Skip to content
Secured Engineers Pvt. Ltd. logo
Home
Company Insights Resources About Founder — Er. Ankur Kaplesh
Services Mechanical / HVACElectricalPlumbingFire ProtectionLow Voltage / ELVSolar EPCDesign & ApprovalsAMC / MaintenanceTurnkey EPCFire NOC AssistanceCEIG Liaison & EnergisationTesting & CommissioningIndustrial Audits
Industries Manufacturing & IndustrialHealthcare & HospitalsHospitality & HotelsWarehousing & LogisticsGovernment & DefenceEducation & InstitutionsData CentrePharmaceutical & CleanroomCold StorageTextile & ApparelAutomobile & Auto-ComponentsFood Processing & FMCGChemical & Process Industries
Free Tools ★ Architect & Design Resource Hub All 29 calculators Solar Savings Calculator Fire Water Tank Calculator Fire Pump Room Calculator AC Tonnage Calculator DG Set Sizing Calculator MEPF Cost Estimator
Projects Work With Us Get a Free Quote
Electrical

Power Factor Correction

Power factor correction raises the ratio of useful power (kW) to apparent power (kVA) toward unity, usually by adding capacitor banks that supply the reactive power inductive loads consume — cutting billed demand and penalties.

Why it matters on an MEPF project

Motors, transformers and old lighting draw reactive power that does no work but occupies capacity: cables, transformers and the DISCOM connection all size on kVA. Since industrial billing is demand-based in kVA and tariff orders penalise poor PF (and often reward high PF), correction is one of the fastest-payback investments in a factory — commonly months, not years.

Modern plants complicate it: harmonic-rich loads (VFDs, rectifiers) interact badly with plain capacitors, so detuned filter banks are the default for drive-heavy facilities, and APFC panels switch capacitor steps automatically as load moves. Correction placed at major loads also unloads your own cables and transformer, not just the billing meter.

How it's specified in practice

Correction essentials — Power Factor Correction
ParameterTypical / working positionGoverning reference
Target PFNear unity — per your tariff order's incentive/penalty bandsstate tariff order
kVAr sizingFrom kW and existing→target PF (calculable)standard formula
APFCAutomatic step switching tracking loadIEC 61439-class panels
Harmonic-rich plantsDetuned/filter banks instead of plain capacitorspower-quality practice

Common mistakes

  • Fixed capacitors on a swinging load — over-correction at night, leading PF penalties.
  • Plain capacitors in a drive-heavy plant — resonance and blown cans.
  • Correcting only at the incomer and leaving internal distribution loaded.
  • Dead capacitor steps discovered only when the penalty reappears.

Related on this site

Frequently asked

How much kVAr do I need?

It is a formula from your load kW and the PF journey (measured → target). Our power-factor calculator gives the kVAr and the annual saving from your bill numbers.

Why did my PF drop after adding VFDs?

Displacement PF may be fine while distortion (harmonics) degrades true PF — meters and tariffs increasingly see the latter. Measurement first, then detuned filters, is the correct sequence.

Standards referenced: state tariff orders · IEC 61439 (panels)

Ready to start your project?

Get a free consultation and quote. We design, take all approvals, and execute — you stay stress-free.

ONE PARTNER. END TO END. You focus on your business — we handle the rest.
Quality Safety Commitment
Chat / Get Quote