CEIG Approval for Lifts: Lift Inspector Rules for Industrial and Commercial Buildings
There is no single national lift approval. A lift is approved under the lift act of the state it stands in, usually administered by the state electrical inspectorate, while its electrical supply falls under the CEA 2023 safety regulations. The owner must obtain permission before and after installation, and then keep the lift registered, inspected and maintained by a licensed company.
Which law and which office approve a lift?
The National Building Code of India 2016 (Part 8 Section 5A) says lift installations are to conform to the lift acts and rules wherever they are in force. It makes the owner of the premises responsible for obtaining permission from the authority before and after installation and for subsequent operation, and it says that a licence for public use is a safety provision issued by state authorities under those acts. So the first task is to find your state's act and office.
| State | Law and office, as far as confirmed | What to confirm before filing |
|---|---|---|
| Haryana | Haryana Lifts and Escalators Act, 2008, with a Chief Inspector Lifts and Escalators in the Chief Electrical Inspector's department; online registration and inspection | Current rules, forms and fee schedule |
| Delhi | The Bombay Lifts Act, 1939 as extended to Delhi, administered by the Electrical Inspectorate of the Labour Department, so lift and electrical approvals sit in one office (as recorded on our Delhi CEIG page) | E-district service names, timelines and documents |
| Uttar Pradesh | The Uttar Pradesh Lifts and Escalators Act, 2024 is listed on India Code; registration is reported to run through the Directorate of Electrical Safety | The notified rules, the registration portal and the completion-report forms |
| Punjab and other states | Not confirmed from a primary source for this article | Whether a state lift act is in force, which office administers it, and what it requires |
See our state pages for the electrical side: Haryana, Delhi, Uttar Pradesh and Punjab.
What does a state lift act ask of an owner? Haryana as an example
Haryana's 2008 Act is a short, readable statute, and it shows the shape of a typical regime. The owner must apply for registration within one month after the erection of a lift is completed, and the Inspector registers the lift by assigning a number within thirty days of a complete application. Every year the owner must submit a copy of the annual maintenance contract and an annual safety certificate. Section 5 requires an automatic rescue device that brings a stranded lift to the nearest landing and opens the doors, and section 6 requires an alternative automatic power supply so the lift functions within ten seconds of a supply failure. Section 7 says every registered lift is inspected once in three years. Accidents are to be reported, and the lift is not to run until the Inspector permits.
The Chief Electrical Inspector's procedure note gives the filing path and the checklist.
| Document in the Haryana checklist | Who provides it |
|---|---|
| Copy of the bill or invoice of the lift | Owner, from the supplier |
| Declaration by owner (Form A) | Owner |
| Declaration by company (Form B) | Lift company |
| Declaration by electrical contractor (Form C) | Electrical contractor |
| Insurance certificate covering persons using the lift or escalator | Owner |
| Annual maintenance contract | Owner and maintenance company |
| Safety certificate by installer or company | Installer |
| Fee, paid by treasury challan (new and periodical amounts are in the note) | Owner |
After the application the portal allocates an Inspector, and after inspection the applicant downloads the report. Other states differ in forms and intervals; treat this as a model of what to prepare, not a statement of their rules.
Where does CEIG come in?
Two separate approvals can apply to one lift. The lift act covers the machine. The CEA (Measures relating to Safety and Electric Supply) Regulations, 2023 cover the electricity that feeds it, and they apply to the building's whole installation.
- Licensed contractor. Regulation 31 requires installation work, including additions, to be done by an electrical contractor licensed by the State Government under supervision of a certificate holder. Haryana's lift checklist asks for a declaration from the electrical contractor.
- Tall buildings. Regulation 38 applies to multi-storeyed buildings above fifteen metres in height. The connected load and voltage above which the Electrical Inspector inspects are notified by the state, and the regulation asks for a main isolating device, fire-retardant low-smoke low-halogen cables, bus bar trunking for distribution to floors and lightning protection to relevant standards.
- Earthing and approval. Regulation 43 covers earthing of apparatus and regulation 45 covers approval or self-certification of the installation. A lift machine room and its panel are part of that installation.
- Standby supply. If a DG set feeds the lift, its approval is its own file; see what the inspector checks on DG sets.
The practical lesson is sequence. Where one office handles both, as in Delhi and Haryana, plan the lift file and the electrical file together. Where the lift package is bought late, its approval arrives behind an occupancy date set only on the electrical file.
What does the fireman's lift add?
