Skip to content
Secured Engineers Pvt. Ltd. logo
Home
Company Insights Resources Locations & project coverage About Founder — Er. Ankur Kaplesh
Services Mechanical / HVACElectricalPlumbingFire ProtectionLow Voltage / ELVSolar EPCMEP Consultancy & ApprovalsAMC / MaintenanceTurnkey EPCFire NOC AssistanceCEIG Liaison & EnergisationTesting & Commissioning AI Video Analytics
Industries Manufacturing & IndustrialHealthcare & HospitalsHospitality & HotelsWarehousing & LogisticsGovernment & DefenceEducation & InstitutionsData CentrePharmaceutical & CleanroomCold StorageTextile & ApparelAutomobile & Auto-ComponentsFood Processing & FMCGChemical & Process Industries
Free Tools ★ Architect & Design Resource Hub All 56 calculators Solar Financial Calculator Fire Water Storage Checker Fire Pump Room Calculator AC Tonnage Calculator DG Load Calculator MEPF Budget Calculator
Projects Work With Us Get a Free Quote
Solar Energy

Solar for IT Parks and Office Buildings: Sizing, Roof, Approvals and Payback (50 kW+)

22 October 2026 · 5 min read · by

Title card reading Solar for IT Parks and Office Buildings: Sizing, Roof, Approvals and Payback (50 kW+).
Title card. Not a photograph of a Secured Engineers site.

An IT park or office building has a large daytime load, mostly air-conditioning, but a small roof for that load, so rooftop solar usually covers a modest share of the bill. Size the plant to the usable roof, then decide how the savings reach whoever pays, since owners, tenants and the maintenance company often differ.

How much can the roof supply?

A low-rise campus of a few buildings can host a meaningful plant. A multi-storey tower has a roof far smaller than its floor area, and its load is the floor area times the cooling and plug load. The roof therefore sets a ceiling on the plant and the plant covers only part of the load.

The BEE's Energy Conservation and Sustainable Building Code 2024 (ECSBC) applies to commercial and office buildings with connected load of 100 kW or more, or contract demand of 120 kVA or more. Its clause on renewable energy systems asks for on-site generation capacity meeting at least 4% of total contract demand of the building on an annual basis, or covering a minimum of 50% of the available roof area, whichever is feasible, for ECSBC compliant buildings. That 4% figure is a fair picture of how little of a tower's load the roof serves. State governments notify and enforce the building code, so check whether yours has made it mandatory for your building.

  1. Measure the usable roof. Take out lift machine rooms, water tanks, HVAC condensers and chillers, cooling towers, DG exhausts, antennas and the shade they cast. The shadow-free area calculator helps, and the plant area calculator converts kW to area.
  2. Read the bills. Note monthly kWh or kVAh, maximum demand, sanctioned load and the tariff category.
  3. Find the daytime share. A day-shift office is almost all daytime. An IT park running 24x7 for global clients has a night load that solar will not touch, so its daytime share may be lower than you expect.
  4. Take the smallest of the daytime base load, the cap on sanctioned load and the usable roof. The sanctioned load calculator shows the cap.

What if the roof is too small?

OptionWhat it addsLimit or catch
Rooftop on all buildingsCovers every roof in the campusNeeds a shared route if buildings have separate meters
Car-park canopyLarge area over parking, with shade for carsStructure cost raises the price per kW; see carport solar
Ground-mount on campus landSimple, easy to maintainUses land; some states set stricter rules for ground plants under net metering
Off-site plant via open access or group captiveAny size, close to the best resourceWheeling and other charges; threshold of 100 kW under the 2022 rules; longer approvals
Green energy purchase from the DISCOMNo capexTariff set separately by the commission; not on-site generation

The Green Energy Open Access Rules, 2022 lowered the open-access threshold to 100 kW and set approval in 15 days or deemed grant, according to the Ministry of Power's annual report. Our guide to open-access solar explains the options.

Which approval route applies by size?

  • Net metering within the state limit. The central rules allow net metering up to 500 kW or the sanctioned load, according to PIB, and Punjab and Haryana's 2021 regulations apply that ceiling, with Punjab limiting non-domestic AC capacity to 70% of sanctioned load. Both cap annual generation at 90% of consumption, which a day-load office will normally stay under. Since February 2024, a feasibility study for systems above 10 kW has a 15-day limit with deemed approval.
  • Above it or off-site. Gross metering, open access or group captive.
  • Tall buildings. CEA 2023 regulation 38 covers multi-storeyed buildings above 15 metres: the state notifies the connected load and voltage above which the Electrical Inspector inspects, and the owner gives 30 days' notice before supply starts or restarts after six months. Rooftop plants on such buildings must also be shown to the fire authority; see Fire NOC.

What is specific to an office or IT park?

