Industrial Approvals in India — done in the right order
A new factory clears more than a dozen approvals from a dozen departments, in a specific sequence, with drawings that must all agree. These guides map every clearance — CLU, factory licence, DISH, Fire NOC, SPCB consents, CEIG, boiler and PESO — for Punjab, Haryana, UP and Himachal.
A deep guide for every clearance
Each approval has its own working guide — process, documents, timelines and where projects fail. Start with the pillar above for the sequence, then go deep on the clearance in front of you.
Fire NOC for Factories in Punjab, Haryana & UP
Process, systems, cost & why schemes get rejected
Read the guideChange of Land Use (CLU) for Industrial Land
When you need it, charges & timelines
Read the guideFactory Licence & DISH Approval
Documents, forms and the workplace-layout check
Read the guideSPCB Consent to Establish & Operate (CTE/CTO)
Red/Orange/Green category, ETP & consent
Read the guideNBC 2016 for Factories
Occupancy, exits, travel distance & refuge area
Read the guideElectrical Inspector (CEIG) Approval
HT installation, substation, DG & transformer
Read the guidePESO Licence for Diesel & Hazardous Storage
Thresholds, drawings & inspection
Read the guideEnvironmental Clearance (EIA 2006)
When a factory actually needs one
Read the guideNot sure which approvals your project needs?
Tell us the site, the process and the timeline. We return the exact approval roadmap for your project — in order, with the critical path and the long-pole clearances flagged.