CEIG / Electrical Inspector Readiness Checker
CEIG / Electrical Inspector Readiness Checker — quick estimate
Not sure if your installation needs Electrical Inspector (CEIG) approval — or how close your file is to inspection-ready? Enter your connection, substation and DG details, tick off what's done, and get an indicative applicability read plus a readiness score. Then let our electrical team take the drawing-to-clearance file end-to-end.
Your installation
Indicative guidance based on the Electricity Act 2003 and CEA safety regulations, as administered by the state Chief Electrical Inspectorate / Directorate of Electrical Safety. HT connections (11 kV+), substations/transformers and DG sets of consequence are typically in scope; LT-only micro-units may sit below the threshold. Confirm current triggers with your state inspectorate.
Get your CEIG file taken end-to-end — free review
Our electrical engineers will confirm the applicable triggers for your state, prepare the SLD/earthing/protection drawing set, run the pre-inspection tests and carry the file through to clearance.
Have a BOQ, drawing or tender for this scope? Send it for an item-wise rate-analysis review →
Your request is in
Your request reached our team with exactly what the preview showed. If an engineer needs your drawings, bill or data, they will use the number you gave.
This tool is indicative only and is NOT a regulatory determination. Actual CEIG/Electrical Inspector applicability, document requirements and timelines are governed by the Electricity Act 2003, CEA regulations and state inspectorate practice, and vary by state. A licensed electrical contractor and the inspectorate are the final word — which we coordinate as part of our service.
Got your number — what next?
A calculator gives you a first figure. These take it further.
The work itself
Read before you specify
The terms behind it
One of 56 free MEPF and solar calculators on this site. Every input term is defined in the engineering glossary; the specification libraries, clearance guides and checklists for design teams are in the architects' section.
Need an exact BOQ, rate analysis or measurement sheet?
This is a quick engineering estimate. For tendering, billing or audit, our QS & estimation team prepares an item-wise BOQ, rate analysis and a verified measurement sheet to IS / CPWD norms — backed by 15+ years of estimating our own projects.
Guides that reference this page
- CEIG Approval in Uttarakhand: Electrical Inspector Process for Factories
- CEIG Approval in Uttar Pradesh: Electrical Safety Directorate Process
- CEIG Approval in Punjab: Chief Electrical Inspector Process for Factories
- CEIG Haryana Approval Process: Portal, Forms and Inspection for Factories
- Transformer for a Factory: kVA, Type, Losses and Cost Drivers
- The Complete Checklist of Documents Required for CEIG Approval