Skip to content
Secured Engineers Pvt. Ltd. logo
Home
Company Insights Resources Locations & project coverage About Founder — Er. Ankur Kaplesh
Services Mechanical / HVACElectricalPlumbingFire ProtectionLow Voltage / ELVSolar EPCMEP Consultancy & ApprovalsAMC / MaintenanceTurnkey EPCFire NOC AssistanceCEIG Liaison & EnergisationTesting & Commissioning AI Video Analytics
Industries Manufacturing & IndustrialHealthcare & HospitalsHospitality & HotelsWarehousing & LogisticsGovernment & DefenceEducation & InstitutionsData CentrePharmaceutical & CleanroomCold StorageTextile & ApparelAutomobile & Auto-ComponentsFood Processing & FMCGChemical & Process Industries
Free Tools ★ Architect & Design Resource Hub All 56 calculators Solar Financial Calculator Fire Water Storage Checker Fire Pump Room Calculator AC Tonnage Calculator DG Load Calculator MEPF Budget Calculator
Projects Work With Us Get a Free Quote
Solar Energy

Insuring a Rooftop Solar Plant: Policies, Exclusions and What the Insurer Asks For

22 October 2026 · 6 min read · by

Title card reading 'Insuring a Rooftop Solar Plant: Policies, Exclusions and What the Insurer Asks For' over an illustration of a factory roof with solar panels.
Title card. Not a photograph of a Secured Engineers site.

A factory's rooftop solar plant is usually insured in layers: an erection or construction policy while it is built, the factory's property policy once it runs, and separate cover for inverter breakdown and lost generation. The standard fire policy covers fire and lightning but excludes electrical damage to the apparatus itself, so surge and inverter losses need their own cover.

Which policy covers the plant at each stage?

No single policy follows a solar plant from site delivery to year twenty. The cover changes as the risk changes, and the gaps sit at the joins. The table sets out the layers an owner normally assembles. Product names vary by insurer, so treat it as a checklist to take to your broker, not as a statement of what any insurer will issue.

StageCover typically usedWho usually arranges itWhat to check
Supply, erection and commissioningContractor's all-risk or erection all-riskThe EPC contractor, often with the owner as a named insuredWhether testing and commissioning is covered, and the date cover ends
Operating plantThe factory's fire and allied perils policy, with the plant declared as insured propertyThe ownerPlant included in the sum insured at replacement value, and named in the policy schedule
Inverter, transformer and monitoring failureMachinery breakdown or electronic equipment cover, written separatelyThe ownerWhether surge and short-circuit damage is included
Lost generation or productionBusiness interruption or consequential loss coverThe ownerWaiting period, indemnity period, and whether lost savings on a net-metered plant count
Injury or damage to othersCommercial general or public liabilityThe owner, sometimes the EPC during worksRoof access, falling objects, contractor's staff on site

Our note on gaps in erection all-risk cover covers the first row in more detail. The handover date matters most for solar: if the construction policy ends at practical completion and the owner's property policy has not yet picked up the plant, an installed and energised array sits uninsured.

What does the standard fire policy say about solar panels?

For most factories the second row of the table is the one that decides a claim. Since 1 April 2021 insurers have had to offer standard products for fire and allied perils, under IRDAI guidelines. Bharat Sookshma Udyam Suraksha applies where the total value at risk at one location does not exceed ₹5 crore across buildings, plant, stock and contents. Bharat Laghu Udyam Suraksha applies above ₹5 crore and up to ₹50 crore. The guidelines define nothing beyond that, so ask how your insurer covers a larger location.

The IRDAI template for the smaller product is useful because it names the equipment. It lists "solar panels" among the additional structures on the premises that the cover extends to, provided they are shown in the policy schedule. Two consequences follow.

  • Declare the plant. A plant that is not in the schedule is an argument waiting to happen. The guidelines also say buildings and machinery are insured on reinstatement or replacement value only, not market value, so the sum insured should reflect what a new plant would cost, not its depreciated book value.
  • Mind underinsurance. If the replacement value of the insured property is more than the sum insured, the claim is reduced in proportion. The template waives underinsurance up to 15 percent for the smaller product. Beyond that, the reduction applies. Adding a plant mid-year without telling the insurer is a common way to land in that zone.

The guidelines also do not allow a standard policy that covers only part of a building or only specified machinery. In practice that means the plant is added to the location's cover rather than insured alone under that wording. If an insurer offers a separate solar policy on its own wording, read it against these terms rather than assuming it is wider.

Which losses does the fire policy not pay?

The insured events in the template include fire, lightning, explosion, storm, cyclone, flood, landslide and impact damage. That sounds broad. The exclusions are where solar claims turn.

  • The inverter hit by a surge. The template excludes damage to an electrical or electronic machine caused by over-running, excessive pressure, short-circuiting, arcing, self-heating or leakage of electricity, "lightning included". The exclusion applies to the particular machine. Ensuing damage to other insured property from an insured peril is still covered. So a surge that destroys an inverter is the owner's loss, but the fire that surge starts in the electrical room is not. This is why earthing and lightning protection belong in the insurance conversation, not only the design one.
  • Hail. The storm peril in the template names cyclone, typhoon, tempest, hurricane, tornado, tsunami, flood and inundation. Hail is not in that list. Ask your insurer in writing how it treats hail damage to modules.
  • Theft. The template covers theft only within seven days of an insured peril. Theft of modules or cable from an unattended roof needs a separate extension or policy.
  • Unoccupied premises. Cover is restricted if the premises remain continuously unoccupied for more than 30 days without the insurer's written approval. A seasonal unit that shuts for months should raise this before it happens.
  • Lost generation. Business interruption is not part of the standard fire products. It is bought separately, and so is any cover for lost savings when a roof plant is down.

