Skip to content
Secured Engineers Pvt. Ltd. logo
Home
Company Insights Resources About Founder — Er. Ankur Kaplesh
Services Mechanical / HVACElectricalPlumbingFire ProtectionLow Voltage / ELVSolar EPCDesign & ApprovalsAMC / MaintenanceTurnkey EPCFire NOC AssistanceCEIG Liaison & EnergisationTesting & Commissioning
Industries Manufacturing & IndustrialHealthcare & HospitalsHospitality & HotelsWarehousing & LogisticsGovernment & DefenceEducation & InstitutionsData CentrePharmaceutical & CleanroomCold StorageTextile & ApparelAutomobile & Auto-ComponentsFood Processing & FMCGChemical & Process Industries
Free Tools ★ Architect & Design Resource Hub All 29 calculators Solar Savings Calculator Fire Water Tank Calculator Fire Pump Room Calculator AC Tonnage Calculator DG Set Sizing Calculator MEPF Cost Estimator
Projects Work With Us Get a Free Quote

HT/LT Electrical Contractor for Industrial Plants

We build electrical backbones that keep facilities running — from HT/LT distribution and substations to panels, cabling, lighting and backup power, all to IS/IEC standards.

Enquire: Electrical

Step 1 of 3

What do you need?
What kind of facility?
Roughly how big is the project?
Where should our engineer call you?

No forms to chase — an engineer calls you back. We never share your number.

Architects & PMCs — verify before you shortlist

Compliance, certification & single-point accountability

  • ISO 9001:2015 Certified quality management
  • Fire-NOC Designed & liaised in-house
  • CEIG approval Electrical inspectorate clearance
  • DISCOM net-metering Solar grid synchronisation
  • Single-point responsibility One accountable MEPF team
  • MSME registered Govt.-recognised contractor
In one paragraph

Electrical by Secured Engineers Pvt. Ltd.

Secured Engineers Pvt. Ltd. is an ISO 9001:2015-certified MEPF and solar EPC contractor, in business since 2011, with its registered office in Ludhiana, Punjab and corporate office in Noida, Uttar Pradesh (Delhi NCR). For electrical, Secured Engineers Pvt. Ltd. designs, installs, tests and energises HT/LT electrical infrastructure — 11/33 kV substations and HT/LT distribution, transformers and DG sets, LT panels (PCC, MCC, APFC), cabling, cable trays and bus ducts, lighting and small power, and earthing and lightning protection — for factories, warehouses, commercial buildings and institutions, including the CEIG and DISCOM approvals needed to energise. 535+ projects across 18+ Indian states.

Enquiries: +91 70099 85817 · sales@securedengineers.com · request a project proposal

What We Deliver

Reliable power, safely engineered.

  • HT/LT power distribution & substations
  • Transformers, DG sets & synchronisation
  • LT panels, MCC/PCC & bus ducts
  • Cable trays, cabling & terminations
  • Internal & external lighting design
  • Earthing, lightning protection & energy metering
Systems & Products

Every Electrical system we engineer — and why it matters

Explore each system below. We've kept it plain: what it is, why it matters for your project, the standards we build to, and the approved makes we use — so you can decide exactly which systems to get a quote for.

Built to: IS 732 wiringIS 3043 earthingIEC 61439 panelsIS/IEC 60947CEA RegulationsNBC 2016 Part 8

HT / LT Distribution & Substations

High- and low-tension power distribution, indoor/outdoor substations, RMUs, VCBs and metering — designed, installed and tested to CEA norms.

Full scope of work, delivery and related tools →

Why it matters

The substation is where reliability and safety begin. Correct protection coordination and CEA-compliant design prevent outages, equipment damage and inspection delays.

  • Up to 33 kV HT
  • RMU / VCB switchgear
  • Protection relays & coordination
  • CEA / CEIG compliant
Approved makes & standards we use
ABB Schneider Siemens L&T
Factories, campuses or buildings drawing HT supply or needing a new substation.

Transformers & DG Sets

Power and distribution transformers plus diesel-generator sets with AMF panels and synchronisation for seamless backup power.

Full scope of work, delivery and related tools →

Why it matters

Uptime depends on backup that switches in cleanly. Properly sized transformers and synchronised DG sets protect operations from grid failure without over-spending on capacity.

  • Distribution & power TX
  • DG 25 kVA–2 MVA
  • AMF & auto-synchronisation
  • Acoustic & emission compliant
Approved makes & standards we use
Kirloskar Cummins Mahindra Powerol ABB Crompton Voltamp
Any facility needing standby power, a captive transformer or DG synchronisation.

LT Panels — PCC / MCC / APFC

Power and motor control centres, main and sub-distribution boards and automatic power-factor-correction panels, built to IEC 61439 with type-tested components.

