Skip to content
Secured Engineers Pvt. Ltd. logo
Home
Company Insights Resources Locations & project coverage About Founder — Er. Ankur Kaplesh
Services Mechanical / HVACElectricalPlumbingFire ProtectionLow Voltage / ELVSolar EPCMEP Consultancy & ApprovalsAMC / MaintenanceTurnkey EPCFire NOC AssistanceCEIG Liaison & EnergisationTesting & Commissioning AI Video Analytics
Industries Manufacturing & IndustrialHealthcare & HospitalsHospitality & HotelsWarehousing & LogisticsGovernment & DefenceEducation & InstitutionsData CentrePharmaceutical & CleanroomCold StorageTextile & ApparelAutomobile & Auto-ComponentsFood Processing & FMCGChemical & Process Industries
Free Tools ★ Architect & Design Resource Hub All 56 calculators Solar Financial Calculator Fire Water Storage Checker Fire Pump Room Calculator AC Tonnage Calculator DG Load Calculator MEPF Budget Calculator
Projects Work With Us Get a Free Quote
Solar

Solar EPC

Solar EPC is the delivery of a photovoltaic plant — rooftop or ground-mount — as one contract covering engineering (feasibility, shadow analysis, sizing, structure, electrical design), procurement (modules, inverters, structure, balance of system) and construction (installation, DISCOM net-metering and CEIG approvals, commissioning), usually followed by an O&M contract.

Why it matters on an MEPF project

A solar plant is bought once and judged for twenty-five years, and the decisions that decide the yield are made before a module is bought: the capacity basis (consumption and sanctioned load, not roof area), the structure on the roof, the module and inverter selection, and who files the net-metering application and when. EPC puts those in one contract with one accountable party.

The commercial trap is rupees per kilowatt. Two proposals at the same rate can differ on module wattage, structure type, approvals scope, monitoring and the performance guarantee — the guarantee that matters is a generation or performance-ratio figure with a remedy, not a brochure sentence.

How it's specified in practice

The EPC scope, stage by stage — Solar EPC
ParameterTypical / working positionGoverning reference
EngineeringShadow analysis, sizing to consumption and sanctioned load, structure, SLDIEC 61215/61730 modules; IEC 62109 inverters
ProcurementTier-1 modules (ALMM where required), inverters, structure, BOSMNRE ALMM
ConstructionInstallation, net-metering and CEIG, commissioning with DISCOM inspectionDISCOM connection standard; CEA
O&MCleaning, monitoring, servicing, performance-ratio reportingContract PR guarantee

Common mistakes

  • Sizing to the roof rather than to consumption; ignoring the sanctioned load cap.
  • Net-metering applied for after installation.
  • Old roof not assessed for the array load.
  • Buying on ₹/kWp alone without a measurable performance guarantee.

Related on this site

One of 68 working definitions in the MEPF & solar engineering glossary. The buying side of the same decisions is in the buyer's guides; the numbers are in the calculators.

Frequently asked

What does a solar EPC contract include?

Design and engineering, supply of modules, inverters, structure and balance of system, installation, the net-metering and (where applicable) CEIG approvals, and commissioning through the DISCOM inspection to the first net bill. O&M is usually a separate contract that follows.

How is a solar EPC proposal evaluated?

On the capacity basis, the yield assumptions, the module and inverter specification, the structure design, the approvals scope and the performance guarantee — before the price per kilowatt.

Standards referenced: IEC 61215 / 61730 · IEC 62109 · MNRE ALMM · CEA & DISCOM net-metering

Ready to start your project?

Get a free consultation and quote. We design, prepare and file your approvals, and execute — you deal with one team.

ONE PARTNER. END TO END. You focus on your business — we handle the rest.
Quality Safety Commitment
Send your bill An engineer reviews it