Skip to content
Secured Engineers Pvt. Ltd. logo
Home
Company Insights Resources About Founder — Er. Ankur Kaplesh
Services Mechanical / HVACElectricalPlumbingFire ProtectionLow Voltage / ELVSolar EPCDesign & ApprovalsAMC / MaintenanceTurnkey EPCFire NOC AssistanceCEIG Liaison & EnergisationTesting & Commissioning
Industries Manufacturing & IndustrialHealthcare & HospitalsHospitality & HotelsWarehousing & LogisticsGovernment & DefenceEducation & InstitutionsData CentrePharmaceutical & CleanroomCold StorageTextile & ApparelAutomobile & Auto-ComponentsFood Processing & FMCGChemical & Process Industries
Free Tools ★ Architect & Design Resource Hub All 29 calculators Solar Savings Calculator Fire Water Tank Calculator Fire Pump Room Calculator AC Tonnage Calculator DG Set Sizing Calculator MEPF Cost Estimator
Projects Work With Us Get a Free Quote

Last reviewed · Reviewed for CEIG process, inspectorate office and portal, DISCOM interface Authority names, portals, fees and timelines change with state notifications; confirm the live position with the authority before relying on it.

CEIG approval in Delhi

Delhi is the one jurisdiction in the region where the electrical inspectorate is not where you expect it. In Punjab it sits under Power; in Uttar Pradesh under Energy; in Delhi the Electrical Inspectorate sits under the Labour Department, Government of NCT of Delhi. Teams that go looking for it in an energy department lose a week before they have filed anything.

This page covers what is specific to Delhi. The multi-state CEIG guide covers the drawing content, testing and defect list common to every state.

Who issues it, and under what law

Delhi (NCT)
Issuing authorityElectrical Inspectorate, Labour Department, GNCTD
Statutory basisElectricity Act, 2003 (Electrical Inspector appointed under Section 162); safety under the CEA (Measures relating to Safety and Electric Supply) Regulations, 2023
Also administersBombay Lifts Act, 1939, as extended to the NCT of Delhi
Departmental sitelabour.delhi.gov.in — Electrical Inspectorate section
DISCOMsBRPL · BYPL · TPDDL, by zone
Industrial estate coordinationDSIIDC

Lifts and electrical approval share one office

This is the practical quirk worth planning around. Because the Bombay Lifts Act as extended to Delhi is administered by the same inspectorate, a commercial building’s lift approvals and its electrical installation approval run through one department.

On a fit-out or a new commercial building that is an advantage if you sequence it deliberately — one relationship, one set of submissions, one queue to understand. It becomes a problem when the lift package is procured late and its approval arrives behind an occupancy date that was set assuming only the electrical file mattered.

The three-DISCOM split

Delhi has no single utility. BRPL and BYPL cover the BSES areas; TPDDL covers north and north-west Delhi. The inspectorate process is the same across the city, but the sanction, metering and energisation counterparty is determined by the site address.

This is the narrow version of a much wider NCR problem. Cross a boundary and the state, the building authority and the utility all change at once — Noida and Greater Noida under NOIDA/GNIDA with PVVNL or NPCL, Ghaziabad under UP, Gurugram and Faridabad under Haryana with DHBVN. We set that out in full in the Delhi NCR approvals authority maze, and the governing rule is simple: timelines are not transferable between NCR jurisdictions.

Where CEIG sits in your programme

  1. DISCOM sanction first — from BRPL, BYPL or TPDDL by zone.
  2. Drawing approval — before the substation is built.
  3. Installation and testing by a licensed electrical contractor, records kept as you go.
  4. Inspection and clearance against the approved drawings.
  5. Energisation by the DISCOM.
  6. Periodic inspection thereafter.

What actually stalls a Delhi file

The same documentary failures that stall files everywhere:

  • A single-line diagram carrying connectivity but no protection ratings or settings — discrimination cannot be assessed, so the file cannot clear.
  • Earthing presented as a note rather than a design, with no pit-by-pit measured values at test stage.
  • Drawings that do not match the DISCOM sanction.
  • An installation that has moved past its approved drawings, since inspection is against what exists on site.