Full scope of work, delivery and related tools →

Why it matters

Panels are the nerve centre of distribution. Type-tested designs and APFC keep the system safe, avoid penalty on power factor and reduce energy bills.

  • IEC 61439 type-tested
  • Up to 6300 A bus
  • Form 3b/4b segregation
  • APFC / RTPFC correction
Approved makes & standards we use
Schneider ABB Siemens L&T
New buildings, plant expansions or sites facing power-factor penalties.

Cabling, Cable Trays & Bus Ducts

LT/HT cabling, terminations, GI/perforated cable trays, raceways and sandwich bus ducts for high-current risers.

Full scope of work, delivery and related tools →

Why it matters

Under-sized or poorly laid cable is a fire and voltage-drop risk. Engineered cable schedules and bus ducts carry load safely and make future maintenance simple.

  • FR / FRLS / XLPE cable
  • Sized for voltage drop & derating
  • GI / ladder trays
  • Sandwich bus ducts
Approved makes & standards we use
Polycab KEI Finolex Havells RR Kabel
Any project laying new power distribution, risers or high-current feeders.

Lighting & Small Power

Indoor and outdoor lighting design, LED fixtures, lux-level engineering, small-power layouts and lighting controls.

Full scope of work, delivery and related tools →

Why it matters

Good lighting design hits the right lux at the lowest wattage — cutting energy while meeting workplace and safety norms. Controls add daylight and occupancy savings.

  • Lux / uniformity design
  • LED & high-bay fixtures
  • Daylight & occupancy controls
  • Façade & landscape lighting
Approved makes & standards we use
Philips Crompton Havells Wipro Bajaj Anchor
Offices, factories, warehouses or campuses needing engineered lighting.

Earthing & Lightning Protection

IS 3043 earthing systems, equipotential bonding and conventional/ESE lightning-protection systems with documented earth-pit testing.

Full scope of work, delivery and related tools →

Why it matters

Earthing protects both people and sensitive electronics; lightning protection prevents catastrophic strikes. Both are inspected and are the cheapest insurance in the build.

  • IS 3043 earthing
  • Maintenance-free earth pits
  • Equipotential bonding
  • Conventional / ESE LPS
Approved makes & standards we use
Ashlok JEF Indelec nVent ERICO
Every building — essential for safety, equipment protection and statutory sign-off.

Scope of services — what each stage delivers

Every Electrical engagement runs through the same four accountable stages. This is the deliverable list we are held to — not a brochure summary.

Stage-wise scope of services for Electrical: deliverables, governing codes, output artefact and typical duration
Stage Deliverables Codes & standards referenced Output artefact Typical duration
1 Design & Sizing
  • Load schedule, demand assessment and diversity working
  • Transformer, DG and panel sizing with fault-level calculation
  • Cable sizing with derating and voltage-drop checks
  • Earthing and lightning-protection design
  • Single-line diagram and panel schedules
CEA (Safety) Regulations 2023 · IS 732 (wiring practice) · IS 3043 (earthing) · IEC 61439 (assemblies) · IS/IEC 62305 (lightning) Approved SLD + load schedule + fault-level study 2–4 weeks
2 Statutory Approvals
  • Electrical Inspectorate (CEIG) drawing submission for HT works
  • DISCOM load sanction / enhancement coordination
  • Pre-commissioning inspection scheduling
CEA (Safety) Regulations 2023 · State Electrical Inspectorate procedures · DISCOM supply code CEIG drawing approval + sanctioned load 4–10 weeks (authority timeline)
3 Procurement & Execution
  • Substation, transformer and panel installation
  • Cable laying, termination and dressing to spec
  • Earthing grid and lightning-protection installation
  • Busbar/riser and distribution board erection
IS 732 · IS 3043 · IEC 61439 Erection completion + torque and termination records 8–20 weeks
4 Testing, Commissioning & Handover
  • Insulation-resistance, earth-resistance and relay tests
  • CEIG pre-commissioning inspection and energisation
  • Thermographic baseline of boards under load
  • As-built SLDs, test registers and AMC onboarding
CEA (Safety) Regulations 2023 · IS 3043 CEIG energisation approval + test register + O&M manual 2–4 weeks

Durations are typical bands for a straightforward site and move with project size, authority workload and client approvals. Stage 2 timelines belong to the statutory authority, not the contractor — what we control is a submission that passes first time.

Buyer's guide

Before you ask us to quote electrical

Secured Engineers Pvt. Ltd. quotes electrical for industrial, commercial and institutional facilities across India, and this is what its engineers ask for first. What to have ready, what moves the price and the programme, which approvals apply, and the mistakes seen most often — so the first conversation is a useful one.

