Skip to content
★ FREE Get your complete MEPF / Solar project blueprint — free · only 6 free audits left this month Claim my free blueprint →
Secured Engineers Pvt. Ltd. logo
Home
Company Insights Resources About
Services Mechanical / HVACElectricalPlumbingFire FightingLow Voltage / ELVSolar EPCDesign & ApprovalsAMC / MaintenanceTurnkey EPC
Industries Manufacturing & IndustrialHealthcare & HospitalsHospitality & HotelsWarehousing & LogisticsGovernment & DefenceEducation & Institutions
Free Tools ★ Architect & Design Resource Hub All 21 calculators Solar Savings Calculator Fire Water Tank Calculator Fire Pump Room Calculator AC Tonnage Calculator DG Set Sizing Calculator MEPF Cost Estimator
Projects Work With Us Get a Free Quote
Free Tool · Solar · For Architects

Solar vs Sanctioned-Load Checker

Solar vs Sanctioned-Load Checker — quick estimate

Most DISCOMs cap rooftop net-metering relative to your sanctioned load. Check if your proposed system fits — before you finalise the array — and see whether a load enhancement is needed.

Your connection

100 kW
90 kWp

Net-metering caps and how they are measured (kW vs kWp, AC vs DC) vary by State and DISCOM. This is an indicative check, not a sanction.

Status
Allowed under cap
Your proposed
Headroom
What to do

Get this verified by our engineers — free

We'll confirm your DISCOM's exact net-metering cap, prepare the feasibility application and, if needed, the load-enhancement route.

🔒 Your estimate is attached automatically. No spam — ever.

or reach us directly
Assumptions & formula

Formula: allowed capacity = sanctioned load × net-metering cap %. Status = "within limit" if proposed ≤ allowed, else "exceeds".

  • Cap basis (rule of thumb): many DISCOMs allow rooftop net-metering up to ~100% of sanctioned load; some cap lower or use net-billing above a threshold.
  • kW vs kWp: caps may be measured against AC inverter capacity or DC kWp — confirm the basis with your DISCOM.

Verify: net-metering caps, measurement basis and enhancement rules are State/DISCOM-specific and change. Confirm against your DISCOM's current net-metering regulations and the CEA connectivity standards.

Indicative compliance check only — not a sanction. Final capacity is decided by your DISCOM's feasibility approval.

ONE PARTNER. END TO END. You focus on your business — we handle the rest.
Quality Safety Commitment
Chat / Get Quote