://www.securedengineers.com/industrial-solar-epc/#solar-proposal Final capacity, savings and scope depend on the site evidence and applicable rules.