Skip to content
Secured Engineers Pvt. Ltd. logo
Home
Company Insights Resources About Founder — Er. Ankur Kaplesh
Services Mechanical / HVACElectricalPlumbingFire ProtectionLow Voltage / ELVSolar EPCDesign & ApprovalsAMC / MaintenanceTurnkey EPCFire NOC AssistanceCEIG Liaison & EnergisationTesting & CommissioningIndustrial Audits
Industries Manufacturing & IndustrialHealthcare & HospitalsHospitality & HotelsWarehousing & LogisticsGovernment & DefenceEducation & InstitutionsData CentrePharmaceutical & CleanroomCold StorageTextile & ApparelAutomobile & Auto-ComponentsFood Processing & FMCGChemical & Process Industries
Free Tools ★ Architect & Design Resource Hub All 29 calculators Solar Savings Calculator Fire Water Tank Calculator Fire Pump Room Calculator AC Tonnage Calculator DG Set Sizing Calculator MEPF Cost Estimator
Projects Work With Us Get a Free Quote

Solar PV module supply and installation — mono-PERC, TOPCon and bifacial, ALMM and DCR options

Mono-PERC, TOPCon and bifacial PV modules selected for the site's space, irradiance and budget, with DCR/ALMM compliance where required.

Enquire: Solar PV Modules

Step 1 of 3

What do you need?
What kind of facility?
Roughly how big is the project?
Where should our engineer call you?

No forms to chase — an engineer calls you back. We never share your number.

In one paragraph

Solar PV Modules by Secured Engineers Pvt. Ltd.

Secured Engineers Pvt. Ltd. — an ISO 9001:2015-certified MEPF and solar EPC contractor with offices in Ludhiana, Punjab and Noida (Delhi NCR) — provides Solar PV Modules as part of its Solar EPC scope: Mono-PERC, TOPCon and bifacial PV modules selected for the site's space, irradiance and budget, with DCR/ALMM compliance where required. 535+ projects across 18+ Indian states.

Enquiries: +91 70099 87817 · sales@securedengineers.com · request a project proposal

Why it matters

What this system decides for your project

Modules are 50–60% of system cost and decide lifetime yield. Right technology and tier-1 makes maximise generation per sq.ft and protect the 25-year payback.

You need a quote for this if: Any rooftop or ground-mount project — the core generating asset.

Scope

Scope of work

Module selection balances efficiency against the roof or ground area available, the irradiance and temperature at the site, and the budget — higher-efficiency TOPCon or bifacial where space is the constraint, standard mono-PERC where it is not — and the compliance the project needs: ALMM-listed modules for government-linked or subsidised projects, DCR (domestic content) where the scheme mandates it. We procure from tier-1 makes with the IEC 61215 and 61730 certificates, and install the modules on the engineered structure in the string configuration the inverter design requires.

How it is delivered — and what you receive

Modules are inspected on receipt for transit damage, and their serial numbers and flash-test data are recorded against the strings they go into, so a warranty claim years later can be traced. Strings are tested for open-circuit voltage and polarity before connection. The client receives the module schedule with serial numbers, the certificates and the warranty documents.

Sources and standards

  • MNRE ALMM — Approved List of Models and Manufacturers (ALMM) for solar PV modules. Ministry of New and Renewable Energy. Publisher.Which module models and manufacturers are eligible for government-linked and subsidised solar projects.
  • IEC 61215 / IEC 61730 — IEC 61215 (design qualification) and IEC 61730 (safety qualification) — photovoltaic modules. International Electrotechnical Commission. Publisher.Module qualification and safety testing.
  • IEC 62109 — IEC 62109 — Safety of power converters for use in photovoltaic power systems. International Electrotechnical Commission. Publisher.Inverter safety.
  • CEA (Measures relating to Safety and Electric Supply) Regulations (2023 (superseding the 2010 regulations)) — Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations. Central Electricity Authority. Publisher.Safety requirements for electrical installations, inspection of HT installations before energisation, periodic inspection, earthing and protection.

Standards are cited to support the technical statements on this page. Where a standard has been revised, the edition shown is the one verified at the time of review; the edition in force for a project is the one the authority applies.

Before you ask us to quote: the Solar EPC buyer's guide lists what to have ready, what drives cost and timeline, and the approvals that usually apply.

Approved makes

Makes we specify for Solar PV Modules

Tier-1 manufacturers whose equipment we design around and install. The specification names the make; the site is held to it.

Waaree Adani Solar Vikram Solar Tata Power Solar Premier RenewSys

Need Solar PV Modules for your project?

Get a free consultation and quote. We design, take all approvals, and execute — you stay stress-free.

ONE PARTNER. END TO END. You focus on your business — we handle the rest.
Quality Safety Commitment
Send your bill 10-minute assessment