Our guide on what gets checked on DG sets covers the integration scrutiny in detail.

What we do

We prepare and file the submission, carry queries with the inspectorate, keep test records inspection-ready, and sequence the DISCOM interface — plus the lift approval where the building needs one — under CEIG liaison and energisation support. The CEIG readiness checker runs the pre-filing list.

Building or fitting out in Delhi? Book a Free Project Blueprint & Statutory Approvals Roadmap or call +91 70099 85817. See also Fire NOC for factories in Delhi and our Delhi NCR MEP coverage.

Authority names, portals and processes are current as of publication and can change with notifications — confirm the live position with the Labour Department, GNCTD. Not legal advice.

Frequently asked questions

Who issues CEIG approval in Delhi?

The Electrical Inspectorate of the Labour Department, Government of NCT of Delhi. This is the detail that catches most owners out — in almost every other state the inspectorate sits under the Energy or Power department, but in Delhi it sits under Labour.

What does the Delhi Electrical Inspectorate enforce?

It enforces the safety laws applying to electrical installations under the Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations, 2023, and it also administers the Bombay Lifts Act, 1939 as extended to the National Capital Territory of Delhi — so lift approvals sit with the same office as your HT installation.

Which DISCOM energises my Delhi installation?

Delhi is served by three DISCOMs by zone — BRPL and BYPL in the BSES areas and TPDDL in north and north-west Delhi. Which one applies is determined by the site address, and it affects the sanction and energisation rather than the inspectorate process itself.

Do lifts need approval from the same office in Delhi?

Yes. Because the Bombay Lifts Act, 1939 as extended to Delhi is administered by the same Electrical Inspectorate, lift installation approval and your electrical installation approval run through one department. On a commercial building this is worth sequencing deliberately rather than discovering late.

Is CEIG approval needed for a Delhi factory or commercial building?

Installations taking high-tension supply, or installing substations and transformers, fall within the inspectorate ambit and require approval before energisation. Whether a specific installation is in scope depends on voltage and current thresholds — settle it at design stage rather than after the substation is built.

How does the Delhi process differ from Noida or Gurugram?

Entirely, because the state changes. Delhi runs through the Labour Department inspectorate with BRPL, BYPL or TPDDL supply; Noida and Greater Noida run through the UP Directorate of Electrical Safety with PVVNL or NPCL; Gurugram runs through the Haryana inspectorate with DHBVN. Same NCR, three different approval paths.

Sources and standards

  • Electricity Act 2003 (2003, as amended) — The Electricity Act, 2003. Government of India, Ministry of Power. Publisher.The statutory framework for generation, distribution, licensing and the Electrical Inspector's role (Section 162).
  • CEA (Measures relating to Safety and Electric Supply) Regulations (2023 (superseding the 2010 regulations)) — Central Electricity Authority (Measures relating to Safety and Electric Supply) Regulations. Central Electricity Authority. Publisher.Safety requirements for electrical installations, inspection of HT installations before energisation, periodic inspection, earthing and protection.
  • IS 3043 (2018) — IS 3043 — Code of Practice for Earthing. Bureau of Indian Standards. Publisher.Earthing system design, electrodes, resistance values and testing.
  • Chief Electrical Inspector to Government (state) — Office of the Chief Electrical Inspector to Government — state electrical inspectorates. State governments. Drawing approval, inspection and energisation clearance under the Electricity Act and the CEA safety regulations; process and portal differ by state.

Standards are cited to support the technical statements on this page. Where a standard has been revised, the edition shown is the one verified at the time of review; the edition in force for a project is the one the authority applies.

Need help with CEIG Approval in Delhi?

Tell us about your project — our engineers respond within one business day.

  • ★ 4.7 (230 Google reviews)
  • 535+ projects
  • ISO 9001:2015 Certified
  • Reply in 1 business day

🔒 Your details go straight to our team. No spam, ever.

Planning a factory or expansion in North India?

We map every approval your project needs — in order, with the critical path — and take them end to end. Design, approvals, execution: one accountable partner.