Skip to content
Secured Engineers Pvt. Ltd. logo
Home
Company Insights Resources Locations & project coverage About Founder — Er. Ankur Kaplesh TEDx talk, books & interviews
Services Mechanical / HVACElectricalPlumbingFire ProtectionLow Voltage / ELVSolar EPCMEP Consultancy & ApprovalsAMC / MaintenanceTurnkey EPCFire NOC AssistanceCEIG Liaison & EnergisationTesting & Commissioning AI Video Analytics
Industries Manufacturing & IndustrialHealthcare & HospitalsHospitality & HotelsWarehousing & LogisticsGovernment & DefenceEducation & InstitutionsData CentrePharmaceutical & CleanroomCold StorageTextile & ApparelAutomobile & Auto-ComponentsFood Processing & FMCGChemical & Process Industries
Free Tools ★ Architect & Design Resource Hub All 56 calculators Solar Financial Calculator Fire Water Storage Checker Fire Pump Room Calculator AC Tonnage Calculator DG Load Calculator MEPF Budget Calculator
Projects Work With Us Submit RFQ Get a Free Quote

LT panel contractor and consultant —PCC, MCC and APFC panels built to IEC 61439

Power and motor control centres, distribution boards and automatic power-factor-correction panels, with the applicable IEC 61439 assembly requirements defined in the specification.

Enquire: LT Panels — PCC / MCC / APFC

Step 1 of 3

What do you need?
What kind of facility?
Roughly how big is the project?
Where should our engineer call you?

No forms to chase — an engineer calls you back. We never share your number.

Plan this system

How do PCC, MCC and APFC panel scopes differ?

A PCC distributes power, an MCC controls motor feeders, and an APFC panel switches reactive compensation. Their selections share an electrical scheme but require different feeder, control and power-quality information.

Acceptance evidence to agree
Request the assembly verification records, approved drawings, protection settings and functional test schedule appropriate to the specified panel.

Prepare your enquiry and compare the installation scope →

IEC TR 61439-0:2022 — guidance to specifying assemblies — The publisher describes the characteristics a specifier must define and verification of the complete assembly under the relevant IEC 61439 part.

Use this checklist to define the brief. Final selections and acceptance criteria depend on the site, applicable requirements and approved project design.

In one paragraph

LT Panels — PCC / MCC / APFC by Secured Engineers Pvt. Ltd.

Secured Engineers Pvt. Ltd. — an MEPF & solar EPC contractor and consultant with offices in Ludhiana, Punjab and Noida (Delhi NCR) — provides LT Panels — PCC / MCC / APFC as part of its Electrical scope: Power and motor control centres, distribution boards and automatic power-factor-correction panels, with the applicable IEC 61439 assembly requirements defined in the specification. 535+ projects across 18+ Indian states.

Enquiries: +91 70099 85817 · sales@securedengineers.com · request a project proposal

Why it matters

What this system decides for your project

Panels distribute and control electrical loads. Assembly verification and coordinated protection address the specified duties; reactive compensation must be selected for the load, harmonics and applicable tariff rather than treated as an automatic energy saving.

You need a quote for this if: New buildings, plant expansions or sites facing power-factor penalties.

Scope

Scope of work

Panels are designed from the single-line diagram — incomer and outgoing ratings, fault level, the form of internal separation the client's safety standard calls for, metering and protection relays, and the interlocks between incomers and bus couplers. Motor control centres carry the starters, drives and control logic the process needs; APFC panels are sized from the measured or calculated reactive demand, with detuned reactors where harmonics warrant them. We prepare the panel specification and drawings, require assembly verification to the applicable IEC 61439 part, and install the panels and terminate the cabling. Approved component makes do not replace verification of the assembly.

How it is delivered — and what you receive

Panels are inspected at the factory before dispatch and tested on site — insulation resistance, functional checks of every breaker, relay and interlock, and secondary injection of the protection relays. The APFC panel is commissioned against a live power-factor reading so the steps actually correct the load present. The client receives the general-arrangement drawings, the schematic, the relay settings and the test reports, which is also the record the CEIG inspection looks at.

Sources and standards

  • IS 732 (2019) — IS 732 — Code of Practice for Electrical Wiring Installations. Bureau of Indian Standards. Publisher. Low-voltage wiring installations — cable selection, protection, installation methods.
  • IS 3043 (2018) — IS 3043 — Code of Practice for Earthing. Bureau of Indian Standards. Publisher. Earthing system design, electrodes, resistance values and testing.
  • IEC 61439 — IEC 61439 — Low-voltage switchgear and controlgear assemblies. International Electrotechnical Commission. Publisher. Design verification and type-testing of LT panels — PCC, MCC, distribution boards.
  • CEA (Measures relating to Safety and Electric Supply) Regulations (2023 (superseding the 2010 regulations)) — Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations. Central Electricity Authority. Publisher. Safety requirements for electrical installations, inspection of HT installations before energisation, periodic inspection, earthing and protection.
  • NBC 2016 Part 8 (2016) — National Building Code of India 2016, Part 8 — Building Services. Bureau of Indian Standards. Publisher. Lighting, ventilation, air-conditioning, electrical installations, lifts and escalators — the building-services framework.

Standards are cited to support the technical statements on this page. Where a standard has been revised, the edition shown is the one verified at the time of review; the edition in force for a project is the one the authority applies.

Before you ask us to quote: the Electrical buyer's guide lists what to have ready, what drives cost and timeline, and the approvals that usually apply. Writing the tender? The electrical specification library has 5 code-referenced clauses architects and consultants can drop into tender documents.

Before requesting a proposal

Give panel bidders a common specification

A PCC distributes power, an MCC controls motors and an APFC panel corrects reactive demand. A new process line, a panel replacement and a power-factor problem require different evidence before a panel can be specified.

What to send with your enquiry

  • Single-line diagram, incomer and outgoing schedule, supply fault level and transformer or upstream protection details.
  • Motor ratings and starting methods for an MCC; power-factor readings and available harmonic measurements for an APFC enquiry.
  • Installation environment, access dimensions, cable-entry arrangement and required segregation or enclosure specification.
  • Approved makes, metering and control interfaces, spare ways and the shutdown window for a replacement.

Compare the same scope

Ask for the assembly verification documentation, general arrangement, component schedule and routine test records applicable to the offered panel. Compare cabling, terminations, interlocks, relay settings and commissioning as named items. Component certificates alone do not describe the complete panel offered.

Discuss this system's scope with our team →

Approved makes

Makes we specify for LT Panels — PCC / MCC / APFC

Tier-1 manufacturers whose equipment we design around and install. The specification names the make; the site is held to it.

Schneider ABB Siemens L&T

Need LT Panels — PCC / MCC / APFC for your project?

Get a free consultation and quote. We design, prepare and file your approvals, and execute — you deal with one team.

ONE PARTNER. END TO END. You focus on your business — we handle the rest.
Quality Safety Commitment
Speak to a Lead Engineer