AHU, FCU and ducting contractor and consultant —air-handling units and air distribution
Double-skin air-handling and fan-coil units with SMACNA-class GI/aluminium ducting, VAV/CAV terminals, diffusers, dampers and filtration.
Enquire: AHUs, FCUs & Air Distribution
Step 1 of 3
Your request is in
One of our engineers will call you shortly.
What determines an AHU or FCU selection?
An AHU or FCU selection needs both the thermal duty and the air-side duty. Airflow, external static pressure, filtration, fresh-air treatment, noise and maintenance access must match the spaces served.
- Inputs to prepare
- Room airflow schedule; cooling-coil duty and water temperatures; filter requirements; duct routes; ceiling space and service access.
- Acceptance evidence to agree
- Ask for equipment selections and an outlet-by-outlet balancing report against the design airflow schedule.
- Scope to clarify before comparing bids
- Confirm whether ductwork, insulation, fire dampers, controls, fresh-air treatment and testing are included alongside the units.
Use this checklist to define the brief. Final selections and acceptance criteria depend on the site, applicable requirements and approved project design.
AHUs, FCUs & Air Distribution by Secured Engineers Pvt. Ltd.
Secured Engineers Pvt. Ltd. — an MEPF & solar EPC contractor and consultant with offices in Ludhiana, Punjab and Noida (Delhi NCR) — provides AHUs, FCUs & Air Distribution as part of its Mechanical / HVAC scope: Double-skin air-handling and fan-coil units with SMACNA-class GI/aluminium ducting, VAV/CAV terminals, diffusers, dampers and filtration. 535+ projects across 18+ Indian states.
Enquiries: +91 70099 85817 · sales@securedengineers.com · request a project proposal
What this system decides for your project
Air distribution decides whether designed cooling actually reaches people. Leak-tested ducting and correct CFM/throw protect both energy efficiency and indoor air quality.
You need a quote for this if: Any project needing ducted air, fresh-air ventilation or cleanroom-grade distribution.
Scope of work
The air side is designed from the room-by-room supply-air quantities — CFM, throw, fresh-air fraction and filtration grade — into AHU and FCU selections, duct routes sized for static pressure and velocity, and the terminals: VAV or CAV boxes, diffusers, grilles, volume-control dampers and fire dampers at every compartment crossing. Filtration runs from G4 pre-filters to HEPA where the space needs it. We fabricate the GI or aluminium ductwork to SMACNA practice, and supply and install the AHUs, FCUs, ducts, insulation, terminals and airflow stations.
How it is delivered — and what you receive
Duct routes are coordinated against cable trays, sprinkler mains and beams before fabrication, because the ceiling void is the most contested space on any project. Ductwork is leak-tested in sections and insulated, and the system is balanced outlet by outlet — testing, adjusting and balancing — so the designed air actually reaches each room. Fire dampers are tested and their positions recorded on the Fire NOC drawing. The client receives the balancing report, the duct as-built and the filter schedule.
Sources and standards
- NBC 2016 Part 8 (2016) — National Building Code of India 2016, Part 8 — Building Services. Bureau of Indian Standards. Publisher. Lighting, ventilation, air-conditioning, electrical installations, lifts and escalators — the building-services framework.
Standards are cited to support the technical statements on this page. Where a standard has been revised, the edition shown is the one verified at the time of review; the edition in force for a project is the one the authority applies.
Before you ask us to quote: the Mechanical / HVAC buyer's guide lists what to have ready, what drives cost and timeline, and the approvals that usually apply. Writing the tender? The hvac & mechanical specification library has 4 code-referenced clauses architects and consultants can drop into tender documents.
Makes we specify for AHUs, FCUs & Air Distribution
Tier-1 manufacturers whose equipment we design around and install. The specification names the make; the site is held to it.
Related to AHUs, FCUs & Air Distribution
The terms behind it
Run the numbers
Read before you specify
Need AHUs, FCUs & Air Distribution for your project?
Get a free consultation and quote. We design, prepare and file your approvals, and execute — you deal with one team.
Guides that reference this page
- AHU Cost for a Factory or Pharma Plant: Specification, Filtration and Cost Drivers
- The Plant Met Spec in 2020. The Spec Assumed Summers North India No Longer Has.
- HVAC Insulation and Condensation: What to Check During a Renovation
- Is Your HVAC Costing You More Than It Should?
- MEPF for WHO-GMP Pharma: The Audit Is Won in the Services Design
- Cold room design in East Africa: what really drives the cost