Skip to content
Secured Engineers Pvt. Ltd. logo
Home
Company Insights Resources About Founder — Er. Ankur Kaplesh
Services Mechanical / HVACElectricalPlumbingFire ProtectionLow Voltage / ELVSolar EPCDesign & ApprovalsAMC / MaintenanceTurnkey EPCFire NOC AssistanceCEIG Liaison & EnergisationTesting & Commissioning
Industries Manufacturing & IndustrialHealthcare & HospitalsHospitality & HotelsWarehousing & LogisticsGovernment & DefenceEducation & InstitutionsData CentrePharmaceutical & CleanroomCold StorageTextile & ApparelAutomobile & Auto-ComponentsFood Processing & FMCGChemical & Process Industries
Free Tools ★ Architect & Design Resource Hub All 29 calculators Solar Savings Calculator Fire Water Tank Calculator Fire Pump Room Calculator AC Tonnage Calculator DG Set Sizing Calculator MEPF Cost Estimator
Projects Work With Us Get a Free Quote
Solar EPC for Rajasthan Businesses

Solar EPC contractor in Rajasthan — how much can solar cut your bill?

Share your latest electricity bill and project location for a preliminary solar assessment, estimated investment and clear next steps. Rooftop solar engineered, approved and built in Rajasthan: JVVNL / AVVNL / JdVVNL net-metering and CEIG approval filed in-house, execution across 6 industrial belts.

Prefer to run the numbers yourself first? Open the solar calculator →

15+ years · 535+ projects · Noida & Ludhiana bases · ISO 9001:2015

Scoping a package of ₹50 lakh or more? Request a project-specific quote →

Request my solar assessment

Four details to start. An engineer reviews your location and facility type, then comes back on what to check next.

Give us either a phone number or an email — whichever you prefer we use.

What are you exploring?
Your latest electricity bill

The bill is optional and goes to our team privately. It is what turns an estimate into a real size — but it is not needed to start.

What the assessment covers — and what it does not

What an engineer looks at: a suitable system size range for your site; how much of your roof is realistically usable once shading, skylights and walkways are taken out; how much of your consumption falls in daylight hours, because that is what solar can actually offset; an indicative investment range; and the engineering checks that come next — sanctioned-load headroom, roof structure and the DISCOM route for your district.

Assumptions we state rather than hide: generation figures are modelled from regional averages, not measured at your site. Indicative costs are exclusive of GST and exclude roof strengthening, HT-side works, battery storage and statutory fees.

What this is not: not a detailed engineering design, not a guaranteed saving, not an assurance that any approval will be granted, and not a commitment to a site visit. Your connected load is not the same as the solar capacity you can install, and solar offsets energy charges — it does not make an entire bill disappear. Where a number depends on something we have not seen, we will say so rather than assume it.

Net-metering authority Three licensees by region — JVVNL (Jaipur/east, incl. Alwar–Bhiwadi), AVVNL (Ajmer/south) and JdVVNL (Jodhpur/west)
Electrical inspectorate (CEIG) Electrical Inspectorate Department, Government of Rajasthan How CEIG approval works → Module rules for 2026 commissioning →
Industrial development authority RIICO (Rajasthan State Industrial Development & Investment Corporation)

Regulator names as maintained in our approvals database — the same records our filing team works from.

District jurisdiction

Which DISCOM processes net metering in Rajasthan

Rajasthan has three distribution utilities, divided by region rather than by a single published district table. Which one holds your district decides the net-metering route and the drawing format it will accept.

JVVNL — Jaipur Vidyut Vitran Nigam · Jaipur

JVVNL supplies Jaipur region — the eastern districts, including the Alwar–Bhiwadi–Neemrana industrial corridor.

Coverage as published by the utility — JVVNL source

AVVNL — Ajmer Vidyut Vitran Nigam · Ajmer

AVVNL supplies Ajmer region — the southern districts, including the Bhilwara textile belt.

Coverage as published by the utility — AVVNL source

JdVVNL — Jodhpur Vidyut Vitran Nigam · Jodhpur

JdVVNL supplies Jodhpur region — the western and northern districts, including Jodhpur, Bikaner and the Pali industrial cluster.

Coverage as published by the utility — JdVVNL source

What we will not guess. We do not publish a district-by-district Rajasthan split. The utilities’ own portals do not carry a consolidated district table, the widely-copied third-party lists contradict each other on at least Sikar and Jhunjhunu, and the state’s district boundaries were themselves reorganised recently. Your DISCOM is stated on your connection papers; we confirm it with the utility before sizing rather than assuming it from the district name.

District names are given as the utility publishes them. Boundaries and licensee areas do change — we confirm yours against the connection before sizing a plant.

Why an EPC, not an installer

Solar in Rajasthan is an approvals project too

The panels are the easy half. A C&I solar plant in Rajasthan needs JVVNL / AVVNL / JdVVNL's net-metering consent, CEIG approval from the Electrical Inspectorate Department, Government of Rajasthan, and — on HT plants — protection coordination your inspector will actually pass. We run these filings in-house for factories across Rajasthan; solar rides the same rails. That's the practical difference between an EPC and an installer with a liaison agent.

Sizing first? Start at solar for factories, the industrial solar EPC service for plants, the C&I solar EPC service, or the cost pages: 100 kW · 250 kW · 500 kW · 1 MW.

Before you size anything, check what the state actually allows: Rajasthan solar policy and net-metering rules — sanctioned-load caps, the DISCOM's filing route and the approval sequence decide how much of your roof you may actually connect.

Straight answers

Solar in Rajasthan — FAQs

Who approves net metering for a solar plant in Rajasthan?

It depends on your district. Rajasthan has 3 distribution licensees — JVVNL, AVVNL, JdVVNL — and the one that holds your district processes the net-metering or captive-registration application. The district-by-district split is on this page above. Capacity caps are tied to your sanctioned load and banking rules are state-specific; we verify both against your connection before sizing, and file in-house.

Which electrical inspectorate approves solar installations in Rajasthan?

The Electrical Inspectorate Department, Government of Rajasthan — CEIG approval and synchronisation permission are mandatory for HT-connected and larger rooftop systems. We prepare and file the CEIG documentation ourselves; it's the same inspectorate work we do for complete factory electrical systems in Rajasthan.

Do you install solar across Rajasthan, or only in the big industrial hubs?

We execute across Rajasthan — the estates listed on this page are where our project density is highest (Bhiwadi RIICO Industrial Area, Neemrana (Japanese Zone), Khushkhera Industrial Area…), but survey, design and installation teams mobilise statewide from our Noida (Delhi NCR) and Ludhiana bases.

What does commercial rooftop solar cost in Rajasthan?

The turnkey C&I benchmark of ₹24,000–32,000 per kW applies across Rajasthan (scaling from ₹28k–32k/kW at 100 kW to ₹24k–26k/kW at 1 MW) — location shifts logistics marginally, but structure type, HT works and metering scope move cost far more than geography does. See our detailed 100 kW, 250 kW, 500 kW and 1 MW cost breakdowns, or run your facility's numbers in the calculator.

Start your Rajasthan solar project

Send a recent electricity bill and roof photos on WhatsApp — an engineer will tell you what your facility can install, what it costs, and how the approvals run in your state.

ONE PARTNER. END TO END. You focus on your business — we handle the rest.