Skip to content
Secured Engineers Pvt. Ltd. logo
Home
Company Insights Resources Locations & project coverage About Founder — Er. Ankur Kaplesh
Services Mechanical / HVACElectricalPlumbingFire ProtectionLow Voltage / ELVSolar EPCMEP Consultancy & ApprovalsAMC / MaintenanceTurnkey EPCFire NOC AssistanceCEIG Liaison & EnergisationTesting & Commissioning AI Video Analytics
Industries Manufacturing & IndustrialHealthcare & HospitalsHospitality & HotelsWarehousing & LogisticsGovernment & DefenceEducation & InstitutionsData CentrePharmaceutical & CleanroomCold StorageTextile & ApparelAutomobile & Auto-ComponentsFood Processing & FMCGChemical & Process Industries
Free Tools ★ Architect & Design Resource Hub All 56 calculators Solar Financial Calculator Fire Water Storage Checker Fire Pump Room Calculator AC Tonnage Calculator DG Load Calculator MEPF Budget Calculator
Projects Work With Us Get a Free Quote
Free Tool · Solar

Solar Open Access Savings Calculator

Solar Open Access Savings Calculator — quick estimate

For consumption your roof can't serve, off-site solar over open access is the next lever. Compare your landed grid tariff against a landed open-access rate — all charges in — and see what the volume is worth per year.

Your consumption & rates

2,00,000
₹8.50
₹6.00
60%

Enter the open-access rate LANDED — PPA price plus wheeling, transmission, CSS, additional surcharge, banking and losses from your state's current orders. Eligibility for green energy open access starts at 100 kW contracted demand (GEOA Rules, 2022).

Annual saving—
Saving per unit—
Units via open access / yr—
Bill reduction—
Monthly saving—
10-yr gross saving—

Get an open-access feasibility for your factory — free

We'll price the current charges for your state and voltage, compare third-party and captive structures, and tell you the honest landed saving before you sign any PPA.

Exactly what this request will send
{}

Added automatically: this page's address, the calculator name, the time, a reference number, the pages you opened on this site in this visit, how you arrived (landing page, referring site and any campaign tags) and your device type.

🔒 Nothing from the calculator is sent unless you tick the box above.

Have a BOQ, drawing or tender for this scope? Send it for an item-wise rate-analysis review →

or reach us directly

Indicative — open-access charges are state- and voltage-specific, revised by regulatory order, and structure-dependent (third-party vs captive). A real evaluation prices the current orders for your connection.

Questions engineers and CFOs ask

What is open access solar and who is eligible?

Open access lets a consumer buy power from a generator other than the local DISCOM — typically a solar plant off-site — wheeled over the grid. Under the Green Energy Open Access Rules, 2022, consumers with 100 kW and above of contracted demand can seek green energy open access, which brought mid-sized factories into a market that used to start at 1 MW. State regulations implement the details, and they differ.

What charges reduce the headline PPA rate?

Wheeling and transmission charges, cross-subsidy surcharge (CSS), additional surcharge, banking charges or in-kind banking deductions, and losses in the state network. A ₹3.50 PPA can land at ₹5.50–6.50 after charges depending on the state and voltage level — which is why this calculator asks for the landed open-access rate, not the PPA sticker price.

Is rooftop solar or open access better for my factory?

They stack rather than compete. Rooftop behind the meter avoids the full retail tariff with no wheeling charges, so it is almost always the first move — but the roof caps its size. Open access then serves the demand your roof cannot, at a saving per unit that is smaller but applies to much larger volumes. Most large consumers end up with both.

Captive, group captive or third-party PPA — what's the difference?

In a third-party PPA you simply buy power from someone else's plant. In captive or group-captive structures you hold equity in the generating plant (26% equity and 51% self-consumption are the commonly applied tests), which under current rules can waive the cross-subsidy surcharge — often the single biggest charge. The right structure is a legal-financial decision as much as a technical one; the current state order decides what works.

Got your number — what next?

A calculator gives you a first figure. These take it further.

One of 56 free MEPF and solar calculators on this site. Every input term is defined in the engineering glossary; the specification libraries, clearance guides and checklists for design teams are in the architects' section.

Need an exact BOQ, rate analysis or measurement sheet?

This is a quick engineering estimate. For tendering, billing or audit, our QS & estimation team prepares an item-wise BOQ, rate analysis and a verified measurement sheet to IS / CPWD norms — backed by 15+ years of estimating our own projects.

ONE PARTNER. END TO END. You focus on your business — we handle the rest.
Quality Safety Commitment
Send your bill An engineer reviews it