Skip to content
Secured Engineers Pvt. Ltd. logo
Home
Company Insights Resources About Founder — Er. Ankur Kaplesh
Services Mechanical / HVACElectricalPlumbingFire ProtectionLow Voltage / ELVSolar EPCDesign & ApprovalsAMC / MaintenanceTurnkey EPCFire NOC AssistanceCEIG Liaison & EnergisationTesting & CommissioningIndustrial Audits
Industries Manufacturing & IndustrialHealthcare & HospitalsHospitality & HotelsWarehousing & LogisticsGovernment & DefenceEducation & InstitutionsData CentrePharmaceutical & CleanroomCold StorageTextile & ApparelAutomobile & Auto-ComponentsFood Processing & FMCGChemical & Process Industries
Free Tools ★ Architect & Design Resource Hub All 29 calculators Solar Savings Calculator Fire Water Tank Calculator Fire Pump Room Calculator AC Tonnage Calculator DG Set Sizing Calculator MEPF Cost Estimator
Projects Work With Us Get a Free Quote
Plumbing / PHE

Water Demand (NBC)

Water demand is the design daily water requirement of a building, computed from occupancy numbers and per-capita norms by use class per the NBC 2016 Part 9 / IS 1172 basis — the root number behind tank, pump, main and STP sizing.

Why it matters on an MEPF project

Everything hydraulic descends from this one calculation: raw and domestic tank volumes, transfer and hydro-pneumatic pump duties, municipal-connection sizing, and the sewage figure that sizes the STP. Get demand wrong and every downstream system inherits the error in concrete and pipework.

The craft is in honest occupancy and use classification — factory workers vs office staff vs residential occupants carry different norms; visitors, canteens and process water ride on top; and phased occupancy argues for staged tankage. Storage split (underground raw vs overhead domestic vs the fire reserve, which is separate and sacrosanct) then turns litres into structures the plan-sanction authority checks.

How it's specified in practice

From heads to litres — Water Demand (NBC)
ParameterTypical / working positionGoverning reference
Norm basisLitres/person/day by occupancy classNBC 2016 Part 9 / IS 1172
Add-onsCanteen, process, visitors, landscapingdesign additions
Storage splitUG raw + OH domestic (+ separate fire reserve)NBC practice
DownstreamSewage fraction → STP; peaks → pump dutiesdesign chain

Common mistakes

  • One blended norm for a mixed-use building.
  • Fire reserve conflated with domestic storage.
  • Process water guessed rather than metered/specified.
  • No diversity between total demand and instantaneous pumping duty.

Related on this site

Frequently asked

How much water does my building need per day?

Occupancy × class-wise norms + special uses. Our water-demand calculator computes demand and the UG/OH tank split per standard practice; the approved PHE drawings freeze it.

Do norms differ for factories vs offices?

Yes — the per-capita basis differs by use class, and factories often add process and canteen loads that dwarf the human norm. Classify honestly before calculating.

Standards referenced: NBC 2016 Part 9 · IS 1172

Ready to start your project?

Get a free consultation and quote. We design, take all approvals, and execute — you stay stress-free.

ONE PARTNER. END TO END. You focus on your business — we handle the rest.
Quality Safety Commitment
Chat / Get Quote