Skip to content
Secured Engineers Pvt. Ltd. logo
Industrial Solar EPC

Industrial rooftop solar, engineered like the rest of your plant

For factories and industrial plants putting solar on their own roof: a grid-connected rooftop plant planned around your factory's power system — your loads and shifts, sanctioned load, transformer, DG sets and protection scheme — then installed, tested and handed over with the DISCOM application prepared.

₹28,000 per kW, excluding GST — rooftop, turnkey, per kW of DC capacity, typical for plants of a few hundred kW (₹24,000–32,000/kW from 100 kW to 1 MW). See exactly what it includes ↓

Or WhatsApp an engineer · Run the numbers yourself first

15+ years · 535+ projects (company-wide, MEPF & solar) · HT electrical, fire & solar under one contract

Plan solar and electrical as one scope · Check the published solar project records

Why industrial is different

A panel installer sees your roof. We see your single-line diagram.

Industrial solar fails differently from commercial solar. The modules rarely disappoint — the integration does: inverters tripping on DG changeover, power factor incentives lost after commissioning, strings clipped by a harmonics-rich LT network, sanctioned-load mismatches stalling the DISCOM application. We publish an entire guide on why industrial solar underperforms because we keep being called to fix plants built by installers who had never engineered a factory's electrical system.

Our solar team is the same engineering organisation that builds HT/LT infrastructure, DG synchronisation and fire systems for industrial plants across 18+ states. Solar plugs into that discipline.

Engineered in scope

What the EPC actually covers

Where you are starting from

Three ways to start an industrial solar proposal

An operating factory

Send one recent electricity bill — all pages — and your sanctioned load or contract demand. Twelve months is better if you have them.

The bill establishes consumption and connection details. Share your shifts, weekly shutdowns and any daytime load readings too: a monthly bill alone cannot show how much solar you will use as it is generated. How that works.

A factory still being built

No bill yet is normal. Send the planned connected load or applied contract demand, the roof or shed area and type, and the shifts you expect to run.

Designing solar into the electrical scheme now — space in the LT panel, the roof structure, the metering — costs less than retrofitting it later.

You already hold a quotation

Send the BOQ or the proposal you have. We compare it line by line on the same scope — capacity basis, makes, structure, cable scope, grid interface, testing and exclusions — and tell you what is missing.

Compare my solar BOQ or quotation · the checklist we use

Factory solar + electrical

One project brief. Clear responsibility at every connection.

A solar price leaves questions unanswered if the roof, electrical upgrades or factory shutdown sit outside it. Start with the decision your plant needs to make.

Add solar to an operating factory

You need to know where solar connects, what must change in the electrical system and which shutdowns are needed.

Bring what you have

Electricity bills, working shifts, available daytime load readings, existing SLD, transformer and DG details, roof information.

Review outputs to agree

Sizing assumptions, connection and protection questions, electrical modifications to price, and checks still needed on site.

Discuss this scope: Add solar to an operating factory

Expand or upgrade factory power

You are adding machines, changing the supply or replacing electrical infrastructure. Solar can be considered separately.

Bring what you have

Existing SLD, new machine/load list, sanctioned load or contract demand, transformer and panel details, target date and shutdown window.

Review outputs to agree

Load and distribution constraints, equipment and cable scope, proposed work sequence, and testing and energisation responsibilities.

Discuss this scope: Expand or upgrade factory power

Procure solar and electrical together

A new factory or major extension needs one coordinated scope across solar, HT/LT distribution and the existing or planned supply.

Bring what you have

Layout, load schedule, available drawings or BOQ, solar requirement, construction programme and package boundaries.

Review outputs to agree

An interface register and scope split for solar, electrical and client works, with exclusions and acceptance documents identified.

Discuss this scope: Procure solar and electrical together

The first enquiry helps define the assignment. Before an engineering review or site visit starts, agree its inputs, deliverables, fee, timing and exclusions. Final design, execution and authority decisions are separate steps.

