Skip to content
Secured Engineers Pvt. Ltd. logo
Home
Company Insights Resources Locations & project coverage About Founder — Er. Ankur Kaplesh TEDx talk, books & interviews
Services Mechanical / HVACElectricalPlumbingFire ProtectionLow Voltage / ELVSolar EPCMEP Consultancy & ApprovalsAMC / MaintenanceTurnkey EPCFire NOC AssistanceCEIG Liaison & EnergisationTesting & Commissioning AI Video Analytics
Industries Manufacturing & IndustrialHealthcare & HospitalsHospitality & HotelsWarehousing & LogisticsGovernment & DefenceEducation & InstitutionsData CentrePharmaceutical & CleanroomCold StorageTextile & ApparelAutomobile & Auto-ComponentsFood Processing & FMCGChemical & Process Industries
Free Tools ★ Architect & Design Resource Hub All 56 calculators Solar Financial Calculator Fire Water Storage Checker Fire Pump Room Calculator AC Tonnage Calculator DG Load Calculator MEPF Budget Calculator
Projects Work With Us Submit RFQ Get a Free Quote

Ventilation, stair pressurisation and exhaust contractor and consultant —code-compliant mechanical ventilation

Fresh-air systems, NBC staircase pressurisation, basement and car-park ventilation with CO sensing, kitchen/toilet exhaust and jet-fan systems.

Enquire: Ventilation, Pressurisation & Exhaust

Step 1 of 3

What do you need?
What kind of facility?
Roughly how big is the project?
Where should our engineer call you?

No forms to chase — an engineer calls you back. We never share your number.

Plan this system

Can one ventilation rate decide a smoke-control system?

No. Normal ventilation and fire-mode smoke control serve different purposes. The design must state the occupancy, contaminants or smoke scenario, replacement-air path and control sequence before fan duties can be selected.

Inputs to prepare
Room uses and pollutant sources; door and shaft layouts; agreed fire strategy; discharge locations; make-up-air routes.
Acceptance evidence to agree
Test the agreed operating scenarios with the relevant doors, dampers and fire-alarm interfaces in place, recording the measured results.
Scope to clarify before comparing bids
Define normal and emergency modes separately. Fan delivery alone does not demonstrate smoke control or staircase pressurisation.

Use this checklist to define the brief. Final selections and acceptance criteria depend on the site, applicable requirements and approved project design.

In one paragraph

Ventilation, Pressurisation & Exhaust by Secured Engineers Pvt. Ltd.

Secured Engineers Pvt. Ltd. — an MEPF & solar EPC contractor and consultant with offices in Ludhiana, Punjab and Noida (Delhi NCR) — provides Ventilation, Pressurisation & Exhaust as part of its Mechanical / HVAC scope: Fresh-air systems, NBC staircase pressurisation, basement and car-park ventilation with CO sensing, kitchen/toilet exhaust and jet-fan systems. 535+ projects across 18+ Indian states.

Enquiries: +91 70099 85817 · sales@securedengineers.com · request a project proposal

Why it matters

What this system decides for your project

Ventilation is a life-safety and statutory requirement, not an option. Correct stair pressurisation and car-park smoke management are checked at Fire-NOC and keep occupants safe.

You need a quote for this if: High-rises, basements, commercial kitchens and industrial sheds needing code-compliant ventilation.

Scope

Scope of work

Ventilation is designed to the air-change rates and pressure differentials the code and the use require — fresh air for occupancy, staircase and lift-lobby pressurisation for smoke control under NBC 2016, car-park ventilation with CO sensing and a smoke-mode of operation, kitchen exhaust with grease handling, toilet exhaust, and jet-fan or ducted systems for basements. We select the fans, design the ducts and louvres, and specify the sensors and controls that switch between normal and fire modes.

How it is delivered — and what you receive

Pressurisation and car-park smoke systems are tested with the doors, dampers and fire-alarm interface in place, because they are checked at the fire inspection as a cause-and-effect — a fan that runs is not the same as a stair that holds pressure with the design number of doors open. Readings are recorded against the design values and the test forms part of the Fire NOC submission. The client receives the test reports, the control logic and the damper schedule.

Sources and standards

  • NBC 2016 Part 8 (2016) — National Building Code of India 2016, Part 8 — Building Services. Bureau of Indian Standards. Publisher. Lighting, ventilation, air-conditioning, electrical installations, lifts and escalators — the building-services framework.

Standards are cited to support the technical statements on this page. Where a standard has been revised, the edition shown is the one verified at the time of review; the edition in force for a project is the one the authority applies.

Before you ask us to quote: the Mechanical / HVAC buyer's guide lists what to have ready, what drives cost and timeline, and the approvals that usually apply. Writing the tender? The hvac & mechanical specification library has 4 code-referenced clauses architects and consultants can drop into tender documents.

Before you award

Hiring a ventilation, pressurisation & exhaust contractor — what to check

Industrial ventilation is bought in two very different forms and the terms get used interchangeably, which is how factories end up with the wrong one. General ventilation dilutes the whole shop. Local exhaust captures the contaminant at the source. A fume problem solved with more air changes is usually a fume problem moved, not solved.

  • Capture velocity at the hood, not air changes in the shed. For fume, dust or solvent extraction the number that matters is the velocity at the point of capture and the hood geometry that achieves it. Air changes per hour is the wrong specification for a source-capture problem.
  • Make-up air, costed honestly. Every cubic metre extracted has to be replaced. A system designed without tempered make-up air either starves, pulls the shed into depression, or drags your heating and cooling cost up. It is the most commonly omitted line in a cheap quote.
  • What the pollution board consent requires. Stack height, monitoring provision and any scrubber or filtration are conditions of your consent, not optional refinements. The design has to be the consent's design.
  • Balancing and the report. Measured airflows at each hood and outlet against the design, issued as a balancing report. Without it nobody can say whether the system works.
Approved makes

Makes we specify for Ventilation, Pressurisation & Exhaust

Tier-1 manufacturers whose equipment we design around and install. The specification names the make; the site is held to it.

Systemair Kruger Nicotra Greenheck Flakt

Need Ventilation, Pressurisation & Exhaust for your project?

Get a free consultation and quote. We design, prepare and file your approvals, and execute — you deal with one team.

ONE PARTNER. END TO END. You focus on your business — we handle the rest.
Quality Safety Commitment
Speak to a Lead Engineer