Skip to content
Secured Engineers Pvt. Ltd. logo
Home
Company Insights Resources About Founder — Er. Ankur Kaplesh
Services Mechanical / HVACElectricalPlumbingFire ProtectionLow Voltage / ELVSolar EPCDesign & ApprovalsAMC / MaintenanceTurnkey EPCFire NOC AssistanceCEIG Liaison & EnergisationTesting & CommissioningIndustrial Audits
Industries Manufacturing & IndustrialHealthcare & HospitalsHospitality & HotelsWarehousing & LogisticsGovernment & DefenceEducation & InstitutionsData CentrePharmaceutical & CleanroomCold StorageTextile & ApparelAutomobile & Auto-ComponentsFood Processing & FMCGChemical & Process Industries
Free Tools ★ Architect & Design Resource Hub All 29 calculators Solar Savings Calculator Fire Water Tank Calculator Fire Pump Room Calculator AC Tonnage Calculator DG Set Sizing Calculator MEPF Cost Estimator
Projects Work With Us Get a Free Quote
Factory & industrial plants

Factory MEPF contractor — design, approvals and execution

Turnkey MEPF execution for new factories, plant expansions and industrial infrastructure — from design and approvals through to commissioning, under one accountable contract.

What the scope actually covers

HT/LT electrical

Substation, transformers, HT panel, LT distribution, cable schedules, earthing and lightning protection — designed to the load you will actually run, not the load on the drawing.

Firefighting & alarm

Hydrant, sprinkler, pump room, detection and alarm, designed to NBC 2016 and to what your state fire authority will accept.

HVAC & ventilation

Process ventilation, shed cooling, exhaust and make-up air — sized against heat load and air changes, not floor area.

Plumbing & drainage

Water supply, process drainage, effluent routing and sanitary works, coordinated with the civil programme.

Statutory approvals

Fire NOC, CEIG electrical inspectorate approval, factory licence support and DISCOM coordination — filed by us, in-house.

Rooftop solar

Where the shed and sanctioned load allow it, solar designed alongside the electrical scope rather than bolted on afterwards.

Where these projects go wrong

  • Five vendors, no single owner

    Electrical, fire, HVAC, plumbing and approvals let separately means every interface is a dispute waiting to happen — and the programme slips at each one.

  • Approvals treated as an afterthought

    Fire NOC and CEIG get started once the building is up. Both need drawings and design decisions taken months earlier, and retrofitting to satisfy them is the expensive way.

  • Load sized to the drawing, not the plant

    Connected load taken from a schedule nobody revisited after the machine list changed. The transformer is then either oversized and wasteful or undersized and blocking.

  • Commissioning compressed into the last fortnight

    Testing, balancing and statutory inspection get whatever time remains. That is where handover dates die.

How we deliver it

  1. 1

    Load study and scope freeze

    We start from your machine list, shifts and expansion plan — not a per-sq-ft assumption — and agree exactly what is in and out of the contract.

  2. 2

    Design and BOQ

    Single-line diagrams, layouts and a BOQ specific enough that quotes can be compared like for like.

  3. 3

    Approvals filed in parallel

    Fire NOC and CEIG documentation prepared alongside procurement rather than after execution, so inspection is not the thing holding up energisation.

  4. 4

    Execution with one site team

    One contractor across all services, so interfaces between fire, electrical and HVAC are resolved on site instead of in email.

  5. 5

    Testing, commissioning and handover

    Test reports, inspection attendance, as-builts and O&M documentation — the pack you need for both the authority and your own maintenance team.

Get a Factory MEPF Budget & Compliance Review

New plant, expansion or upgrade — we'll come back with an indicative budget, the approvals that apply, and where the programme risk sits.

Questions we get asked

Do you work on running plants or only new builds?

Both. Expansions and upgrades inside a live plant are a large share of our work, and they are a different discipline from greenfield — shutdown windows, temporary supplies, and sequencing around production are planned into the programme rather than improvised.

Can you take the statutory approvals as well as the works?

Yes, and that is the main reason clients single-source with us. Fire NOC and CEIG approval are filed by our own team. Approvals are our core trade as an MEPF contractor, not something we sub out to a consultant.

How early should we bring you in?

At the point the building layout is being fixed. Plant room sizes, shafts, cable routes and the fire strategy all constrain the civil design, and the cheapest time to change them is before concrete.

What do you need to give an indicative budget?

Built-up area, occupancy or process type, connected load if you have it, and your target handover date. Drawings or a tender BOQ make the number much tighter — you can attach or WhatsApp them with the form below.

Send us your drawings, BOQ or bill

An engineer will review it and come back with scope, budget range and the approvals that apply — usually within one business day.

ONE PARTNER. END TO END. You focus on your business — we handle the rest.