Five responsibilities to settle before comparing EPC prices
Roof and structure
Who checks the roof, prices strengthening and closes waterproofing responsibility?
Electrical connection
Who supplies the panel modifications, cables, metering and transformer or bay work?
DG and protection
Who designs, sets and tests the operating modes, interlocks and protection?
Production shutdown
Who agrees isolation, the outage window, temporary supply and the restart sequence?
Approvals and handover
Who prepares submissions, pays applicable fees, attends tests and supplies the final records?

Record each item as included, excluded or by client, with a named owner and an acceptance document. Apply the same questions to every bidder, including us.

Take the brief to your project team

Two pages covering site inputs, package boundaries, comparable prices and evidence to request. No sign-up needed.

Already have competing solar quotations? Use the proposal evaluation guide. Need electrical scope detail? Explore HT/LT electrical works.

Download the detailed industrial solar review checklist (TXT) for sizing, self-consumption and quotation assumptions.

Price and scope

What our ₹28,000/kW price includes — and what changes your quotation

₹28,000 per kW, excluding GST — per kW of installed DC capacity (module nameplate), for a grid-connected commercial or industrial rooftop plant, turnkey within the scope below. It is our reference rate for plants of a few hundred kW; across 100 kW to 1 MW our band runs ₹24,000–32,000 per kW, lower as plants get larger. That is ₹28 per watt installed — not the price of a module alone, which is quoted per watt and covers only the panel.

Included

  • Solar modules
  • Inverters
  • Mounting structure — type and gauge set by the roof — RCC, metal shed or PEB
  • DC and AC cabling — cable runs beyond a normal layout move the price within the band
  • Earthing and lightning protection
  • Protection and metering
  • Installation, testing and commissioning
  • DISCOM liaison and net-metering application

Not included

  • HT-side works — transformer or bay addition — where the site needs one
  • Roof strengthening or civil works
  • Battery storage
  • Land, for a ground-mounted alternative
  • Statutory fees

Stated in your quotation

These are set per project, so we write them into each quotation rather than assume them here:

  • HT metering
  • Engineering design and drawings
  • Freight to site
  • Remote monitoring
  • O&M after handover
  • Warranty terms (modules, inverters, workmanship)

The quotation also states how long its price holds.

What moves a quotation within, or away from, this price

  • Roof and structure — RCC, metal shed or PEB, the structure height and gauge, and walkways.
  • Electrical interface — an LT connection versus HT-side works, protection and metering upgrades.
  • Cable runs — a plant spread across several sheds needs more DC and AC cable than one roof.
  • Makes you specify — named module or inverter makes, or a consultant's approved list.
  • Plant size — larger plants carry a lower per-kW cost; small systems a higher one.

Illustrative arithmetic, not a quotation: 250 kW × ₹28,000 = ₹70 lakh, plus GST. Your project's figure comes from a site review of the roof, the connection and the scope above. Price confirmed by the director on 2 October 2026; next review by December 2026.

Beyond the roof

When rooftop alone isn't the answer

Open access solar

When demand outgrows the roof, off-site solar over open access can beat rooftop economics in some states. The honest comparison.

Battery energy storage (BESS)

Peak shaving and demand-charge management with BESS — when the arithmetic works, and when it doesn't yet.

DG vs grid vs solar

Per-unit cost of every source your plant runs on — the numbers that justify the project internally.

The full scope — design, approvals, procurement, installation and commissioning — is on the solar EPC service page, and the business case across building types on solar for business. Sizing questions? Start with solar for factories or jump straight to the 250 kW solar plant cost, 500 kW solar plant cost and 1 MW solar plant cost breakdowns.

Delivered work

Where we have carried solar on a live plant

These published project records include solar in their recorded scope. Check each record for the installation type, capacity where stated and the work included. Our company-wide project count is not a count of solar installations.

Capacities are shown where the project record states them; commissioning records are not published on these pages. Ask for them with the feasibility request below and we will send what the project file holds.

