On a leased factory the DISCOM deals only with its consumer, so the plant belongs on the connection of whoever holds the account and has legal possession of the roof. That is usually the tenant, with the landlord's written consent. Fix who owns the plant, how long the lease runs against payback, and what happens at exit, in writing, before design starts.
Who holds the DISCOM connection decides who can claim the credits
A net-metered plant is tied to one consumer connection. The generation offsets that consumer's imports, and the surplus is credited to that account. If the connection is in the tenant's name, the tenant is the consumer and applies. If the connection is in the landlord's name and the tenant pays through a sub-meter, the landlord is the consumer, and the tenant benefits only through the landlord's own arrangement.
The regulations we read say the same about the roof. Maharashtra's 2019 regulation requires the eligible consumer to own or be in legal possession of the premises, including the rooftop, and to consume the electricity there. Gujarat's 2016 net-metering regulation says the consumer shall own a plant set up on its own premises or premises in its legal possession, and asks for documents of legal possession or a co-owner's no-objection. A lease with no clause on roof rights is the usual gap.
Which ownership structures can work?
- Tenant owns the plant. The tenant pays, claims the saving and carries the exit risk. It suits a long lease or a tenant that can move the plant. Our capex versus opex calculator compares it with the alternatives.
- Landlord owns the plant. The landlord is the DISCOM consumer or arranges a separate connection. The tenant's saving flows through a rent or power-charge arrangement. It suits a landlord with several tenants, and it needs a clear metering and billing mechanism.
- Third party owns the plant. Punjab's regulation allows systems that are self-owned or third-party-owned and defines a service company that owns a renewable system and provides renewable energy to the consumer. Maharashtra's allows a system owned or operated by the consumer, by the licensee or by a third party leasing it to the consumer. Madhya Pradesh provides for a system leased by a service company, and says third-party sale of power is not allowed under net metering other than between a parent consumer and its participating connections. So the contract wording matters: a lease of a system is not the same thing as a per-unit sale of power.
Whichever you choose, ask the DISCOM, in writing, which structure it accepts for your category in your state, because the regulations differ and are amended.
Does the lease run long enough?
Payback is capital cost divided by the yearly saving, and the saving arrives over years. Our published C&I band is ₹24,000–32,000 per kW excluding GST, and the solar payback calculator turns your bill into a payback figure. Then lay the number against the lease.
- Remaining lease shorter than payback: do not buy the plant outright unless the lease is extended in writing, or the landlord agrees a buy-back. A third-party-owned structure is the other route.
- Remaining lease about equal to payback: any benefit is marginal and renewal risk decides it. Get the renewal option first.
- Remaining lease comfortably longer than payback: ownership is workable, provided the roof will last. Check the sheeting life and strength with the roof load calculator and a structural survey.
What should go into the lease?
Treat the lease amendment as part of the project, not as an afterthought. Your lawyer should draft it; the table lists the clauses to ask for and what each prevents.
| Clause | What to write | Risk it removes |
|---|---|---|
| Roof rights and access | Tenant may install, operate and maintain a solar plant on a defined roof area, with access for staff and cleaning | Landlord later refusing access or relocating the area |
| Landlord consent and NOC | Landlord signs the consent the DISCOM or inspector needs, within a fixed time | Application stalling for want of a document |
| Structure and roof condition | Who surveys, who strengthens, who repairs leaks; warranty on penetrations | Disputes when the roof leaks after the plant is installed |
| Ownership of the plant | The plant stays the tenant's or the third party's movable property, not a fixture of the building | Landlord claiming it at exit |
| Term and renewal | Lease term at least as long as payback with margin, or renewal at the tenant's option | Paying for a plant you cannot use long enough |
| Exit options | Removal with the roof made good, buy-back at a valuation formula, or transfer to an incoming tenant | An unpriced plant at the end of the lease |
| Metering and billing | Which meter is read, who pays, and how any landlord-tenant credit is calculated | Disputes about credits and the DISCOM bill |
| Insurance and damage | Who insures the plant and the roof, and who bears fire or storm damage | An uninsured loss |
| Assignment and lender consent | Rights if the landlord sells or mortgages the building | A new owner or lender refusing the plant |
What if several tenants share a roof?
