Fire NOC and Fire Licence for a Factory in West Bengal: WBFES Process and Renewal
West Bengal has no single document called a fire NOC. The Fire and Emergency Services department (WBFES) issues a fire safety recommendation on plans, a fire safety certificate for high-risk and high-rise buildings, and a fire licence for storing or processing hazardous substances. Applications run online through the SilpaSathi portal, and the published timeline for a licence is 60 days.
Which of the three documents does your factory need?
The three are linked, so it helps to see them side by side. The WBFES FAQ states that a fire safety certificate is required for every high-rise and high-risk building and that it is a condition for granting the fire licence, while the licence itself is required for storing, keeping or processing inflammable articles beyond the limit in the West Bengal Fire Services Act, 1950.
| Document | When a factory needs it | What the portal asks for |
|---|---|---|
| Fire safety recommendation (FSR) | Applied for on the building plans, before the building is complete; it sets out the fire measures to install | Location, site, section, elevation, floor, roof and master plans, floor-area statement, applicant identity and PAN |
| Fire safety certificate (FSC) | High-risk buildings and high-rise buildings above 14.5 m | Plans again, a copy of the last FSR, ownership deed, completion certificate, PAN of firm and owners |
| Fire licence (grant, then renewal) | Storing or processing inflammable or hazardous substances beyond the Act's limits | Site plan with section drawing at 1:100, FSC and FSR copies, old licence if any, PAN, landowner consent if rented |
For the recommendation, the WBFES FAQ says the owner or occupier applies to the Director General or the divisional officer with architectural drawings: a site or location plan, floor-wise plans, a roof plan, a ground-floor plan showing side open space, the width of the approach road and the main exits, an area statement in metres, and section and elevation plans. For a factory, the approach road and open space shown on that ground-floor plan are what the officer reads to judge how a fire tender will reach the building, so draw them to scale and match them to the site.
Is a factory a "high-risk building"?
Often, but not always. WBFES lists the categories in a notification of 8 July 2003, reproduced in its FAQ. Several describe factory activity: storage, handling, manufacturing or processing of highly combustible or explosive materials; materials that give off poisonous fumes; corrosive or noxious acids and alkalis; processes producing explosive dust; pressurised gas storage above stated quantities; hazardous and flammable liquids; and hazardous solids such as wood and cotton. Power generation and distribution centres, transformer houses and industrial switchgear rooms are on the list too.
That means a factory with a large electrical room can fall in the high-risk category even if its process is benign. Do not assume your unit is outside it. Classify the building against the notification, or ask the divisional fire office, before you plan the fire system.
How does the fire licence application run?
- Register on SilpaSathi with a mobile number and email, verified by OTP, and create a common application form for the unit.
- Choose "Grant of Fire License" and fill in applicant, property address, floor-area and premises details.
- Upload documents as PDFs. The WBFES page lists the landowner's consent letter if the premises are rented, the site plan with section drawing at 1:100 cut into A4 pages, the FSC, the FSR, any old licence, the applicant's PAN and any other document.
- Declare and submit, then pay online. The portal states that the fee is an annual fee for using a premises for storing and processing hazardous substances, set by a rate table on the application page, and payment goes through the state's GRIPS gateway.
- Track and download. Status updates arrive by SMS and email, and the final certificate is downloaded from the dashboard. Anyone can verify a certificate on the portal using its number.
The user manual states a 60-day timeline under WBRTPS for both grant and renewal. For the fire safety recommendation, the portal publishes a fee per square metre of floor area by occupancy category: Rs 8.70 for the category that includes major electrical installations and automobile workshops, and Rs 13.05 for premises storing hazardous substances. Check the page for the current rates.
What should you check at renewal?
The Renewal of Fire License service applies to a licence whose validity has ended, and it asks for the same document set as the grant. A third-party reproduction of the Fire Licence Rules, 2004 gives a one-year validity and an application at least one month before expiry; we have not been able to confirm that wording on a WBFES page, so check it against the licence in your hands and diarise the expiry well ahead.