  • Tariff category. In Punjab's FY 2025-26 tariff order, IT units covered by the state's notification are under the large supply industrial schedule, while ordinary offices fall under non-residential supply. The rate you avoid, and so the payback, depends on the category. Your bill shows which.
  • Landlord, tenants and CAM. Most towers bill tenants for electricity through sub-meters and recover common-area costs as CAM charges. Who gets the solar saving depends on whose meter the plant feeds. A plant on the landlord's common-area meter reduces CAM charges, which are shared with tenants; a plant on tenant meters requires a shared-metering route. Group and virtual net metering exist in some states; ask your DISCOM. Whether a landlord can pass on solar power as a charge is a legal question for your DISCOM and lawyer.
  • HVAC-driven load. Cooling follows the sun, so the daytime load matches generation well. Check chiller and VRF schedules; a shift in chiller timing can raise or reduce self-use.
  • RCC roofs. Waterproofing must be protected. Ballasted or non-penetrating structures avoid drilling; where fixing penetrates, the waterproofing contractor should reseal. Check parapet height and wind loads on high roofs with the roof load calculator.
  • Roof access and heat. HVAC plant, DG exhaust and fire-fighting equipment live on roofs. Keep maintenance paths and escape routes clear.
  • Time of Day. The Ministry of Power's June 2023 amendment sets solar-hour tariffs 10% to 20% below normal for commercial and industrial consumers with demand of 10 kW and above from 1 April 2024, which lowers the value of midday units. Use your actual tariff order.

How do you judge the payback?

Payback is cost divided by the yearly saving. The saving is units used on site times the avoided rate, plus credited exports under the state's rules. For an office, the self-use share is high, so the avoided rate is the main variable, and it falls if Time of Day bands lower the daytime rate. Our published C&I band is ₹24,000–32,000 per kW excluding GST, with larger plants typically nearer the lower end; the 100 kW and 250 kW pages give working numbers. What moves a price inside the band is roof type and height, structure, waterproofing detail, cable run to the inverter room and interconnection voltage. Use the solar calculator for a first figure, then ask for a site-specific proposal.

How Secured Engineers helps

We design the plant in-house and file the DISCOM net-metering application, and the Fire NOC and CEIG files where required, ourselves. MEPF and solar can be carried under one contract, which suits a building that needs chillers, panels and fire fighting alongside the plant. We work from offices in Noida (Delhi NCR) and Ludhiana, on 535+ projects across 18+ states, with 89.77% repeat clients. See also commercial solar EPC.

Send your bills, roof plan and sanctioned load, and we will say what the roof and the cap allow and which shared route suits your tenancy. Start from solar for factories and large buildings, then message us on WhatsApp, call +91 70099 85817, or ask for a free proposal.

Frequently asked

How much of an office tower's load can rooftop solar cover?

Usually a small share, because a tower's roof is small compared with its floor area and cooling load. The BEE's ECSBC 2024 asks for on-site renewable generation of at least 4% of contract demand or 50% of available roof area, whichever is feasible. Measure your usable roof, after plant and shade, and use a calculator to convert area to kW before you promise a savings figure.

Does the Energy Conservation and Sustainable Building Code make solar mandatory?

The code applies to commercial and office buildings with connected load of 100 kW or more or contract demand of 120 kVA or more, and asks for on-site renewable generation as above. State governments notify and enforce the building code, so whether it is binding on your building depends on your state's notification. Ask the local development authority or the state designated agency.

Who gets the saving when a landlord installs solar in a multi-tenant building?

The meter the plant feeds decides it. A plant on the landlord's common-area meter reduces the common electricity bill and so the CAM charges shared among tenants. Tenants on their own meters save only if the plant is connected through a shared route, such as group or virtual net metering where your state has notified it. Agree in writing how savings are shared.

Do IT parks pay the industrial or the commercial tariff?

It depends on the state. In Punjab's FY 2025-26 tariff order, IT units covered by the state's notification are in the large supply industrial schedule, and ordinary offices are in non-residential supply. Because solar saves the rate you avoid, the category changes the payback. Check the schedule printed on your own bill and the latest order for your DISCOM.

What extra approvals apply to solar on a high-rise?

Beyond the DISCOM's net-metering process, CEA 2023 regulation 38 covers multi-storeyed buildings above 15 metres: the state notifies the load above which the Electrical Inspector inspects, and the owner gives notice before supply starts. The fire authority should also see the roof layout. Rules vary by state, so confirm with the inspectorate and the fire service.

Related services

Send last month's electricity bill with your enquiry — sanctioned load, tariff and consumption are all on it, and they decide the answer.

Want to know what solar would actually do on your roof?

Tell us about your project — our engineers respond within one business day.

  • ★ 4.7 (230 Google reviews)
  • 535+ projects
  • Reply in 1 business day
Add details (optional — company, email, scope and site address)

🔒 Your details go straight to our team. No spam, ever.

Ready to start your project?

Get a free consultation and quote. We design, prepare and file your approvals, and execute — you deal with one team.

ONE PARTNER. END TO END. You focus on your business — we handle the rest.
Quality Safety Commitment
Send your bill An engineer reviews it