Solar Subsidy Calculator — PM Surya Ghar — quick estimate
See exactly how much central subsidy a home rooftop solar system attracts under PM Surya Ghar: Muft Bijli Yojana — and where the cap bites. Residential connections only; factories and shops get ₹0 under this scheme.
Your system
Slabs as nationally published (verified 2026-08-26): ₹30,000/kW up to 2 kW, ₹18,000 for the 3rd kW, capped at ₹78,000. States may add their own on top.
Get a subsidy-ready quote for your home — free
We install through the registered-vendor route so the subsidy is actually released. Tell us your roof and we'll send the right size, price and net cost after subsidy.
Your request is in
Thanks! Our team will send your system size, price and net-of-subsidy cost within one business day.
Central subsidy only, per the nationally published structure — state top-ups vary. Rates are set by government order and change; confirm on pmsuryaghar.gov.in before committing.
Questions engineers and CFOs ask
How much subsidy do I get under PM Surya Ghar?
The nationally published structure is ₹30,000 per kW for the first 2 kW and ₹18,000 for the third kW, capping at ₹78,000 for 3 kW and above. So 1 kW attracts ₹30,000, 2 kW attracts ₹60,000 and 3 kW or larger attracts ₹78,000. Rates are set by government order and can change — confirm the current position on pmsuryaghar.gov.in before you commit.
Does my factory or shop get this subsidy?
No. PM Surya Ghar applies to grid-connected rooftop systems on residential electricity connections only — commercial and industrial connections get ₹0 under this scheme. For a business the economics run instead on the tariff you avoid, accelerated depreciation and GST input credit, which together are usually worth more than the residential subsidy anyway.
When and how is the subsidy paid?
It is disbursed to your bank account after installation and inspection — it is not deducted from the installer's quoted price up front. You pay the full system price first, register through the national portal, and the central subsidy follows once the installation is inspected and approved. Only installations by registered vendors qualify.
Is a bigger system always better for the subsidy?
No — the subsidy caps at ₹78,000, which 3 kW already reaches. Every kW beyond 3 is entirely self-funded, so 3 kW is the natural stopping point for most homes. 2 kW is actually the best subsidy-per-rupee point, since both kW attract the full ₹30,000 rate. Go larger only when your consumption genuinely justifies it.