Skip to content
Secured Engineers Pvt. Ltd. logo
Home
Company Insights Resources About Founder — Er. Ankur Kaplesh
Services Mechanical / HVACElectricalPlumbingFire ProtectionLow Voltage / ELVSolar EPCDesign & ApprovalsAMC / MaintenanceTurnkey EPCFire NOC AssistanceCEIG ApprovalTesting & CommissioningIndustrial Audits
Industries Manufacturing & IndustrialHealthcare & HospitalsHospitality & HotelsWarehousing & LogisticsGovernment & DefenceEducation & InstitutionsData CentrePharmaceutical & CleanroomCold StorageTextile & ApparelAutomobile & Auto-ComponentsFood Processing & FMCGChemical & Process Industries
Free Tools ★ Architect & Design Resource Hub All 29 calculators Solar Savings Calculator Fire Water Tank Calculator Fire Pump Room Calculator AC Tonnage Calculator DG Set Sizing Calculator MEPF Cost Estimator
Projects Work With Us Get a Free Quote
Free Tool · Solar · For Architects

Solar vs Sanctioned-Load Checker

Solar vs Sanctioned-Load Checker — quick estimate

Most DISCOMs cap rooftop net-metering relative to your sanctioned load. Check if your proposed system fits — before you finalise the array — and see whether a load enhancement is needed.

Your connection

100 kW
90 kWp

Net-metering caps and how they are measured (kW vs kWp, AC vs DC) vary by State and DISCOM. This is an indicative check, not a sanction.

Status
Allowed under cap
Your proposed
Headroom
What to do

Get this verified by our engineers — free

We'll confirm your DISCOM's exact net-metering cap, prepare the feasibility application and, if needed, the load-enhancement route.

🔒 Your estimate is attached automatically. No spam — ever.

or reach us directly
Assumptions & formula

Formula: allowed capacity = sanctioned load × net-metering cap %. Status = "within limit" if proposed ≤ allowed, else "exceeds".

  • Cap basis (rule of thumb): many DISCOMs allow rooftop net-metering up to ~100% of sanctioned load; some cap lower or use net-billing above a threshold.
  • kW vs kWp: caps may be measured against AC inverter capacity or DC kWp — confirm the basis with your DISCOM.

Verify: net-metering caps, measurement basis and enhancement rules are State/DISCOM-specific and change. Confirm against your DISCOM's current net-metering regulations and the CEA connectivity standards.

Indicative compliance check only — not a sanction. Final capacity is decided by your DISCOM's feasibility approval.

Need an exact BOQ, rate analysis or measurement sheet?

This is a quick engineering estimate. For tendering, billing or audit, our QS & estimation team prepares an item-wise BOQ, rate analysis and a verified measurement sheet to IS / CPWD norms — backed by 15+ years and ISO 9001:2015 quality processes.