A multi-tenant factory complex with one large roof and several connections is the case where one tenant's connection cannot use all the output. Some state regulations provide for group or virtual net metering, where one plant's output is adjusted across more than one connection of the same consumer or a set of consumers. Madhya Pradesh's 2024 regulation, for example, defines both and allows them below 100 kW capacity within the same licensee's area, with wheeling charges and losses applying on the participating connections. Check whether your state has an equivalent before you plan shared generation, and take care that a landlord reselling power to tenants does not breach the rules on third-party sale.
What happens at exit?
Decide it at the start. If the tenant removes the plant, the lease must give time for the work, require the roof to be made good, and say who pays for the DISCOM's meter and disconnection. If the landlord buys it, set the valuation formula now, for example depreciated cost, rather than a figure to be agreed later. Also settle what happens to the connection, because the consumer name on the account determines who can export, and a change of name or load takes time at the DISCOM.
How Secured Engineers helps
We design solar in-house and file the DISCOM net-metering application, and where required the CEIG file, in-house, so the paperwork is built around the connection holder's name from the first drawing. MEPF and solar can sit under one contract. We work from offices in Noida (Delhi NCR) and Ludhiana, with 535+ projects across 18+ states and 89.77% repeat clients. We are not lawyers, so the lease wording stays with yours; we supply the technical schedule and the roof and load facts the clauses depend on.
If you tell us who holds the connection, how much of the lease remains and what the roof is made of, we will say which structure fits and how much plant the connection allows. See our solar for factories page and the solar calculator, message us on WhatsApp, call +91 70099 85817, or ask for a free proposal.
Frequently asked
Can a tenant install solar on a leased factory?
Yes, in the states whose regulations we read, if the tenant is the DISCOM's consumer for the connection and is in legal possession of the roof, with the landlord's written consent. Maharashtra's regulation requires the consumer to own or be in legal possession of the premises, and Gujarat's 2016 regulation asks for documents of legal possession. The lease should say so expressly.
Who should sign the net-metering agreement with the DISCOM?
The DISCOM's consumer, meaning the name on the connection that the plant is tied to. If the connection is in the tenant's name, the tenant signs. If it is in the landlord's name, the landlord is the consumer and the tenant's savings depend on a private arrangement with the landlord. Settle this before the application, because a name change mid-way restarts the paperwork.
Can a solar company own the plant on my leased roof?
Often, yes. Punjab, Maharashtra and Madhya Pradesh regulations all provide for systems owned by a third party or leased by a service company to the consumer. The terms differ by state: Madhya Pradesh states that third-party sale of power is not allowed under net metering outside the parent-participant arrangements, so the contract should be structured as the regulation allows. Ask the state's DISCOM which structure it accepts.
How long should the lease be for solar to make sense?
Longer than the payback period with a margin, because the saving arrives over years. If the remaining lease is shorter than the payback you either need an extension, a buy-back or a third-party-owned structure with no upfront cost. Run your numbers in a payback calculator and then compare the result with the lease term and any renewal rights.
What happens to the plant when the lease ends?
It depends entirely on what you wrote. The options are removal by the tenant with the roof made good, sale to the landlord at an agreed value, or transfer to the incoming tenant. Without a clause, the landlord can claim that fixtures stay with the building. Put the choice, the valuation method and the removal timetable in the lease before any equipment is ordered.
Related services
Related guides
- A Plant Down 8% Looks Exactly Like a Plant Working Fine.
- Three Vendors, One Roof, Three Different Generation Figures.
- Perovskite Cells Promise 30%+ Efficiency. Your Roof Doesn't Have Ten Years to Wait and See.
- Solar for Chemical Plants: Sizing, Roof, Approvals and Payback (50 kW+)
- Solar for Dairy Plants: Sizing, Roof, Approvals and Payback (50 kW+)
- Solar for Feed Mills and Poultry Units: Sizing, Roof, Approvals and Payback (50 kW+)
Related on this site
- termALMM
- termNet Metering
- termOpen Access (Solar)
- serviceInverters (String / Central) (Solar EPC)
- serviceMounting Structures & BOS (Solar EPC)
- calculatorMEP Maintenance Budget Calculator
- calculatorSolar Amc Cost Calculator
- buyer's guideHow to Select a Solar EPC Contractor
- guideFire NOC for factories
- guideCEIG approval for factories
More on Solar & Renewables · all insights