Skip to content
Secured Engineers Pvt. Ltd. logo
Home
Company Insights Resources About Founder — Er. Ankur Kaplesh
Services Mechanical / HVACElectricalPlumbingFire ProtectionLow Voltage / ELVSolar EPCDesign & ApprovalsAMC / MaintenanceTurnkey EPCFire NOC AssistanceCEIG Liaison & EnergisationTesting & Commissioning
Industries Manufacturing & IndustrialHealthcare & HospitalsHospitality & HotelsWarehousing & LogisticsGovernment & DefenceEducation & InstitutionsData CentrePharmaceutical & CleanroomCold StorageTextile & ApparelAutomobile & Auto-ComponentsFood Processing & FMCGChemical & Process Industries
Free Tools ★ Architect & Design Resource Hub All 56 calculators Solar Financial Calculator Fire Water Storage Checker Fire Pump Room Calculator AC Tonnage Calculator DG Load Calculator MEPF Budget Calculator
Projects Work With Us Get a Free Quote
No cost, no obligation

Request a free MEPF or solar project proposal

Ask us for a proposal and our engineers do the groundwork first — a site survey, a concept design, a budget you can take to your board, and a clear approvals path. You decide afterwards whether to proceed.

  • Free on-site survey & concept design
  • Lump-sum per-sq.ft budget (after a site visit)
  • Fire-NOC, CEIG & net-metering roadmap
  • Energy-saving & solar payback analysis
535+ projectsISO 9001:2015 Certified93.32% delivered earlyReply in 1 business day

Scoping a package of ₹50 lakh or more? Use the RFQ form →

Tell us about your project

Tell us about your project — our engineers respond within one business day.

  • ★ 4.7 (230 Google reviews)
  • 535+ projects
  • ISO 9001:2015 Certified
  • Reply in 1 business day

🔒 Your details go straight to our team. No spam, ever.

Free · 60-second tool

Instant project cost estimator

Get an indicative budget range for your MEPF or solar project — then we send the detailed engineered quote.

What do you need?

Approx. project size

sq.ft

Built-up area in square feet. A rough number is fine.

A couple of details

Indicative budget range —

Indicative only — we confirm a firm lump-sum per-sq.ft price after a site visit.

Get the detailed engineered estimate — free:

No cost, no obligation

What you get before you commit

Ask us for a proposal and our engineers do the groundwork first — a site survey, a concept design, a budget you can take to your board, and a clear approvals path. You decide afterwards whether to proceed.

  • On-site engineering survey and requirement study
  • Concept MEP / solar design and system sizing
  • Lump-sum per-sq.ft budget, confirmed after the site visit
  • Statutory approvals roadmap — Fire NOC, CEIG, net metering
  • Energy-saving and solar payback analysis
  • Single-window project plan and timeline

No cost and no obligation. We reply within one business day.

Before you send it

What to have ready for a useful quotation

Send what you have. The more of this we see up front, the closer the first budget lands — and the survey covers whatever is missing.

About the project

  • Project location — city and site address or pin
  • Building or factory type, and what it will be used for
  • Built-up area and number of floors
  • Target timeline and any fixed dates — occupancy, production start, audit
  • Existing systems on site, if this is an expansion or retrofit
  • Approvals already held or applied for — Fire NOC, CEIG, DISCOM sanction

About the systems

  • Electrical load — connected load, or the DISCOM sanctioned load
  • HVAC requirement — areas to be conditioned and any process or cleanroom conditions
  • Fire requirement — hazard, storage heights, and any insurer conditions
  • Solar — twelve months of electricity bills and the roof area or drawings
  • Drawings — architectural plans, and MEP drawings if they exist
  • BOQ or tender document, if one has been prepared

What you can ask for

  • A site survey
  • A BOQ review — line by line, against what the site needs
  • A design review of drawings prepared by others
  • A cost estimate on a per-square-foot basis, after the survey
  • A turnkey MEPF or solar EPC proposal
  • An AMC proposal for existing plant

Packages of ₹50 lakh or more, and tenders: use the RFQ form, which asks for stage, scope and award timeline.

Risk reversal

Our Triple-Lock Promise

We remove the risk so the decision is easy.

100% free, zero obligation

Your survey, design concept and quote cost you nothing — and you're never obligated to proceed.

Approvals filed in-house

Fire-NOC, CEIG, DISCOM net-metering and pollution-board consent — we prepare, file and follow up as part of the job. The authority decides and sets the timeline.

On-time, single accountability

93.32% of our projects are delivered early, with one accountable team for the whole job — no finger-pointing.

Zero-incident safety & ISO quality

1,13,880+ safe man-hours with zero safety incidents, under ISO 9001:2015 quality processes.

Trusted across India

You'll be in good company

Delivered for telecom, manufacturing, healthcare, hospitality, infrastructure & government leaders.

Airtel logo
Reliance Jio logo
Dabur logo
Hero Cycles logo
UB Group logo
Fortis Healthcare logo
Hyatt Regency logo
Park Inn by Radisson logo
Best Western logo
Luminous logo
Metro logo
Park Plaza logo
Shapoorji Pallonji logo
Punj Lloyd logo
Ceigall India logo
V-Guard logo
Microtek logo
Eastman logo
KRBL logo
Duke logo
Kangaro logo
Net+ logo
Google Reviews

Rated 5.0 on Google — Noida office

5.0/5 · 8 Google reviews

Verified reviews from our Noida Google Business Profile.

Mohammad Samsad
★★★★★
Best 👍👍👍👍👍
Nitin Jain
★★★★★
Great work practises and excellence in project execution. All in one solution with total MEP covered.
Sushila Maurya
★★★★★
Fantastic work.

Ready to scope your project?

Book a no-obligation consultation. We design, file the approvals and execute — one team, start to finish.

ONE PARTNER. END TO END. You focus on your business — we handle the rest.
Quality Safety Commitment
Speak to a Lead Engineer