For high-rise buildings, 15 m and above under NBC 2016, the code expects at least one fireman's lift per building, per wing and per bank of lifts, with more where a tall building is zoned. NBC Part 8 Section 5A gives its features: a fireman's switch at the evacuation floor, an audio and visual signal in the car, a floor area of at least 1.43 square metres and a loading capacity of at least 544 kg (an eight-person lift), power-operated doors at least 0.8 m wide, a speed of at least 1.0 m/s so that the top floor is reached from the main floor within one minute, a reliable alternative source of power through a changeover with fire-safe wiring, and a sloped lobby floor to keep firefighting water out of the shaft. Its own Phase I and Phase II controls bring the lift to the evacuation floor and put it under firefighter control. These features are design inputs, so the lift specification must carry them before the order. For the wider fire design of tall buildings, see high-rise pressure zoning and fire fighting systems.
What happens after approval?
The NBC adds duties that last the life of the lift. Lifts are to be examined at regular intervals set by the state lift acts by a competent person, and accidents are to be reported to the authority under the rules. Statutory examinations are not a substitute for servicing. The maintenance company should hold a valid licence, with qualified staff. Our note on lift and escalator AMC and liability covers contract terms, and AMC and maintenance describes ours.
How Secured Engineers helps
Secured Engineers files Fire NOC, CEIG and DISCOM net-metering applications in-house, and designs electrical systems in-house. Our CEIG liaison scope covers sequencing the lift approval alongside the electrical file where the building needs one. MEPF and solar can sit under one contract. The company works from offices in Noida (Delhi NCR) and Ludhiana, with 535+ projects across 18+ states and 89.77% repeat clients.
If you have a lift or electrical file in hand, we can review it before it is filed. Start from our CEIG approval consultancy, send the documents on WhatsApp, call +91 70099 85817, or ask for a free proposal. The CEIG readiness calculator runs the pre-filing list.
Frequently asked
Does a lift need CEIG approval?
A lift is regulated mainly under the lift act of the state, and in many states the same electrical inspectorate administers it, so the answer is usually yes in effect, but under a separate permission from the electrical installation approval. Separately, the lift's power supply is part of the building's electrical installation under the CEA 2023 safety regulations. Check which office, forms and sequence your state uses before the lift order is placed.
Who must obtain the permission for a lift?
The owner of the premises. The National Building Code 2016, Part 8 Section 5A says it is the owner's responsibility to obtain the necessary permission from the authority before and after installation and for subsequent operation, and that a licence for public use, where the state's lift act requires one, must be obtained. In practice the lift supplier prepares forms, but the owner carries the legal duty.
How often is a lift inspected?
It depends on the state. In Haryana, section 7 of the 2008 Act says every registered lift is inspected once in three years by the Inspector or an authorised agency, and owners must also submit the annual maintenance contract and an annual safety certificate every year. The National Building Code notes that statutory examinations are done at intervals set by the state lift acts. Confirm your state's interval and who may examine.
What must a lift do if the power fails?
Haryana's Act requires an automatic rescue device that brings the lift to the nearest landing and opens the doors, and an alternative automatic power supply so the lift functions within ten seconds of a supply failure. For a fireman's lift the National Building Code asks for a reliable alternative source of power through a manual or automatic changeover, with wiring routed to stay safe from fire.
Does the lift maintenance company need a licence?
The National Building Code says the company entrusted with the maintenance contract should hold a valid licence to maintain lifts, and that its staff should be qualified and experienced as the lift acts require. State rules decide the licence category and who issues it. Ask for the licence before signing the contract, and check that its scope covers the type of lift installed.
Related services
Related guides
- Addressable Lighting Control Pays in Some Buildings and Not in Others.
- The Thresholds Moved. Your Factory May Have Changed Category Without Doing Anything.
- Your Shopfloor Is Probably Lit Wrong in Both Directions at Once
- The MSME Act Just Changed. Here Is What It Means for a Factory Owner.
- DG Set Sizing for a Factory: Starting Loads, Harmonics and the Solar Interaction
- Documents Required for CEIG Approval: The Complete Checklist
Related on this site
- termCEIG Approval
- termLT vs HT Distribution
- termContract Demand
- serviceCabling, Cable Trays & Bus Ducts (Electrical)
- serviceEarthing & Lightning Protection (Electrical)
- calculatorFactory Electrical Capacity Calculator
- calculatorCeig Readiness Calculator
- buyer's guideHow to Select an MEP Contractor
- guideCTE/CTO pollution consent
- guideEnvironmental clearance (EIA 2006)
More on Electrical & Power · all insights