Net-metering rules decide how a plant connects; a separate MNRE framework decides which modules it may use. For net-metered and open-access projects, ALMM List-I applies and the List-II (cell) exemption turns on whether the plant commissions by 31 December 2026 — read the ALMM List-II commissioning guide before choosing modules, whichever state you are in.

Statutory approvals

DISCOM Net-Metering & CEIG Applications Prepared and Filed In-House.

Approvals are our core trade as an MEPF contractor and consultant — not something we sub out and hope for. You sign, we file, we follow up.

  1. 1

    Feasibility & application

    Load study, single-line diagram and the net-metering application prepared and filed.

  2. 2

    CEIG / Electrical Inspector

    Drawings, test reports and the inspection itself — coordinated and attended by our team.

  3. 3

    Synchronisation & meter

    Bi-directional meter, DISCOM sign-off and grid synchronisation, through to commissioning.

Not sure which approvals your project needs?

Send us your sanctioned load and latest bill. We'll tell you which approvals apply, in what order, and what the realistic timeline looks like in your state.