Skip to content
★ FREE Get your complete MEP / Solar project blueprint — free · only 6 free audits left this month Claim my free blueprint →
Secured Engineers Pvt. Ltd. logo
Home
Company Insights Resources About Founder — Er. Ankur Kaplesh
Services Mechanical / HVACElectricalPlumbingFire ProtectionLow Voltage / ELVSolar EPCDesign & ApprovalsAMC / MaintenanceTurnkey EPCFire NOC AssistanceTesting & CommissioningIndustrial Audits
Industries Manufacturing & IndustrialHealthcare & HospitalsHospitality & HotelsWarehousing & LogisticsGovernment & DefenceEducation & InstitutionsData CentrePharmaceutical & CleanroomCold StorageTextile & Apparel
Free Tools ★ Architect & Design Resource Hub All 21 calculators Solar Savings Calculator Fire Water Tank Calculator Fire Pump Room Calculator AC Tonnage Calculator DG Set Sizing Calculator MEPF Cost Estimator
Projects Work With Us Get a Free Quote
Electrical

Grid Down. DG Running at 70% Capacity. 40 Tenants. Who Gets Power First?

17 July 2026 · 6 min read · by

Grid Down. DG Running at 70% Capacity. 40 Tenants. Who Gets Power First?

A DG set sized to cover 100% of a commercial building's connected load is, in almost every real project, a wasted asset — because connected load and actual simultaneous demand are never the same number, and running a fleet of generators at low load burns fuel catastrophically inefficiently. So buildings size DG backup deliberately below 100% — commonly 60–80% of connected load, covering essential and priority circuits.

That is sound engineering. It is also the reason that the first real, extended grid outage in a multi-tenant building produces an argument that has nothing to do with electricity and everything to do with who decided, and when, whose load gets covered.

Why the shortfall is real and permanent

The gap between connected load and DG capacity isn't a design flaw — it's deliberate, and it exists in essentially every multi-tenant commercial building:

  • Diversity factor: not every tenant runs peak load simultaneously, so the DG is sized to realistic coincident demand, not the arithmetic sum of every nameplate rating
  • Cost: a DG fleet sized for 100% connected load sits mostly idle and represents capital nobody wants to carry for a scenario that rarely occurs
  • Fuel logistics: larger sets burn more diesel per outage hour, and diesel storage itself is PESO-regulated — bigger sets mean bigger, harder-to-approve storage

The result: during a genuine extended outage, somebody's load doesn't get backed up. The only question is whether that was decided in advance, by policy, or decided in real time, by whoever shouts loudest at the facility manager.

The three allocation models — and their honest trade-offs

ModelHow it worksWhere it fails
First-come, informalWhoever's circuit is on the "essential" list from the original design stays on; everyone else doesn'tThe original list reflects 5-year-old occupancy, not today's tenant mix — a server-room tenant may not even be on it
Uniform proportional cutEvery tenant's non-essential load is shed by the same percentageFair on paper; operationally chaotic — nobody's systems fail cleanly at a fractional percentage
Tiered priority contractTenants pre-purchase a backup tier (full / partial / none) reflected in their lease and DB wiringRequires upfront electrical segregation and a clear commercial framework — the only model that survives a real outage without disputes

Building a tiered priority framework

  1. Classify loads at the design stage, not after occupancy — life-safety (always on), business-critical (server rooms, cold storage, medical), operational (lighting, lifts), and discretionary (decorative, non-essential HVAC)
  2. Wire the priority tiers on separate circuits from day one — retrofitting segregation after a tenant fit-out is expensive and disruptive; design it into the base-build electrical scheme
  3. Price the tiers into the lease — a tenant with a server room should be paying for guaranteed backup capacity, not assuming it comes free with the base rent
  4. Publish the priority order to all tenants, not just the ones who negotiated hard — an allocation policy nobody has seen is not a policy, it's ammunition for a dispute
  5. Test it, not just design it — an announced DG changeover drill reveals which "essential" circuits actually restore and which were mislabeled years ago

The conversation that should happen before the outage, not during it

The building owner who says "we'll figure out priority when it happens" is choosing the worst possible moment to make that decision — under pressure, with tenants calling simultaneously, and no documented basis for whatever gets decided. The building owner who classifies loads, wires tiers, and prices backup capacity into leases converts an operational crisis into a pre-agreed, unremarkable event. The second approach costs real money in electrical segregation and slightly more complex DB design — money that is trivial next to the reputational and legal cost of an undocumented, ad-hoc shutdown of a tenant's business-critical systems.

For buildings retrofitting this after occupancy: the segregation work is more disruptive but not impossible — our electrical engineering team has done it live, circuit by circuit, without extended tenant downtime.

FAQs

What percentage of connected load should a commercial building's DG cover?

Commonly 60–80%, based on a diversity-factor study of actual coincident demand — not the sum of every tenant's connected load. The right number is project-specific; get it from a load study, not a rule of thumb.

Can tenants demand guaranteed backup power after signing a standard lease?

Only if it's contractually specified — "backup power" without a defined tier and circuit allocation is not an enforceable guarantee, which is exactly the ambiguity that causes disputes.

How do we retrofit priority tiers into an occupied building?

Load study first, then phased DB segregation by floor/wing during low-disruption windows, with each tenant migrated to their contracted tier. It takes planning but doesn't require full building shutdown.

Can you design a DG allocation framework for our building?

Yes — load classification, DB segregation design, and DG sizing as one exercise. Scope it here.

Ready to start your project?

Get a free consultation and quote. We design, take all approvals, and execute — you stay stress-free.

ONE PARTNER. END TO END. You focus on your business — we handle the rest.
Quality Safety Commitment
Chat / Get Quote