Before renewing, compare three things. The hazards you declared against what you now store, the layout in the 1:100 plan against what is built, and the FSC and FSR numbers against the ones quoted on the application. A layout that has changed since the old plan is a likely way for a renewal to turn into a fresh inspection. Our guide to fire NOC for factories in Punjab, Haryana and UP shows how the same documents are built in other states, and our note on a change of use or expansion explains when a new file is needed.
What happens if the file is wrong?
WBFES states that owners and occupiers are liable, and that violation of the rule is a cognizable and non-bailable offence. The Director General can compound an offence on a plea of guilt under section 38B of the Act, with a government fee that the FAQ gives as Rs 20,000 to Rs 5,00,000 depending on the hazard and area. The more useful lesson is practical: the licence, the certificate and the installed system need to describe the same building. If your fire fighting drawings predate a mezzanine, a new store or a new transformer room, correct them before you apply.
How Secured Engineers helps
We design fire protection in-house, and Fire NOC, CEIG and DISCOM net-metering filings are done in-house. Fire fighting, electrical, HVAC, plumbing and solar can sit under one contract. We work from offices in Noida (Delhi NCR) and Ludhiana, with 535+ projects across 18+ states and 89.77% repeat clients. This site does not claim a delivered-project record in West Bengal; for a West Bengal factory we mobilise from Noida and Ludhiana, and this article is a buyer's guide, not a record of our work there.
The most useful thing we can do before you apply is read your file. Send the fire safety recommendation, any certificate or earlier licence, the 1:100 site plan and section drawing, and a list of what you store, and we will tell you what does not match the fire system drawings. Start with our fire NOC assistance page, message us on WhatsApp, call +91 70099 85817, or ask for a free proposal.
Frequently asked
Does a factory in West Bengal need a fire NOC?
West Bengal does not issue one document called a fire NOC. A factory deals with WBFES for a fire safety recommendation on its plans, a fire safety certificate if the building is high-risk or high-rise, and a fire licence if it stores or processes hazardous or inflammable substances beyond the limits in the Act. Which of these apply depends on what the building is used for.
How long does WBFES take to decide a fire licence?
The SilpaSathi user manuals for grant and renewal of a fire licence both state a timeline of 60 days under the West Bengal Right to Public Services (WBRTPS) rules. That is the period the portal publishes for the authority to act. A query on the file or a missing document can still stretch the real time, so file complete and track the status.
Where do I apply for a fire licence in West Bengal?
Online. WBFES lists Grant of Fire License and Renewal of Fire License as e-services, and the applications run through the SilpaSathi single-window portal, where you create a common application form, upload documents as PDFs, pay online and download the certificate. The portal also lets a third party verify a certificate by its number.
What happens if a factory runs without the required certificate or licence?
The WBFES FAQ says owners and occupiers are liable and that violation is a cognizable and non-bailable offence. The Director General can compound an offence on a plea of guilt, with a government fee that the FAQ puts between Rs 20,000 and Rs 5,00,000 depending on the hazard and the area involved. Treat that as a reason to fix the file, not a price.
Can Secured Engineers review my fire file before I submit it?
Yes. Send the fire safety recommendation, any certificate or earlier licence, the 1:100 site plan and section drawing, and a list of what you store. We review the file against the fire system drawings for gaps and tell you what is missing. We do not sell audits and we do not give an opinion on what the fire officer will decide.
Related services
Related guides
- Fire NOC Requirements in India: Planning a New or Renovated Building
- Fire NOC Fees in Punjab: What the 2024 Act and Rules Charge, by Building Type
- Punjab Fire and Emergency Services Act 2024: What Changed for Factories
- Choosing a Fire Fighting Contractor for a Factory: Licences, Design Capability and NOC Record
- Fire Fighting System BOQ for a Factory: Hydrants, Sprinklers, Pumps, Tank and Detection
- Checking Fire NOC Application Status Online: State Portals and What Each Status Means
Related on this site
- termFire Damper
- termFire Hydrant System
- termFire Extinguisher Rating
- serviceFire Pumps & Pump Room (Fire Protection)
- serviceFire Extinguishers & Portables (Fire Protection)
- calculatorMEP Maintenance Budget Calculator
- calculatorSprinkler Calculator
- buyer's guideHow to Select a Fire Protection Contractor
- guideFactory licence and DISH approval
- guideCTE/CTO pollution consent
More on Fire Safety · all insights