Skip to content
Secured Engineers Pvt. Ltd. logo
Home
Company Insights Resources Locations & project coverage About Founder — Er. Ankur Kaplesh TEDx talk, books & interviews
Services Mechanical / HVACElectricalPlumbingFire ProtectionLow Voltage / ELVSolar EPCMEP Consultancy & ApprovalsAMC / MaintenanceTurnkey EPCFire NOC AssistanceCEIG Liaison & EnergisationTesting & Commissioning AI Video Analytics
Industries Manufacturing & IndustrialHealthcare & HospitalsHospitality & HotelsWarehousing & LogisticsGovernment & DefenceEducation & InstitutionsData CentrePharmaceutical & CleanroomCold StorageTextile & ApparelAutomobile & Auto-ComponentsFood Processing & FMCGChemical & Process Industries
Free Tools ★ Architect & Design Resource Hub All 56 calculators Solar Financial Calculator Fire Water Storage Checker Fire Pump Room Calculator AC Tonnage Calculator DG Load Calculator MEPF Budget Calculator
Projects Work With Us Submit RFQ Get a Free Quote
Solar Energy

1 MW Solar: Cost per Unit of Electricity vs Your Grid Tariff

31 October 2026 · 5 min read · by

Title card reading 1 MW Solar: Cost per Unit of Electricity vs Your Grid Tariff
Title card. Not a photograph of a Secured Engineers site.

On the site's published assumptions, a 1 MW rooftop solar plant produces electricity at roughly ₹0.9 per unit if you simply divide lifetime cost by lifetime units, and at roughly ₹1.9 to ₹2.3 per unit once the cost of money is counted at 8% to 10%. Compare that figure with the energy charge on your own HT bill, not with a state average.

How does the capex become a rupee per unit?

The levelised cost of electricity, or LCOE, is the total cost of owning the plant over its life divided by the units it generates over the same life. The inputs below come from the published 1 MW cost page and the site's solar calculators.

InputValue usedWhere it comes from
Turnkey cost, excluding GST₹2.40 to 2.60 crore (₹2.50 crore used)Published 1 MW cost page
Year-1 generationAbout 14.4 lakh units (120 units per kW per month)Site solar calculators, North India average
Operation and maintenance1% of capex per yearDefault in the site's payback model
Plant life25 yearsAssumption of this article
Annual output decline0.5% a yearAssumption of this article; check the module warranty
Cost of money0%, 8% and 10%Assumption of this article

The ₹/kW band behind the capex is the published one; this article adds no new price. Everything else in the table is arithmetic on stated assumptions, not a quotation.

What does the arithmetic give?

With no discounting, lifetime cost is the ₹2.50 crore capex plus 25 years of O&M at ₹2.5 lakh a year, about ₹3.1 crore. Lifetime generation with a 0.5% annual decline is about 3.39 crore units. The ratio is about ₹0.92 per unit. That is the lowest honest number, and it ignores the time value of money.

Discounting both costs and units at the owner's cost of money is what a finance team will do. At 8% the LCOE comes to about ₹1.87 per unit; at 10% about ₹2.16. Moving capex across the published band, ₹2.40 crore to ₹2.60 crore, changes the 10% figure between about ₹2.08 and ₹2.25 per unit.

Which assumptions move the answer most?

Yield and the cost of money move the result more than the capex band does. If the plant generates 10% less than 120 units per kW per month, perhaps from shading, soiling or a foggy winter, the 10% LCOE rises to about ₹2.41. If it generates 10% more, as sites in Rajasthan and Gujarat can, it falls to about ₹1.97. The cost of money matters because almost all the cost is paid in year one while the units arrive over 25 years.

Things this model leaves out, each of which a real appraisal should add: inverter replacement during the plant life, land or roof lease, insurance, loan interest if the plant is debt-funded, taxes and depreciation benefits, and the value of units exported to the grid. Treating exported units as zero, as the site's payback model does, is conservative where export is paid and generous where it cannot be absorbed.

How does this compare with your grid tariff?

An HT industrial bill is not one number. The energy charge per unit, the demand charge per kVA, the fuel and power purchase cost adjustment, electricity duty and any time-of-day factors all differ by state and by DISCOM, and they are revised through the regulator's tariff orders. Solar replaces the units you would have bought in daylight, so compare the LCOE with your avoidable energy charge per unit, not with your average bill divided by units. Fixed and demand charges are usually not avoided.