In execution, not yet delivered: Turnkey MEPF & Solar for Consern Pharma — Ludhiana; 6 MW Solar Plant under PM-KUSUM Component C — Bikaner, Rajasthan.

Straight answers

Industrial solar questions, answered by engineers

What do you need for an industrial solar feasibility review?

Start with your site location, a recent electricity bill, sanctioned load or contract demand, working shifts and weekly shutdowns, and the roof area and type. Twelve months of bills and daytime load readings improve the assessment. A bill alone cannot establish how much solar you will consume while it is generated. If you already have a proposal, include its capacity basis, scope and exclusions. Final sizing needs the site, structure and connection checks.

How is industrial solar different from commercial rooftop solar?

Scale and integration. An industrial plant is usually HT-connected with a dedicated transformer, runs large motor loads with VFDs, and often has DG backup that must never back-feed the solar plant. Industrial solar is an electrical-integration project first and a panel installation second — protection coordination, synchronisation logic and power quality decide whether the plant performs, not module wattage.

Can solar run alongside our DG sets?

Yes, but only with deliberate engineering. Solar inverters must derate or trip when the plant islands onto DG power, or the DG can be damaged and the inverters will hunt. We design the changeover logic, reverse-power protection and minimum-DG-loading controls as part of the EPC scope — the same discipline covered in our factory microgrid guide.

Does solar affect our power factor or harmonics?

It can. Solar inverters displace active power drawn from the grid, which changes the reactive share your APFC panel sees, and inverter switching adds harmonic content that matters on plants already running many VFDs. We measure PF and harmonics as part of design so your electricity bill's PF incentive doesn't quietly disappear after commissioning.

What approvals does an industrial solar plant need?

Net-metering or captive registration with your DISCOM, synchronisation permission and — where the connection voltage brings the installation under the Electrical Inspector (in Punjab, every new installation above 650 V) — CEIG approval. We prepare and file all three ourselves and follow them up — the same CEIG and DISCOM filings we make for complete factories as an MEPF contractor and consultant, not a subcontracted liaison job. The DISCOM and the inspectorate decide.

Rooftop captive or open access — which suits an industrial consumer?

Rooftop captive suits most plants up to a few MW of demand: no wheeling charges, generation consumed where it's produced. Open access starts making sense for very large consumers in states with favourable banking and cross-subsidy rules. We model both on your actual bills before recommending either — the comparison is in our open-access vs rooftop guide.

Request an industrial solar feasibility review

Tell us your site location, working shifts, roof type and sanctioned load if known. Mention any existing quotation and the decision you need to make. Start with the details you have; use the WhatsApp option to share your bill or drawings.

Add project details (optional — company, type, stage, timeline, size)

Tells us which channels bring real projects. “I don’t remember” is a fine answer.

Free · 30 seconds

What would solar actually save you?

Three inputs. Your numbers appear before we ask for anything.

  1. 1 Your site
  2. 2 Your numbers
  3. 3 Assessment
Roof type
CAPEX, bank loan or OPEX

Three ways to pay for it — and the one that suits you is a finance question, not a solar one

The engineering is identical in all three. What changes is who puts up the capital, who owns the asset, who carries the O&M, and who keeps the savings.

CAPEX

You own the plant

You fund it, you own the asset, and every rupee it saves stays with you.

Depreciation
Accelerated depreciation at 40% WDV in year one. On a typical corporate tax rate that is roughly 10–12% of project cost back as a year-one tax saving — confirm your own position with your CA.
Savings
You keep 100% of the generation. Nothing is shared with a developer.
Payback
Typically 3–6 years for C&I rooftop at a healthy tariff. Yours depends on your blended tariff, region and roof — the calculator gives your number, not an average.
Asset
A 25-year asset on your balance sheet, with the loan (if any) usually clear inside 5–7.

Trade-off: You fund the capital and carry the O&M.

