Honeywell Notifier Addressable Fire Alarm — AIIMS Raipur — Fire Detection & Alarm, Extra Low Voltage (ELV)
A 10-loop Honeywell Notifier addressable fire alarm system with 1,000 sensors, completed in 2018 for a central-government medical institute — delivered as the fire-safety package partner to a tier-1 infrastructure EPC.
6 project facts verified by Secured Engineers — 27 September 2026
Checked against our project record by Ankur Sharma:
- The site: AIIMS Raipur
- The contracting route: delivered with Punj Lloyd, who held the main contract
- The platform: Honeywell Notifier addressable fire detection and alarm
- A 10-loop panel
- 1,000 addressable sensors
- Completed in 2018
The engineering commentary below sets out how systems of this type are designed and what a building of this kind demands — our professional view, offered so you can judge the thinking behind the work.
Project snapshot
- Client
- Punj Lloyd — for AIIMS Raipur
- Industry
- Healthcare & Hospitals
- Location
- Raipur, Chhattisgarh
- Project type
- Two-trade healthcare project
- Services delivered
- Low Voltage / ELV
- Project status
- Completed
- Completed
- 2018
Scope
- Fire Detection & Alarm
- Extra Low Voltage (ELV)
- 10 detection loops
- 1,000 addressable sensors
- Honeywell Notifier platform
- Completed 2018
Capacities delivered
- 10-loop addressable fire alarm panel
- 1,000 addressable sensors across the 10 loops
Engineering challenge
- A teaching hospital cannot be emptied on an alarm. Patients in wards, ICUs and operating theatres cannot self-evacuate, so the system has to support defend-in-place and progressive horizontal evacuation — moving people into an adjacent protected compartment — rather than sounding one building-wide evacuation.
- One building holds rooms with nothing in common: wards and corridors, diagnostic suites with sensitive equipment, kitchens and plant rooms, records stores, electrical and server rooms. Detection has to be selected per space, not per floor.
- The fire alarm is what triggers everything else — air-handling shutdown, lift homing, door release, stair pressurisation. Those interfaces decide whether the building behaves correctly, and they are settled on paper before a single device is fitted.
- Delivering inside a tier-1 EPC programme means the fire-alarm package lands on someone else's schedule, in someone else's shafts, alongside trades already on site.
Our solution
- Delivered the Honeywell Notifier addressable fire detection and alarm package in collaboration with Punj Lloyd, as the specialist fire-safety partner inside their programme.
- Addressable architecture throughout, so each of the 1,000 sensors reports individually rather than only as part of a zone.
- The system was built on ten detection loops.
- Worked inside the main contractor’s programme and interfaces, as a package partner rather than as the principal contractor.
Execution
- Honeywell Notifier addressable fire detection and alarm platform
Outcome
- Addressable fire detection and alarm delivered on a central-government medical institute, completed in 2018.
- Delivered as fire-safety package partner to a tier-1 infrastructure EPC, on their programme and to their interfaces.
- Device-level addressability across 1,000 sensors, so an alarm reports a specific device rather than only an area.
- Ten detection loops across the installation.
Lessons and engineering considerations
- Get the fire-compartment plan first. Detection zoning that does not follow the compartments cannot support horizontal evacuation, however good the detection is.
- In a hospital the cause-and-effect matrix is the deliverable and the panel only executes it. Agree it with the fire consultant and the HVAC and electrical packages before loop design, not after — air-handling shutdown, lift homing, door release and stair pressurisation are what decide whether the building behaves correctly.
- Loop count is not only a capacity question. It also decides how much of a building a single cable fault can take with it, which is why a hospital is rarely worth wiring as a few long loops.
- Addressable stops being a preference and becomes a requirement the moment a building has more rooms than a response team can search during an alarm.
More projects
Browse all delivered projects by sector and city.
Full MEPF Package for JMH Prime, Jeewan Mala Hospital — Karol Bagh, New Delhi
The complete MEPF package — HVAC, electrical, plumbing and fire fighting — for JMH Prime, the new building of Jeewan Mala Hospital in Karol Bagh, New Delhi, completed in October 2026.
Distribution WarehouseSBJ Nirmal Rotavator-Parts Distribution Warehouse — Ludhiana
The electrical, ELV and fire-fighting package for a new single-span distribution warehouse at a rotavator-parts manufacturer in Ludhiana district — delivered as one scope, and in operation in the company photographs of October 2026.
CommercialWhole-MEP Package for Solitaire Walk High-Street Retail — Ludhiana
In execution: the complete MEP package — HVAC, electrical and plumbing — for a six-acre open-air high-street retail and commercial development on Lodhi Club Road, Ludhiana.