After a fire or flood, the insurer's surveyor tests three things: that the property is what you declared, that it was kept as the law and the policy expect, and that the loss is what you claim. For MEP that means approvals, test and commissioning records, as-built drawings and maintenance logs. Missing papers rarely void a claim, but they slow it and invite disputes.
What does an insurer ask for, and how fast must it move?
IRDAI's Protection of Policyholders' Interests Regulations, 2017 (regulation 15, claim procedure for general insurance) set the clock. In the text we read, the insurer must appoint a surveyor within 72 hours of intimation where one is needed, and must tell you within 7 days which documents are essential. The surveyor starts within 48 hours of appointment and files an interim report on the physical loss within 15 days of the first visit. The final report is due within 30 days of appointment, or 90 days for commercial and large risks. After the final report and the last necessary document, the insurer has 30 days to offer a settlement or give written reasons for rejection, and owes interest at 2% above bank rate if it is late.
Two sentences in that regulation help an owner. The insurer and surveyor must not call for documents that are not relevant to the claim, and where a document sits with a public authority, they are to obtain it. IRDAI has issued later circulars, so confirm the current text with your insurer; the 2017 regulations are the version we could read in full.
Which MEP documents does a surveyor actually need?
The IRDAI standard-product wording for micro-enterprises (Bharat Sookshma Udyam Suraksha) asks you to support a claim with plans, specification books, vouchers and invoices for reconstruction, and to let the surveyor take measurements, samples and photographs. Larger industrial policies use the insurer's own wording, so read yours. For a factory or warehouse, this is the working list.
| Document | What it proves | Usually held by |
|---|---|---|
| Fire NOC and latest renewal | The fire scheme was approved and kept current for the building as it stood | Owner, state fire service |
| Electrical inspector approval or self-certification report | The installation was inspected before charging and periodically after (CEA 2023, regulations 32 and 33) | Owner, inspectorate |
| As-built drawings: single-line diagram, panel schedules, fire layouts | What was installed and where, so damaged items can be listed and reinstated | Contractor, owner |
| Test and commissioning reports: insulation resistance, earth resistance, fire pump and alarm tests | The system worked when handed over | Contractor |
| Maintenance and AMC logs, extinguisher refill and test records | The system was kept working; regulation 29(2) requires extinguisher tests to be recorded | Owner, AMC vendor |
| Modification record, with dates | Changes to load, process or layout since the policy was written | Owner, contractor |
| Purchase invoices, BOQ, equipment nameplate data | Value and specification of the items claimed | Owner, contractor, OEM |
| Photographs and meter or BMS data from before the loss | Pre-loss condition and operating state | Owner |
Our guides on the handover file and fire AMC neglect and insurance go deeper on how to keep this file.
Does missing paperwork void the claim?
Not by itself. Nothing in the IRDAI template lists a lapsed NOC as an exclusion. The risks are quieter, and the template shows where they sit.
- Disclosure. The insurer covers you on the information you gave. You must tell it at once if you change your business or processes, change the use of the premises, or leave a building unoccupied for more than 30 days. A new production line wired without telling the insurer is the kind of change a surveyor can find in your own modification record.
- The electrical exclusion. Damage to an electrical machine from over-running, short-circuit, arcing or self-heating is excluded, but only for that machine; ensuing damage to other insured property from an insured peril is covered. Test and maintenance records help show what failed first and what burned afterwards.
- Compliance upgrades. The template pays extra reinstatement cost forced by municipal or statutory rules, but not where you had received notice to comply before the loss. An unanswered fire department notice can cost you the upgrade.
- False or withheld documents. The insurer can refuse the claim and cancel the policy. Reconstructing a record after the loss and presenting it as contemporaneous is the single worst move.
- Time limits. The claim form is due at the earliest opportunity and within 30 days of first noticing the loss. The insurer is not liable after 12 months from the loss unless the claim is in pending action or arbitration.
What should you do in the first 72 hours?
- Notify the insurer immediately and state the policy number, the events and any police or authority report.
- Report to the fire brigade and the police. The template expects this for fire and explosion.
- Take reasonable steps to stop further loss. Isolate supplies, move undamaged stock, cover openings.
- Do not sell, wash, clean out or remove damaged items, and do not repair, until the insurer has inspected, unless the work is urgent and you cannot reach the insurer.
- Photograph everything, with the flood line or char pattern in frame, and note the time supplies were cut.
- For flood, treat submerged panels, motors and cables as unsafe. Under CEA 2023 regulation 31, electrical installation work must be done by a licensed contractor, and regulation 33 requires testing before supply is recommenced after a disconnection of six months. A flooded installation should be tested whatever the period, so have a licensed electrical contractor do it before anything is re-energised.