Compare on lifetime rupees
BANK-FINANCED OWNERSHIP

You own it, a bank funds most of it

A lender funds the bulk of the plant against a contribution from you. You still own the asset at the end.

Your contribution
Not zero — this is the number most often misstated. The published captive schemes we checked want 20–25% of project cost: SBI Surya Shakti sets 20% minimum for captive projects and states deviation is not permitted; Indian Bank IND-SURYA SHAKTI asks 25% on equipment and erection. Read 27 Sep 2026 — re-check before you budget on it.
Security
Expect the financed assets hypothecated, plus a lien or mortgage over the land and building the plant stands on. Personal guarantees from directors are common.
Tenure
Commonly 10–15 years door-to-door including any moratorium, which is what lets the EMI sit below the monthly saving on a healthy tariff. Whether it actually does is arithmetic, not a promise — the EMI calculator uses your numbers.
Who decides
The lender, not us. SEPL prepares the technical pack it asks for — system design, BOQ, generation estimate and commissioning evidence. We do not assess your credit, submit applications on your behalf, or promise a sanction.

Trade-off: You take on a repayment obligation and the O&M, and the lender takes security over the building.

Test it against your own EMI
OPEX / RESCO / PPA

You buy the output

An investor or developer builds and owns the plant on your roof, and you buy the units it makes. This is how the model works in the market — whether a given project qualifies is a question for assessment, not a standing SEPL offer.

Capital
No upfront plant CAPEX from you, and the plant stays off your balance sheet. That is not the same as free — you take on a PPA with a tariff, a term, and usually a minimum-consumption or deemed-generation obligation.
Tariff
A per-unit rate agreed in the contract, normally below your current DISCOM tariff. Check the escalation clause — it decides the deal.
Risk
Performance and O&M sit with the developer for the contract term.
End of term
Read the transfer clause carefully. Some contracts hand you the asset; others do not.

Trade-off: Smaller saving, usually more total cost than owning across 25 years, and you give a third party rights over your roof for the term.

Model a PPA offer you've been sent

Solar PPA, RESCO or bank loan — which suits your factory?

Request a project-specific review of bank-financed ownership and investor-funded alternatives. Availability, borrower contribution and terms depend on project assessment and the lender or investor.

Request a solar finance assessment

Published borrower contribution on the captive solar schemes we checked (2026-09-27): State Bank of India Surya Shakti Solar Finance — 20% minimum for captive projects, with deviation not permitted; 25% minimum for other-than-captive; Indian Bank IND-SURYA SHAKTI — 25% on the cost of the equipment and erection charges. SEPL is an EPC contractor and consultant, not a lender — we are not presented here as a partner of any bank, and the loan decision is the lender's.

Want to see what a real proposal looks like before you talk to anyone?

We'll send a worked 500 kWp commercial example — layout, BOQ structure, generation model and the full CAPEX-versus-PPA comparison. A sample, not a quote for your site.

Request sample 500 kWp ROI proposal

Figures above are indicative and depend on your tariff, region, roof and tax position. Tax treatment changes — confirm depreciation and input-credit specifics with your CA before you commit. We put the assumptions on screen rather than in a footnote.

Statutory approvals

DISCOM Net-Metering & CEIG Applications Prepared and Filed In-House.

Approvals are our core trade as an MEPF contractor and consultant — not something we sub out and hope for. You sign, we file, we follow up.

  1. 1

    Feasibility & application

    Load study, single-line diagram and the net-metering application prepared and filed.

  2. 2

    CEIG / Electrical Inspector

    Drawings, test reports and the inspection itself — coordinated and attended by our team.

  3. 3

    Synchronisation & meter

    Bi-directional meter, DISCOM sign-off and grid synchronisation, through to commissioning.

Put an engineer on your plant's numbers

Share a recent HT bill and your sanctioned load — we'll tell you what captive solar can realistically offset, and what it can't.

ONE PARTNER. END TO END. You focus on your business — we handle the rest.
Quality Safety Commitment
Send your bill An engineer reviews it