Rainwater Yield and Storage Scenario Calculator
How much water a roof yields is one question; how much of it a tank actually delivers is another. Enter your catchment, twelve months of local rainfall, the demand the water will serve and a tank size — the tool runs the year month by month.
What this tool estimates
The rainwater your catchment yields in each month and over the year from the rainfall you enter, and — separately — how much of it a tank of the size you choose would deliver against your monthly demand, with the overflow and the water carried forward each month.
What it cannot decide
- Whether recharge is feasible or allowed on your site — that needs local hydrogeology (water-table depth, soil and aquifer), water-quality checks and the authority's permission.
- What rain to expect: the result is only as good as the twelve monthly figures you enter from a local record.
- Storm-by-storm behaviour: a monthly balance flatters a small tank, because short heavy storms can overflow it before the water is used.
- The design of gutters, downpipes, first-flush diversion, filters or the tank, or whether the water is fit for its intended use.
- Whether your building bye-laws or groundwater conditions require a particular storage or recharge volume.
Result
| Month | Rain mm | Captured | Demand | Used | Overflow | In tank at end | Short |
|---|
| Step | Value |
|---|
| Tank | Used | Demand met | Used, 25% less rain | Used, cautious | Overflow |
|---|
Cautious balance: water is used only from what was in the tank at the start of each month, and that month's rain fills it for later. What real storms deliver lies between the two balances; a daily simulation on local records decides where.
Method version 6 October 2026. A screening estimate, not a design: see the limits below.
How this calculator works — and where it stops
What it calculates
Two separate things. First, the gross yield of a catchment: the rainwater it sheds in each month and over the year from the rainfall you enter. Second, a twelve-month storage scenario: how much of that water a tank of the size you choose actually delivers against your monthly demand, how much overflows, how much demand goes unmet and what is left in the tank — month by month.
Inputs
- Catchment area in m² or ft², measured on plan (the horizontal projection), counting only the surfaces that drain to this tank.
- Twelve monthly rainfall totals in mm from a local record — IMD's district rainfall statistics, a nearby station or your own gauge. Zero is a valid month; a blank month is missing. An annual total alone is not accepted, because it cannot size a tank.
- Runoff coefficient (more than 0, at most 1) for the surface, which you justify. CGWB's Manual on Artificial Recharge of Ground Water (2007) tabulates GI sheet 0.9, asbestos 0.8, tiled 0.75 and concrete 0.7; its January 2025 guide uses 0.8 for roofs and says asbestos roofs are not suitable for harvesting.
- Capture factor (more than 0, at most 1) for first-flush diversion, gutter overshoot in heavy rain and filter losses.
- Monthly demand on the harvested water — m³ in the month, or KLD multiplied by the days in that month (non-leap year).
- Tank capacity (usable volume) in m³ or litres, the water in it when the run starts, and the month the run starts in.
- Optional: what a kL of the water it replaces costs you, to put a gross value on the water used.
Method
- Capture in each month (m³) = area (m²) × rainfall (mm) ÷ 1000 × runoff coefficient × capture factor. 1 mm of rain on 1 m² of plan area is exactly 1 litre.
- Gross annual capture = the sum of the twelve months. It is reported on its own: it is the catchment's yield, not a tank size.
- The twelve months then run through the tank in order from the start month. Each month: available = storage at the start + capture; used = the smaller of the demand and the available water; overflow = whatever is left above the tank's capacity after use; the rest is carried into the next month.
- Over the year, gross capture + starting storage = used + overflow + water left at the end. The tool shows this check with every result.
- A cautious second run uses only the water already in the tank at the start of each month and lets that month's capture spill first, to bracket what short, heavy storms do to a monthly balance.
- Sensitivity: the same year is rerun for tanks of ½, 1½ and 2 times the size entered (each starting as full, proportionally), for a year with 25% less rain in every month, and with the cautious rule.
Assumptions
- Monthly steps: rain and use within a month are netted before the tank's capacity applies. That flatters small tanks, which in reality overflow in a storm and run dry in the gap before the next; the cautious run shows how far the answer can fall.
