Skip to content
★ FREE Get your complete MEP / Solar project blueprint — free · only 6 free audits left this month Claim my free blueprint →
Secured Engineers Pvt. Ltd. logo
Home
Company Insights Resources About Founder — Er. Ankur Kaplesh
Services Mechanical / HVACElectricalPlumbingFire ProtectionLow Voltage / ELVSolar EPCDesign & ApprovalsAMC / MaintenanceTurnkey EPCFire NOC AssistanceCEIG ApprovalTesting & CommissioningIndustrial Audits
Industries Manufacturing & IndustrialHealthcare & HospitalsHospitality & HotelsWarehousing & LogisticsGovernment & DefenceEducation & InstitutionsData CentrePharmaceutical & CleanroomCold StorageTextile & ApparelAutomobile & Auto-ComponentsFood Processing & FMCGChemical & Process Industries
Free Tools ★ Architect & Design Resource Hub All 29 calculators Solar Savings Calculator Fire Water Tank Calculator Fire Pump Room Calculator AC Tonnage Calculator DG Set Sizing Calculator MEPF Cost Estimator
Projects Work With Us Get a Free Quote

CEIG Approval Consultancy for Industrial Electrical Installations

No electrical inspectorate approval means no energisation — which means a finished plant that cannot run. We prepare the drawings and calculations the CEIG actually reviews, file them, and stand through the inspection, so your connection is not held up by a drawing that was never going to be approved.

Enquire: CEIG Approval

Step 1 of 3

What do you need?
What kind of facility?
Where should our engineer call you?

No forms to chase — an engineer calls you back. We never share your number.

Architects & PMCs — verify before you shortlist

Compliance, certification & single-point accountability

  • ISO 9001:2015 Certified quality management
  • Fire-NOC Designed & liaised in-house
  • CEIG approval Electrical inspectorate clearance
  • DISCOM net-metering Solar grid synchronisation
  • Single-point responsibility One accountable MEPF team
  • MSME registered Govt.-recognised contractor
What We Deliver

Energised on schedule, not after the third inspection.

  • CEIG applicability & scope review
  • Single-line diagrams & inspectorate drawings
  • Load, fault-level & protection coordination calculations
  • Earthing design & test documentation
  • Electrical Inspectorate liaison and query resolution
  • Inspection attendance & shortfall closure
Systems & Products

Every CEIG Approval system we engineer — and why it matters

Explore each system below. We've kept it plain: what it is, why it matters for your project, the standards we build to, and the approved makes we use — so you can decide exactly which systems to get a quote for.

Built to: CEA (Measures relating to Safety and Electric Supply) RegulationsIndian Electricity Rules / State Electricity RulesIS 3043 (earthing)IS 732 (wiring installations)

Drawings & Calculations for Submission

The single-line diagram, layout drawings, load and fault-level calculations, protection coordination and earthing design that the electrical inspectorate reviews before granting approval.

Why it matters

Most CEIG delays are a drawing problem, not an installation problem — an SLD that does not show protection settings, or calculations that do not demonstrate discrimination, comes straight back. We submit what the inspectorate is actually looking for.

  • Single-line diagram
  • Fault level & discrimination study
  • Earthing design to IS 3043
  • Protection setting schedule
Any new HT connection, substation, or DG installation awaiting energisation.

Liaison, Inspection & Energisation

Filing with the State Electrical Inspectorate, answering the queries raised against your file, and attending the physical inspection through to the approval that lets you energise.

Why it matters

The file stalls where nobody is chasing it. We carry it through every query round and stand at the inspection, so the approval is not waiting on a response nobody sent.

  • Inspectorate filing
  • Query resolution
  • Inspection attendance
  • Energisation clearance
When the plant is built and the connection is the last thing missing.

Shortfall Closure & Periodic Compliance

Closing out observations raised at inspection, and keeping periodic electrical safety compliance current for installations already in service.

Why it matters

Observations left open resurface at the next inspection or after an incident, when they are far more expensive to answer. We close them while they are still routine.

  • Observation closure
  • Rectification works
  • Periodic testing records
  • Compliance documentation
Installations carrying open inspectorate observations, or due for periodic compliance.
Why only Secured Engineers Pvt. Ltd.

Why clients pick us for CEIG Approval

India's #1 MEPF mindset: we don't just supply a system — we design it, get it approved, and execute it as one accountable team.

We own the approvals

Fire-NOC, CEIG and DISCOM handled in-house — so your ceig approval scope clears inspection the first time.

One team, all MEPF

No finger-pointing between trades. A single accountable partner from design to commissioning.

535+ projects, 89.77% repeat

15+ years across 18+ states, 93%+ delivered early — proof, not promises.

Approved makes only

Tier-1 brands and IS/IEC-grade materials on every system — never the cheapest substitute.

FAQ

CEIG Approval — frequently asked questions

What is CEIG approval and when do I need it?

CEIG is the Chief Electrical Inspector to Government — the state authority that approves industrial electrical installations before they can be energised. You generally need it for HT connections, substations, transformers and DG sets. Without it, a fully built plant cannot legally be switched on.

What does the electrical inspectorate actually check?

Primarily the drawings and calculations: the single-line diagram, load and fault-level calculations, protection coordination and discrimination, earthing design, and clearances around equipment — followed by a physical inspection verifying the installation matches what was approved.

Why do CEIG applications get delayed?

Most delays are documentation rather than installation — a single-line diagram that does not show protection settings, calculations that do not demonstrate discrimination between upstream and downstream devices, or earthing design that is not evidenced. These come back as queries, and the file waits until someone answers them.

Do I need separate CEIG approval for a DG set?

A DG installation typically falls within the inspectorate scope, particularly where it is synchronised or connected through a changeover to the main supply. Requirements vary by state and by rating, so confirm applicability for your installation with the state inspectorate before assuming it is exempt.

Is CEIG approval the same as a Fire NOC?

No. They are separate statutory approvals from different authorities under different rules — CEIG covers electrical safety and energisation, the Fire NOC covers fire and life safety. Clearing one does not advance the other, and an industrial project normally needs both.

Need CEIG Approval for your project?

Get a free consultation and quote. We design, take all approvals, and execute — you stay stress-free.

ONE PARTNER. END TO END. You focus on your business — we handle the rest.
Quality Safety Commitment
Chat / Get Quote