The site's payback model uses a blended ₹9 per unit as its default tariff; it is a default, not a state figure. Read the current tariff order on your state commission's site, such as those linked from the Central Electricity Regulatory Commission and the state regulators, and use your own bill for the real figure. If your avoidable energy charge is well above the LCOE, solar saves money on every unit it supplies. If it is close, the cost of money and yield decide.

What if the plant is bigger than your daytime load?

LCOE assumes every unit has value. A plant larger than daytime demand exports, and the value of exports depends on the state's net-metering or banking rule and may be much lower than the avoided tariff. The solar payback calculator shows payback at 100%, 80% and 60% self-use so you can see how sensitive the result is. Above the net-metering cap the question moves to captive or open access, covered in the open-access solar guide.

Worked comparison with a placeholder tariff

Suppose, purely as a placeholder, that your avoidable energy charge is ₹8 per unit. A plant that delivers 14.4 lakh units in year one then offsets about ₹1.15 crore of purchases, if every unit is used on site. Against that, the 10% cost-of-money LCOE of about ₹2.16 per unit means the plant produces those units at roughly a quarter of the purchase price. The gap, about ₹5.8 per unit before tax effects, is the margin that pays for the capital. Replace ₹8 with the number on your bill; if your tariff is lower, the margin shrinks, and the self-use share starts to matter more than the capex band.

The same arithmetic shows why an unused unit is expensive. A unit exported at a low credit is still a unit you paid to produce, so the cost per useful unit rises with the share you cannot use.

What should you ask each bidder?

  1. Year-1 generation in kWh for your site, and the basis.
  2. The guaranteed performance ratio and the annual decline in the module warranty.
  3. What the price includes: HT bay, cabling, CEIG approval and net-metering.
  4. O&M scope and cost after the first year.
  5. Whether the inverter replacement is priced into the lifecycle.

How Secured Engineers helps

For a 1 MW enquiry the company models generation, tariff and self-use on your own bills before quoting, and covers the HT works, CEIG approval and DISCOM file. Design is done in-house, and approvals such as Fire NOC, CEIG and DISCOM net-metering are filed in-house. Mechanical, electrical, plumbing, fire and solar work can sit under one contract. The company works from offices in Noida and Ludhiana and reports 535+ projects across 18+ states and an 89.77% repeat-client rate.

To discuss your site, WhatsApp or call +91 70099 85817, or request a free quote. The relevant page is 1 MW solar plant cost.

Frequently asked

What is the cost per unit of electricity from a 1 MW solar plant?

On the site's published capex band of ₹2.40 to 2.60 crore, 120 units per kW per month, 1% annual O&M and a 25-year life, it is about ₹0.9 per unit undiscounted and about ₹1.9 to ₹2.3 per unit at an 8% to 10% cost of money. Your site's yield and finance route change this.

Why is the discounted figure so much higher than the simple one?

Almost all of the cost is paid in year one, while the units arrive over 25 years. Discounting gives later units less weight, which raises the cost per unit. The simple figure ignores the time value of money; the discounted figure reflects what the capital could have earned elsewhere.

Should I compare solar LCOE with my average electricity bill per unit?

No. Solar replaces the energy charge on the units it supplies, not the fixed or demand charges. Compare it with your avoidable energy charge per unit from your latest HT bill, including any fuel adjustment and duty that apply to those units, and read the current tariff order for your state.

What does a 10% change in generation do to the cost per unit?

In this model, 10% less generation raises the 10% cost-of-money LCOE from about ₹2.16 to about ₹2.41 per unit, and 10% more lowers it to about ₹1.97. Shading, soiling, tilt, fog months and inverter downtime are the usual causes of a shortfall.

What is left out of this calculation?

Inverter replacement during the plant life, roof or land lease, insurance, loan interest, taxes and depreciation benefits, and the value of exported units. Each should be added in a full appraisal. The model also uses the site's North India yield, so sites in other regions will differ.

Related services

Send last month's electricity bill with your enquiry — sanctioned load, tariff and consumption are all on it, and they decide the answer.

Want to know what solar would actually do on your roof?

Tell us about your project — our engineers respond within one business day.

  • ★ 4.7 (230 Google reviews)
  • 535+ projects
  • Reply in 1 business day
Add details (optional — company, email, scope and site address)

🔒 Your details go straight to our team. No spam, ever.

Ready to start your project?

Get a free consultation and quote. We design, prepare and file your approvals, and execute — you deal with one team.

ONE PARTNER. END TO END. You focus on your business — we handle the rest.
Quality Safety Commitment
Send your bill An engineer reviews it