Skip to content
Secured Engineers Pvt. Ltd. logo
Home
Company Insights Resources About Founder — Er. Ankur Kaplesh
Services Mechanical / HVACElectricalPlumbingFire ProtectionLow Voltage / ELVSolar EPCDesign & ApprovalsAMC / MaintenanceTurnkey EPCFire NOC AssistanceCEIG ApprovalTesting & CommissioningIndustrial Audits
Industries Manufacturing & IndustrialHealthcare & HospitalsHospitality & HotelsWarehousing & LogisticsGovernment & DefenceEducation & InstitutionsData CentrePharmaceutical & CleanroomCold StorageTextile & ApparelAutomobile & Auto-ComponentsFood Processing & FMCGChemical & Process Industries
Free Tools ★ Architect & Design Resource Hub All 29 calculators Solar Savings Calculator Fire Water Tank Calculator Fire Pump Room Calculator AC Tonnage Calculator DG Set Sizing Calculator MEPF Cost Estimator
Projects Work With Us Get a Free Quote
Solar policy · Haryana

Haryana rooftop solar: net-metering & approvals

Who approves what, in what order, and where files actually stall — for C&I rooftop solar in Haryana. Written by the team that files these applications.

Net-metering authority

DHBVN (south — 12 districts incl. Gurugram, Faridabad, Rewari) + UHBVN (north — incl. Panchkula, Sonipat, Rohtak)

Electrical safety approval

Chief Electrical Inspector to Government, Haryana

The approval route, in order

  1. 1

    Feasibility & sanctioned-load check

    Confirm your connection can carry the plant. DHBVN caps rooftop capacity against sanctioned load in most cases, and the exact measure varies — we check the current rule for your connection rather than assume.

  2. 2

    Net-metering application

    Filed with DHBVN, with the load study, single-line diagram and site details. Incomplete drawings are the single most common cause of a file sitting still.

  3. 3

    Technical feasibility approval

    DHBVN assesses transformer headroom and the feeder. A refusal here is usually about the network, not your roof — and often solvable with a design change.

  4. 4

    Installation & CEIG approval

    Chief Electrical Inspector to Government, Haryana inspects and approves the installation. Drawings, test reports and the inspection itself are coordinated by our team.

  5. 5

    Bi-directional meter & synchronisation

    Meter installed, agreement executed, plant synchronised. Export begins once the meter is in and the agreement is countersigned.

Caps, banking terms and subsidy positions are set by state policy and revised periodically. We deliberately do not publish a figures table that would go stale — we confirm the rule that applies to your connection at feasibility stage, in writing.

Statutory approvals

100% DISCOM Net-Metering & CEIG Approvals Handled In-House — Zero Bureaucracy for You.

Approvals are our core trade as an MEPF contractor. We run Haryana net-metering and CEIG filings ourselves — you sign, we file, we follow up.

  1. 1

    Feasibility & application

    Load study, single-line diagram and the net-metering application prepared and filed.

  2. 2

    CEIG / Electrical Inspector

    Drawings, test reports and the inspection itself — coordinated and attended by our team.

  3. 3

    Synchronisation & meter

    Bi-directional meter, DISCOM sign-off and grid synchronisation, through to commissioning.

Free · 30 seconds

What would solar save your Haryana facility?

Three inputs. Your numbers appear before we ask for anything.

  1. 1 Your site
  2. 2 Your numbers
  3. 3 Full report
Roof type

Industrial estates we serve in Haryana

Haryana net-metering questions

Who approves rooftop solar net-metering in Haryana?

DHBVN (south — 12 districts incl. Gurugram, Faridabad, Rewari) + UHBVN (north — incl. Panchkula, Sonipat, Rohtak) handles the net-metering application, technical feasibility and the bi-directional meter. Chief Electrical Inspector to Government, Haryana handles the electrical safety approval for the installation. They are separate approvals with separate timelines, and both are required before you can export.

Is there a cap on how much solar I can install in Haryana?

Most DISCOMs cap rooftop net-metering relative to your sanctioned load or contract demand, and the measure used — kW against kWp, AC against DC — differs by state and is revised periodically. Rather than quote a number that may be out of date by the time you read it, we check the rule that currently applies to your connection and tell you whether a load enhancement is worth filing alongside. Our free sanctioned-load checker gives an indicative answer in seconds.

How long do the approvals take?

It depends on the DISCOM, the completeness of the file and whether the feeder has headroom. Our published guide on net-metering delays in UP, Punjab and Haryana is written from filings we have actually run, and describes where files stall in practice rather than what the timeline says on paper.

Do you handle the paperwork or do I?

We do, in-house — the net-metering application, the CEIG approval and synchronisation. Approvals are our core trade as an MEPF contractor, not something we sub out.

Planning rooftop solar in Haryana?

We file DHBVN net-metering and Chief Electrical Inspector to Government, Haryana approvals in-house. Send your latest bill and we'll come back with a feasibility view.

ONE PARTNER. END TO END. You focus on your business — we handle the rest.
Quality Safety Commitment
Send your bill 10-minute assessment