- The runoff coefficient and capture factor apply to every month alike; the first storms after a dry spell lose more to wetting the roof and to first flush.
- Overflow is reported as water leaving the tank — to a recharge structure or a drain. Whether it can be recharged is not assessed.
- The rainfall entered is the year being planned for. A drier year delivers less; the sensitivity table shows one with 25% less rain.
Limitations
- Does not assess recharge. Water-table depth, soil and aquifer, contamination risk and permission are site- and authority-specific: CGWB's 2025 guide does not recommend recharge structures where the post-monsoon water level is shallower than 3 m below ground, and on sites with industrial, chemical or hazardous waste it limits recharge to surface spreading.
- Does not size gutters, downpipes, first-flush devices, filters or overflow pipes — those follow storm intensity, not monthly totals.
- Says nothing about water quality or fitness for any use; treatment follows the use and test results.
- Does not check what your building bye-laws or groundwater conditions require — they set their own volumes and wording.
Worked example
Produced by running this calculator with the inputs below.
Inputs
- Catchment 1,000 m² on plan
- Rainfall, January to December: 10, 10, 10, 5, 15, 60, 150, 140, 70, 15, 5 and 10 mm — 500 mm in an illustrative monsoon-shaped year, not any city's normals
- Runoff coefficient 0.8; capture factor 0.9
- Demand 30 m³ every month (360 m³ a year)
- Tank 100 m³, empty when the run starts in June
Working
- Gross annual capture = 1,000 × 500 ÷ 1000 × 0.8 × 0.9 = 360 m³ — exactly the year's demand.
- June to January: capture plus carry-forward meets the 30 m³ demand every month. The tank fills in August, when 62 m³ overflows, and 20.4 m³ more overflows in September.
- December ends with 31.6 m³ in the tank; with January's 7.2 m³ of capture that meets January's demand and leaves 8.8 m³.
- February to May fall short: 16, 7.2, 3.6 and 10.8 m³ are used against 30 m³ a month — 82.4 m³ unmet.
- Check: 277.6 used + 82.4 overflow + 0 left = 360 captured + 0 at the start.
Result. The roof yields 360 m³ — the whole year's demand — yet the 100 m³ tank delivers 277.6 m³ (77.1% of demand): 82.4 m³ spills in August and September and the same amount is missing from February to May. The cautious balance gives 206.8 m³. Timing, not the annual total, decides what a tank delivers.
Sensitivity — what moves the answer
- Tank size: in the worked example 50 m³ of tank delivers 227.6 m³, 100 m³ delivers 277.6 m³, 150 m³ delivers 327.6 m³ and 200 m³ meets the whole 360 m³ — each extra 50 m³ of tank buys up to 50 m³ of use until nothing spills.
- A drier year: with 25% less rain in every month the 100 m³ tank delivers 263.2 m³, and no tank can deliver more than the 270 m³ captured.
- Where the run starts: the same year started in January with an empty tank delivers 246 m³, because January-to-May demand comes before any monsoon water is stored. Start where you know the tank's level.
- The runoff coefficient and capture factor scale the yield directly: each 0.05 off the runoff coefficient removes 22.5 m³ of capture in the example.
How engineers use the result
To test the storage question before a design: how much of the roof's yield a given tank turns into useful water against a real demand pattern, how much would overflow to recharge, and whether a bigger tank buys anything. It also shows when no reasonable tank can meet a demand, so the water balance needs another source.
When a professional design must replace it
Before committing to a tank size or a recharge scheme: an engineer should replace the monthly balance with a daily one on local rainfall records, size the collection and first flush for storm intensity, confirm the demand pattern from the site's water balance, and check recharge feasibility, water quality and the authority's conditions.