What will the insurer ask for?

Insurers differ and each has its own proposal form, so ask for it early. The documents below are what a survey of a grid-connected factory plant typically turns on, and they are the same papers a good project file holds anyway.

DocumentWhy it is asked
Electrical Inspector approval or the self-certification record, where the state requires itShows the installation was inspected before energisation under the CEA safety regulations
DISCOM net-metering approval and commissioning reportShows protection settings and synchronisation were accepted
Single-line diagram, array layout and string planLets the surveyor see fire separation and isolation points
Roof load and structural stability assessmentA roof collapse or wind damage claim starts with the mounting design
Module and inverter test certificates, warranty termsEstablishes what is new, what is certified and what the manufacturer already backs
Earthing and lightning-protection design and test valuesSurge and fire risk are the plant's main insurable hazards
Fire NOC or fire-safety status of the building, and the O&M contractShows the building and the plant are maintained

For the first row, see our guide to Electrical Inspector approval for factories. Whether a given plant falls on the inspected side or the self-certified side depends on the voltage your state has notified, so confirm it for your connection.

Where does insurance sit in the EPC contract?

Write it into the contract rather than leaving it to the schedule of payments. The clauses worth fixing are: who insures the works until take-over, and in whose names; who bears the deductible; the exact date risk passes to the owner; and who pays for any extension of cover if commissioning slips. Ask for copies of the certificates, not a letter saying cover exists.

Insurance is also not a substitute for warranties or guarantees. Insurance answers a sudden event such as fire or storm. A module's power warranty and the EPC's performance guarantee answer slow loss and defects. Our checklist on what to check in a solar EPC performance guarantee covers that side, and a maintenance contract under AMC is what keeps the claims file clean afterwards.

How Secured Engineers helps

  • We design the plant in-house, including the earthing, lightning and surge-protection scheme that insurers look at first.
  • Fire NOC, CEIG and DISCOM net-metering filings are prepared in-house, so the approval papers an insurer asks for come from one file.
  • MEPF and solar can sit under one contract, which keeps the electrical room, fire detection and plant in one scope.
  • We work from offices in Noida (Delhi NCR) and Ludhiana, with 535+ projects across 18+ states and 89.77% repeat clients.
  • We do not sell insurance and do not advise on policy terms. We give your broker the drawings, test records and approvals the underwriter will ask for.

If you are planning a plant and want the project file to be insurable from day one, start with our solar EPC service, then message us on WhatsApp, call +91 70099 85817 or ask for a free proposal with a site-specific scope and price.

Frequently asked

Does a factory's fire policy automatically cover rooftop solar panels?

Not automatically. The IRDAI template for the smaller standard product extends cover to solar panels only where they are shown in the policy schedule, and it insures on replacement value. So the plant should be declared, with a sum insured that reflects its cost new. Tell the insurer when you add a plant mid-year, and ask for the endorsement in writing.

Is insurance of a rooftop solar plant mandatory?

We have not found a central rule that makes insurance of a captive rooftop plant compulsory. In practice a lender's sanction letter or the EPC contract often requires it, and any contractor on site should carry its own cover. Check your loan terms and your contract, and confirm with your insurer whether the plant sits within your existing property policy.

Will an inverter damaged by a lightning surge be paid under the fire policy?

Usually not. The IRDAI template excludes damage to an electrical machine caused by short-circuiting, arcing or leakage of electricity, lightning included, though the exclusion applies only to the machine itself. Fire damage to other insured property that follows is covered. Inverter and surge losses are normally insured through separate machinery breakdown or electronic equipment cover.

Who should insure the plant during construction?

The contract should say. Usually the EPC contractor arranges contractor's all-risk or erection all-risk cover for the works, with the owner named as an insured. Agree who bears the deductible, the date risk passes to the owner, and who pays if commissioning is extended. Ask for the certificate itself, and make sure the owner's property policy starts before the contractor's ends.

Does insurance replace the module and performance warranties?

No. Insurance responds to sudden events such as fire, storm or impact. Product and power warranties, and the EPC's performance guarantee, respond to defects and gradual loss of output. A claim for a failed module is usually a warranty matter, while a claim for a roof fire is an insurance matter. Keep the warranty documents and the policy together in the project file.

Related services

Send last month's electricity bill with your enquiry — sanctioned load, tariff and consumption are all on it, and they decide the answer.

Want to know what solar would actually do on your roof?

Tell us about your project — our engineers respond within one business day.

  • ★ 4.7 (230 Google reviews)
  • 535+ projects
  • Reply in 1 business day
Add details (optional — company, email, scope and site address)

🔒 Your details go straight to our team. No spam, ever.

Ready to start your project?

Get a free consultation and quote. We design, prepare and file your approvals, and execute — you deal with one team.

ONE PARTNER. END TO END. You focus on your business — we handle the rest.
Quality Safety Commitment
Send your bill An engineer reviews it