Skip to content
★ FREE Get your complete MEP / Solar project blueprint — free · only 6 free audits left this month Claim my free blueprint →
Secured Engineers Pvt. Ltd. logo
Home
Company Insights Resources About Founder — Er. Ankur Kaplesh
Services Mechanical / HVACElectricalPlumbingFire ProtectionLow Voltage / ELVSolar EPCDesign & ApprovalsAMC / MaintenanceTurnkey EPCFire NOC AssistanceTesting & CommissioningIndustrial Audits
Industries Manufacturing & IndustrialHealthcare & HospitalsHospitality & HotelsWarehousing & LogisticsGovernment & DefenceEducation & InstitutionsData CentrePharmaceutical & CleanroomCold StorageTextile & ApparelAutomobile & Auto-ComponentsFood Processing & FMCGChemical & Process Industries
Free Tools ★ Architect & Design Resource Hub All 29 calculators Solar Savings Calculator Fire Water Tank Calculator Fire Pump Room Calculator AC Tonnage Calculator DG Set Sizing Calculator MEPF Cost Estimator
Projects Work With Us Get a Free Quote
Free Tool · Electrical & Compliance

CEIG / Electrical Inspector Readiness Checker

CEIG / Electrical Inspector Readiness Checker — quick estimate

Not sure if your installation needs Electrical Inspector (CEIG) approval — or how close your file is to inspection-ready? Enter your connection, substation and DG details, tick off what's done, and get an indicative applicability read plus a readiness score. Then let our electrical team take the drawing-to-clearance file end-to-end.

Your installation

500 kVA
Readiness checklist — tick what's done

Indicative guidance based on the Electricity Act 2003 and CEA safety regulations, as administered by the state Chief Electrical Inspectorate / Directorate of Electrical Safety. HT connections (11 kV+), substations/transformers and DG sets of consequence are typically in scope; LT-only micro-units may sit below the threshold. Confirm current triggers with your state inspectorate.

CEIG approval
Readiness score
Drawing-stage documents
Indicative timeline
Next step

Get your CEIG file taken end-to-end — free review

Our electrical engineers will confirm the applicable triggers for your state, prepare the SLD/earthing/protection drawing set, run the pre-inspection tests and carry the file through to clearance. We'll attach your inputs above automatically.

🔒 Your estimate is attached automatically. No spam — ever.

or reach us directly

This tool is indicative only and is NOT a regulatory determination. Actual CEIG/Electrical Inspector applicability, document requirements and timelines are governed by the Electricity Act 2003, CEA regulations and state inspectorate practice, and vary by state. A licensed electrical contractor and the inspectorate are the final word — which we coordinate as part of our service.

Need an exact BOQ, rate analysis or measurement sheet?

This is a quick engineering estimate. For tendering, billing or audit, our QS & estimation team prepares an item-wise BOQ, rate analysis and a verified measurement sheet to IS / CPWD norms — backed by 15+ years and ISO 9001:2015 quality processes.

ONE PARTNER. END TO END. You focus on your business — we handle the rest.
Quality Safety Commitment
Chat / Get Quote