- Pull the file: approvals, drawings, test reports and logs, with copies stored somewhere the fire did not reach.
How do you build the file before you need it?
Treat the MEP file as part of the asset. Ask for it at handover: approved drawings, as-built drawings, the test certificates signed by the licensed contractor, equipment data sheets and the warranty terms. Add a one-page modification register that records every change to load, layout or occupancy with a date. Keep fire system test records and electrical inspection reports in the same folder, and hold a scanned copy offsite. CEA 2023 regulation 32 caps the interval between periodic inspections at five years, as directed by the state, and makes the owner responsible for keeping installations free from danger, so the inspection reports will exist if you keep up the cycle. If your insurer has a risk-improvement survey, keep its recommendations and your replies with the file.
How Secured Engineers helps
We design electrical, fire fighting, HVAC and plumbing in-house and carry them under one MEPF contract. Fire NOC, CEIG and DISCOM net-metering files are prepared by our own team, so the approval letters and test reports are produced as part of the job and handed over in an indexed file. We work from offices in Noida (Delhi NCR) and Ludhiana, across 535+ projects in 18+ states, with 89.77% repeat clients. We do not sell insurance surveys or audits, and we cannot tell you what an insurer will admit.
If you hold as-built drawings and a bill of quantities, send them and we will review whether the documents describe the installation completely enough to support a claim, and list what is missing. Start from the MEPF contracting page, use the MEPF cost calculator for a first budget, then reach us on WhatsApp, call +91 70099 85817, or ask for a free proposal.
Frequently asked
How long does an insurer have to settle a fire claim?
Under regulation 15 of IRDAI's 2017 regulations, the surveyor's final report is due within 30 days of appointment, or 90 days for commercial and large risks. The insurer must then offer settlement or give written reasons for rejection within 30 days of the final report or the last necessary document. If it is late, interest at 2% above bank rate runs from the date of the last document. Confirm the current text with your insurer.
Will a lapsed Fire NOC cancel my claim?
The IRDAI micro-enterprise template does not list a lapsed NOC as an exclusion, and we have not seen a rule that cancels a claim for it alone. But the insurer can ask why the building was not compliant, and it does not pay compliance upgrades you were already notified about. Renew the NOC on time and keep the renewal in the file. For your own policy, ask the broker which conditions apply.
Can I repair or clean up before the surveyor visits?
Not beyond what is urgent. The IRDAI template tells you to take all reasonable steps to prevent further loss, but not to sell, wash, clean out or remove damaged items, or carry out repairs, until the insurer has inspected, unless the work is urgent and you cannot contact it. Photograph the scene first, keep the damaged parts and ask the insurer in writing when it will inspect.
Is flood damage to MEP equipment covered?
In the IRDAI micro-enterprise template, storm, cyclone, flood and inundation are insured events, subject to the sum insured, excess and exclusions. Damage to an electrical machine from short-circuit, arcing or self-heating is excluded for that machine, even if the cause was lightning. Larger industrial policies use their own wording, so check whether flood is included, the excess, and whether stock in cold storage is covered for temperature change.
What if the surveyor asks for documents I do not have?
The regulation says the insurer or surveyor must inform you in writing if missing particulars will delay assessment, and must guide you on what to submit. They must not ask for irrelevant documents, and should obtain public-authority records themselves. You can reconstruct copies from the contractor, the OEM or the DISCOM, but label them as copies obtained after the loss. Never present a document created now as if it dated from before.
Related services
Related guides
- The Future of MEP Engineering: 5 Technologies to Watch
- The Chiller Gave Three Weeks of Warning Before It Failed. Nobody Was Listening.
- The Site Is Insured. The Chiller That Failed on Test Is Probably Not.
- You Paid for 4,200 Metres of Cable. The Drawings Account for 3,600.
- Supplying a PSU? Your Invoice Now Has to Go on TReDS.
- MEP Design for Government and PSU Tenders: Specifications, Approvals and Documentation
Related on this site
- termWet Riser
- termMEPF
- termEPC
- serviceFire Extinguishers & Portables (Fire Protection)
- serviceAccess Control & Boom Barriers (Low Voltage / ELV)
- calculatorFactory Downtime Cost Calculator
- calculatorMEPF Cost Calculator
- buyer's guideHow to Select a Fire Protection Contractor
- guideCTE/CTO pollution consent
- guideEnvironmental clearance (EIA 2006)
More on Project Delivery & Commercial · all insights