Skip to content
Secured Engineers Pvt. Ltd. logo
Home
Company Insights Resources Locations & project coverage About Founder — Er. Ankur Kaplesh TEDx talk, books & interviews
Services Mechanical / HVACElectricalPlumbingFire ProtectionLow Voltage / ELVSolar EPCMEP Consultancy & ApprovalsAMC / MaintenanceTurnkey EPCFire NOC AssistanceCEIG Liaison & EnergisationTesting & Commissioning AI Video Analytics
Industries Manufacturing & IndustrialHealthcare & HospitalsHospitality & HotelsWarehousing & LogisticsGovernment & DefenceEducation & InstitutionsData CentrePharmaceutical & CleanroomCold StorageTextile & ApparelAutomobile & Auto-ComponentsFood Processing & FMCGChemical & Process Industries
Free Tools ★ Architect & Design Resource Hub All 56 calculators Solar Financial Calculator Fire Water Storage Checker Fire Pump Room Calculator AC Tonnage Calculator DG Load Calculator MEPF Budget Calculator
Projects Work With Us Submit RFQ Get a Free Quote

Industrial and commercial lighting contractor and consultant —lux-level design, LED fixtures and controls

Indoor and outdoor lighting design, LED fixtures, lux-level engineering, small-power layouts and lighting controls.

Enquire: Lighting & Small Power

Step 1 of 3

What do you need?
What kind of facility?
Roughly how big is the project?
Where should our engineer call you?

No forms to chase — an engineer calls you back. We never share your number.

Plan this system

What should an industrial lighting quotation demonstrate?

A lighting proposal should demonstrate performance at the working plane and suit the actual task, mounting height and environment. Installed wattage and fixture count alone cannot establish useful illumination.

Acceptance evidence to agree
Agree the calculation assumptions and a site measurement plan, including the working plane and measurement locations.

Prepare your enquiry and compare the installation scope →

Use this checklist to define the brief. Final selections and acceptance criteria depend on the site, applicable requirements and approved project design.

In one paragraph

Lighting & Small Power by Secured Engineers Pvt. Ltd.

Secured Engineers Pvt. Ltd. — an MEPF & solar EPC contractor and consultant with offices in Ludhiana, Punjab and Noida (Delhi NCR) — provides Lighting & Small Power as part of its Electrical scope: Indoor and outdoor lighting design, LED fixtures, lux-level engineering, small-power layouts and lighting controls. 535+ projects across 18+ Indian states.

Enquiries: +91 70099 85817 · sales@securedengineers.com · request a project proposal

Why it matters

What this system decides for your project

Good lighting design hits the right lux at the lowest wattage — cutting energy while meeting workplace and safety norms. Controls add daylight and occupancy savings.

You need a quote for this if: Offices, factories, warehouses or campuses needing engineered lighting.

Scope

Scope of work

Lighting is designed area by area to the lux level and uniformity the task and the workplace norms require, using photometric calculation rather than a fixtures-per-square-foot rule, with the fixture type — high-bay, linear, downlight, façade or landscape — chosen for mounting height, environment and maintenance access. Controls add daylight harvesting and occupancy switching where the savings justify them. Small power covers the socket-outlet and equipment layouts, the distribution boards that feed them and the circuit protection. We supply and install the fixtures, wiring, boards and controls.

How it is delivered — and what you receive

Lux levels are measured on completion and compared with the design, because a fixture count on a drawing is not a lit room. Emergency lighting and exit signage are tested on battery for the duration the code requires and recorded for the Fire NOC. Control scenes are commissioned and documented. The client receives the lux survey, the circuit schedules and the control programming.

Sources and standards

  • IS 732 (2019) — IS 732 — Code of Practice for Electrical Wiring Installations. Bureau of Indian Standards. Publisher. Low-voltage wiring installations — cable selection, protection, installation methods.
  • IS 3043 (2018) — IS 3043 — Code of Practice for Earthing. Bureau of Indian Standards. Publisher. Earthing system design, electrodes, resistance values and testing.
  • IEC 61439 — IEC 61439 — Low-voltage switchgear and controlgear assemblies. International Electrotechnical Commission. Publisher. Design verification and type-testing of LT panels — PCC, MCC, distribution boards.
  • CEA (Measures relating to Safety and Electric Supply) Regulations (2023 (superseding the 2010 regulations)) — Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations. Central Electricity Authority. Publisher. Safety requirements for electrical installations, inspection of HT installations before energisation, periodic inspection, earthing and protection.
  • NBC 2016 Part 8 (2016) — National Building Code of India 2016, Part 8 — Building Services. Bureau of Indian Standards. Publisher. Lighting, ventilation, air-conditioning, electrical installations, lifts and escalators — the building-services framework.

Standards are cited to support the technical statements on this page. Where a standard has been revised, the edition shown is the one verified at the time of review; the edition in force for a project is the one the authority applies.

Before you ask us to quote: the Electrical buyer's guide lists what to have ready, what drives cost and timeline, and the approvals that usually apply. Writing the tender? The electrical specification library has 5 code-referenced clauses architects and consultants can drop into tender documents.

Before requesting a proposal

Prepare an industrial lighting or office fit-out enquiry

For a factory retrofit, define the working task and access constraints before replacing fittings. For an office fit-out, coordinate the lighting, small power and controls with the partition and furniture layout.

What to send with your enquiry

  • Site location, floor plans, mounting heights, working areas and the tasks performed in each area.
  • Existing fitting inventory, wattages, operating hours and measured light levels where available for a retrofit.
  • Furniture or machine layout, available circuits, emergency-lighting requirements and the proposed controls.
  • Working-at-height access, occupied-area restrictions and the installation or shutdown programme.

Compare the same scope

Compare the lighting calculation and fitting schedule alongside wiring, containment, access equipment, controls and the completion survey. A lower fixture wattage is useful only if the required lighting and operating conditions are still met.

Relevant project record

The DEE Piping office-block case shows suspended linear LED lighting, cabin lighting and desk power coordinated with exposed building services. Its published scope is MEPF execution; statutory approvals and liaisoning remained with the client. Read Office MEPF — DEE Piping, Anjar →

Discuss this system's scope with our team →

Approved makes

Makes we specify for Lighting & Small Power

Tier-1 manufacturers whose equipment we design around and install. The specification names the make; the site is held to it.

Philips Crompton Havells Wipro Bajaj Anchor

Need Lighting & Small Power for your project?

Get a free consultation and quote. We design, prepare and file your approvals, and execute — you deal with one team.

ONE PARTNER. END TO END. You focus on your business — we handle the rest.
Quality Safety Commitment
Speak to a Lead Engineer