Skip to content
Secured Engineers Pvt. Ltd. logo
Home
Company Insights Resources About Founder — Er. Ankur Kaplesh
Services Mechanical / HVACElectricalPlumbingFire ProtectionLow Voltage / ELVSolar EPCDesign & ApprovalsAMC / MaintenanceTurnkey EPCFire NOC AssistanceCEIG Liaison & EnergisationTesting & Commissioning
Industries Manufacturing & IndustrialHealthcare & HospitalsHospitality & HotelsWarehousing & LogisticsGovernment & DefenceEducation & InstitutionsData CentrePharmaceutical & CleanroomCold StorageTextile & ApparelAutomobile & Auto-ComponentsFood Processing & FMCGChemical & Process Industries
Free Tools ★ Architect & Design Resource Hub All 29 calculators Solar Savings Calculator Fire Water Tank Calculator Fire Pump Room Calculator AC Tonnage Calculator DG Set Sizing Calculator MEPF Cost Estimator
Projects Work With Us Get a Free Quote
Free Tool · Turnkey MEPF

MEPF Cost Estimator

MEPF Cost Estimator — quick estimate

Get an indicative budget range for your building services — Mechanical, Electrical, Plumbing & Fire — by building type and area. Adjust the inputs, then get a firm lump-sum per-sq.ft quote from our team after a site visit.

Your project

50,000 sq.ft

Indicative ₹/sq.ft benchmarks for Indian C&I projects. Real cost depends on the detailed scope, equipment makes, site conditions and approvals.

Estimated total budget
Rate
Budget — low
Budget — high
Typical split (full MEPF)

Get a firm lump-sum per-sq.ft quote — free

After a site visit, our team sends a firm lump-sum per-sq.ft turnkey MEPF price for your building. We'll attach the estimate above automatically.

🔒 Your estimate is attached automatically. No spam — ever.

Have a BOQ, drawing or tender for this scope? Send it for an item-wise rate-analysis review →

or reach us directly

Indicative estimates only — not a binding quotation. Actual cost depends on the detailed scope, equipment selection, site conditions, statutory scope and market rates; we confirm a firm lump-sum per-sq.ft price after a site visit.

Method

How this calculator works — and where it stops

What it calculates

A budget range for the MEPF package of a building from its type, built-up area and scope, and the split of that budget across HVAC, electrical, plumbing, fire and ELV.

Inputs

  • Building type — office, retail, hotel, hospital, pharma, industrial, warehouse or residential
  • Built-up area
  • Scope — full MEPF, MEP without fire, or a single service

Method

  1. Applies the per-square-foot band published for the building type (from ₹300–550 for warehouses to ₹2,500–4,500 for pharma, with office, retail, hotel, hospital, industrial and residential between) to the area, giving a low, mid and high figure.
  2. Scales by scope: 1.0 for full MEPF, 0.88 for MEP without fire (fire's 12% share removed), 0.4 for a single service.
  3. Splits the result HVAC 40% · electrical 30% · plumbing 12% · fire 12% · ELV 6%.

Assumptions

  • The bands are the site's published turnkey MEPF ranges for typical specifications in India; they are budget-stage figures, not rates.
  • The split is a typical distribution for a standard building of the type; a data hall or a cleanroom shifts it sharply.
  • Statutory fees, civil builder's work and owner-supplied items are not in the band.

Limitations

  • Specification level, redundancy, site logistics, programme and location are not inputs and move the number well outside the band.
  • A single-service estimate at 0.4 is a rough share; a single discipline can be far more or less depending on which one.
  • The tool cannot see drawings; a BOQ measured from drawings is the only reliable number.

Worked example

Produced by running this calculator with the inputs below.

Inputs

  • Building type: industrial
  • Built-up area: 100,000 sq ft
  • Scope: full MEPF
  • Grade: standard

Working

  1. Published band for an industrial building: ₹400–700 per sq ft, full MEPF scope factor 1.0, standard grade 1.0
  2. ₹400 × 100,000 = ₹4.00 Cr; ₹700 × 100,000 = ₹7.00 Cr; midpoint ₹5.50 Cr
  3. Split applied to the midpoint: HVAC 40%, electrical 30%, plumbing 12%, fire 12%, ELV 6%

Result. ₹4.00–7.00 Cr, midpoint ₹5.50 Cr — HVAC ₹2.20 Cr, electrical ₹1.65 Cr, plumbing ₹66.0 L, fire ₹66.0 L, ELV ₹33.0 L. A budget-stage range, not a quotation.

How engineers use the result

To set a budget-stage placeholder for the services package before design starts, and to test whether a quotation is inside a plausible range for the building.

When a professional design must replace it

At tender: a measured BOQ with named makes and a stated scope replaces the band, and quotations are compared against that BOQ line by line.

Need an exact BOQ, rate analysis or measurement sheet?

This is a quick engineering estimate. For tendering, billing or audit, our QS & estimation team prepares an item-wise BOQ, rate analysis and a verified measurement sheet to IS / CPWD norms — backed by 15+ years and ISO 9001:2015 quality processes.

ONE PARTNER. END TO END. You focus on your business — we handle the rest.
Quality Safety Commitment
Verify my numbers