Sources
- Central Ground Water Board — Manual on Artificial Recharge of Ground Water (2007), chapter 7, Table 7.2 — water available = rainfall × roof area × runoff coefficient; roof area measured on plan; runoff coefficients of common roofs
- Central Ground Water Board — Simple and Practical Methods of Artificial Recharge for Groundwater Augmentation (January 2025) — rooftop formula with 0.8 for roofs; first flush; asbestos roofs unsuitable; recharge not recommended where the post-monsoon water level is shallower than 3 m; surface spreading only near industrial, chemical or hazardous waste
- India Meteorological Department — rainfall information (district, state and sub-division statistics) — where to find local monthly rainfall; this tool holds no rainfall data
- BIS — Guide for using National Building Code of India 2016 — context only: lists rainwater harvesting under Part 11, Approach to Sustainability. No clause is applied by this tool
Questions people ask before using it
What rainfall and site data do I need before using the rainwater calculator?
Twelve monthly rainfall totals for your location in mm, from a local record (IMD's district rainfall statistics, a nearby station or your own gauge); the catchment area measured on plan; a runoff coefficient for the surface that you can justify (CGWB's 2007 manual tabulates GI sheet 0.9, tiled 0.75 and concrete 0.7, and its 2025 guide uses 0.8 for roofs); a capture factor for first-flush diversion, gutter overshoot and filter losses; the demand the harvested water will serve in each month; and the tank size you want to test, with the storage it starts from.
Which site conditions could change the rainwater result?
A dry year (the yield falls in proportion to the rain), short heavy storms that overshoot gutters or overflow a small tank before the water is used, the roof material and its condition, dust and industrial fallout that call for a larger first flush, and demand that changes with the season. For recharge, the water table and soil decide: CGWB's 2025 guide does not recommend recharge structures where the post-monsoon water level is shallower than 3 m, and on sites with industrial, chemical or hazardous waste it limits recharge to surface spreading.
What should I send an engineer for a rainwater harvesting review?
The roof and paved-area plan with areas and surface materials, the site's water balance — which uses the harvested water would serve, month by month, with occupancy or shift patterns — the rainfall record you used, any groundwater permission and its conditions, a site plan showing drains, effluent and septic lines and foundations near likely recharge points, any water or wastewater test results, and this calculator's monthly table.
Optional: ask an engineer to look at it
The result above is yours with no form. If you want an engineer to check it against your drawings, schedules or bills, send a request. Nothing is sent until you press the button.
Request saved
It reached our team with exactly what the preview showed. An engineer will use the number you gave if they need your drawings or data.
Prefer to talk? WhatsApp or the contact form.
Got your number — what next?
A calculator gives you a first figure. These take it further.
The work itself
Read before you specify
The terms behind it
Delivered work with this scope
- Full MEPF Package for JMH Prime, Jeewan Mala Hospital — Karol Bagh, New Delhi — Jeewan Mala Hospital
- MEPF for Advantec Wheels Alloy Plant, Jammu — Advantec Wheels
Related calculators
One of 56 free MEPF and solar calculators on this site. Every input term is defined in the engineering glossary; the specification libraries, clearance guides and checklists for design teams are in the architects' section.
Guides that reference this page
- Sizing and Costing Rainwater Harvesting for a Factory
- Solar Module Cleaning for a 1 MW Plant: Water, Frequency, Robots and the Soiling Loss Maths
- Factory Expansion Water Demand: Domestic, Process, Peaks and Storage
- Rainwater Harvesting for Factories and Commercial Sites
- The Borewell You Drilled in 2009 Now Needs a Licence. And a Meter. And a Fee.
- The Site Is Insured. The Chiller That Failed on Test Is Probably Not.
Related on this site
- termDLP (Defect Liability Period)
- termString Inverter vs Central Inverter
- termOpen Access (Solar)
- serviceNet-Metering, Metering & Monitoring (Solar EPC)
- serviceSoil, Waste & Rainwater Drainage (Plumbing)
- calculatorProject Delay Cost Calculator
- calculatorMEPF Cost Calculator
- buyer's guideHow to Select an MEP Contractor
- guidePESO licence for diesel storage
- guideFactory licence and DISH approval