Skip to content
Secured Engineers Pvt. Ltd. logo
Home
Company Insights Resources About Founder — Er. Ankur Kaplesh
Services Mechanical / HVACElectricalPlumbingFire ProtectionLow Voltage / ELVSolar EPCDesign & ApprovalsAMC / MaintenanceTurnkey EPCFire NOC AssistanceCEIG Liaison & EnergisationTesting & CommissioningIndustrial Audits
Industries Manufacturing & IndustrialHealthcare & HospitalsHospitality & HotelsWarehousing & LogisticsGovernment & DefenceEducation & InstitutionsData CentrePharmaceutical & CleanroomCold StorageTextile & ApparelAutomobile & Auto-ComponentsFood Processing & FMCGChemical & Process Industries
Free Tools ★ Architect & Design Resource Hub All 29 calculators Solar Savings Calculator Fire Water Tank Calculator Fire Pump Room Calculator AC Tonnage Calculator DG Set Sizing Calculator MEPF Cost Estimator
Projects Work With Us Get a Free Quote
Electrical

Sanctioned Load vs Connected Load

Sanctioned load is the capacity your DISCOM has approved for your connection; connected load is the sum of everything actually installed. Consuming beyond sanction invites penalties and regularisation — and the gap silently widens every time equipment is added.

Why it matters on an MEPF project

Factories grow one machine at a time; the sanction stays where the original application left it. The mismatch surfaces in DISCOM inspections, penal billing for exceeding sanction, and stalled processes (new connections, net metering, HT conversion) where declared and actual loads are compared. It also drives rooftop-solar caps in many states, where permissible plant size references your sanctioned load.

The fix is administrative, not electrical: a load-enhancement application with an honest connected-load schedule. The audit that precedes it — metering the real maximum demand versus the paper sanction — routinely finds the opposite problem too: sanction (and fixed charges) far above real demand, which is money returned by a reduction application.

How it's specified in practice

The two numbers — Sanctioned Load vs Connected Load
ParameterTypical / working positionGoverning reference
Sanctioned loadDISCOM-approved kW/kVA on your agreementDISCOM supply code
Connected loadSum of installed equipment ratingssite survey
Recorded MDWhat the meter actually peaks atmeter data
Solar linkageNet-metering caps often reference sanctioned loadstate net-metering regulations

Common mistakes

  • Adding loads for years without one enhancement application.
  • Declaring connected load from memory instead of a walked survey.
  • Paying fixed charges on a sanction double your real demand.
  • Discovering the mismatch inside a solar or HT application timeline.

Related on this site

Frequently asked

What happens if I exceed my sanctioned load?

Penal demand charges per your tariff order, possible notices, and friction in every future application. Regularise via enhancement — it is paperwork plus fees, cheaper than penalties.

Does sanctioned load limit my solar plant size?

In many states, yes — net-metering rules cap plant capacity relative to sanctioned/contracted load. Our solar-vs-sanctioned-load calculator shows where you stand before you apply.

Standards referenced: DISCOM supply codes · state net-metering regulations

Ready to start your project?

Get a free consultation and quote. We design, take all approvals, and execute — you stay stress-free.

ONE PARTNER. END TO END. You focus on your business — we handle the rest.
Quality Safety Commitment
Chat / Get Quote