What to have ready

  • Connected-load list and estimated maximum demand
  • DISCOM sanctioned load, or the status of the load application
  • Single-line diagram if one exists, and the site plan showing the substation location
  • Process equipment list with ratings and starting characteristics
  • Backup power requirement — which loads are critical, and for how long
  • Power-quality needs such as harmonic limits or power-factor targets
  • Details of the existing installation if this is an expansion
  • Target energisation date

What drives the cost

  • Sanctioned load and supply voltage — an HT connection adds a substation, metering and CEIG scope
  • Transformer and DG capacity, and whether DG sets must synchronise
  • Number and rating of panels, and the level of protection and metering specified
  • Cable lengths and sizes, and copper versus aluminium conductors
  • Bus duct versus cable for high-current risers
  • Lighting type and target lux levels by area
  • Soil resistivity — dry or rocky ground needs more electrodes and treatment to reach the earthing values required
  • Redundancy such as dual feeders, automatic transfer or ring mains

What drives the timeline

  • DISCOM load sanction and metering — the connection agreement gates the programme
  • CEIG drawing approval, which must precede substation construction
  • Transformer and switchgear lead times
  • Civil readiness of the substation, cable trenches and DG foundations
  • Inspection scheduling and shortfall closure before energisation
  • Coordination of cable routes with other trades

Approvals that usually apply

  • DISCOM load sanction and connection agreement
  • CEIG / Electrical Inspector drawing approval and inspection for HT installations, and for the classes of LT installation each state notifies — commonly DG sets, lifts and larger buildings
  • State pollution-board consent for DG sets, with CPCB-compliant acoustic enclosures and emission norms
  • Licensed electrical contractor and supervisor credentials, which the inspectorate checks at submission

Standards and codes we design to

  • IS 732 wiring
  • IS 3043 earthing
  • IEC 61439 panels
  • IS/IEC 60947
  • CEA Regulations
  • NBC 2016 Part 8

Maintenance after handover

Transformer oil testing, thermographic scanning of panels and joints, relay and protection testing, earthing resistance measured and recorded before each monsoon, DG servicing and load tests, APFC capacitor health checks, and lux-level verification — plus the periodic CEIG inspection where the installation class requires it.

See our AMC and maintenance scope →

Mistakes we see most often

  • Applying for sanctioned load without a proper load estimate, then under- or over-sanctioning
  • Starting substation civil work before the CEIG drawing approval
  • Treating earthing as an afterthought rather than a designed and measured system
  • No discrimination study, so an upstream breaker trips before the one nearest the fault
  • Running cables without derating for grouping, ambient temperature or installation method
  • Ignoring power factor until the penalty appears on the bill
  • Adding DG sets without deciding the AMF or synchronising scheme first

Have most of this to hand? Enquire about electrical or request a proposal — a site survey and concept design come first, at no cost.

Why only Secured Engineers Pvt. Ltd.

Why clients pick us for Electrical

We don't just supply a system — we design it, get it approved, and execute it as one accountable team.

We own the approvals

Fire-NOC, CEIG and DISCOM handled in-house — so your electrical scope clears inspection the first time.

One team, all MEPF

No finger-pointing between trades. A single accountable partner from design to commissioning.

535+ projects, 89.77% repeat

15+ years across 18+ states, 93.32% delivered early — proof, not promises.

Approved makes only

Tier-1 brands and IS/IEC-grade materials on every system — never the cheapest substitute.

Explore Other Services

HVAC contractor

Precision cooling, ventilation & thermal comfort.

PHE contractor

Water, drainage & public health, done right.

Fire fighting contractor

Life-safety systems you can rely on.

ELV contractor

Smart, secure, connected buildings.

Related guides and tools

FAQ

Electrical — frequently asked questions

Do you handle CEIG / electrical inspectorate approvals?

Yes — we prepare the design and drawings and obtain CEIG/electrical-inspectorate approval and DISCOM sanction in-house, so your HT/LT installation clears inspection and is energised on schedule.

Can you design HT/LT distribution and substations for a factory?

Yes. We engineer HT/LT distribution, substations, transformers, synchronised DG sets, APFC panels and protection coordination sized for heavy industrial loads — furnaces, motors, CNC lines and process equipment.

Do you install EV charging and APFC for power-factor penalties?

We install EV charging infrastructure and APFC/capacitor-bank systems that correct power factor and eliminate utility penalties, often paying for themselves within a year on a high-load site.

Are your installations built to Indian standards?

Every installation follows IS/IEC norms and NBC 2016, with tier-1 approved makes only — never the cheapest substitute — and full protection coordination for safety and reliability.

Need Electrical for your project?

Get a free consultation and quote. We design, take all approvals, and execute — you stay stress-free.

ONE PARTNER. END TO END. You focus on your business — we handle the rest.
Quality Safety Commitment
Chat / Get Quote