Skip to content
Secured Engineers Pvt. Ltd. logo
Home
Company Insights Resources Locations & project coverage About Founder — Er. Ankur Kaplesh
Services Mechanical / HVACElectricalPlumbingFire ProtectionLow Voltage / ELVSolar EPCDesign & ApprovalsAMC / MaintenanceTurnkey EPCFire NOC AssistanceCEIG Liaison & EnergisationTesting & Commissioning AI Video Analytics
Industries Manufacturing & IndustrialHealthcare & HospitalsHospitality & HotelsWarehousing & LogisticsGovernment & DefenceEducation & InstitutionsData CentrePharmaceutical & CleanroomCold StorageTextile & ApparelAutomobile & Auto-ComponentsFood Processing & FMCGChemical & Process Industries
Free Tools ★ Architect & Design Resource Hub All 56 calculators Solar Financial Calculator Fire Water Storage Checker Fire Pump Room Calculator AC Tonnage Calculator DG Load Calculator MEPF Budget Calculator
Projects Work With Us Get a Free Quote
Electrical · Ludhiana

Industrial electrical contractor in Ludhiana — HT/LT substations, panels, DG and the CEIG filing

We are an industrial electrical contractor for Ludhiana, working from our registered head office in the city: HT/LT distribution and substations, transformers and DG sets, PCC, MCC and APFC panels, cabling and bus ducts, earthing and lightning protection — from the load study and single-line diagram through installation, testing and the inspectorate's approval.

Size the backup first with the DG sizing calculator →

15+ years · 535+ projects · Ludhiana head office

Buying

Choosing among electrical contractors in Ludhiana — what to compare

Quotes look alike until you ask how the work is done. Ask every bidder:

  • Is the transformer sized from a load study with diversity, or from the connected load?
  • Are cables sized on derating for the actual tray fill and ambient, with the calculation shown?
  • Will the earthing be tested pit by pit, with the resistance records handed over for the inspection?
  • Who draws the single-line diagram the inspectorate will stamp — and who attends the inspection?
  • Are relay settings and discrimination calculated, tested by secondary injection and recorded?

The full procurement checklist is in how to select an industrial electrical contractor.

Approvals

Where the electrical scope meets the approvals in Ludhiana

An HT installation, a substation or a DG set cannot be energised in Punjab until the Chief Electrical Inspector to Government of Punjab has inspected it; the DISCOM sanctions the load, and the DG set's acoustic enclosure and stack sit inside the PPCB (Punjab Pollution Control Board) consent. We run the three in parallel so energisation is not waiting on paperwork.

The step-by-step is on CEIG approval in Punjab, with what the inspectorate checks on DG sets and the CEIG readiness checklist.

Where we work

Electrical contractor for Ludhiana's industrial estates

One team covers the estates; the DISCOM, the feeder and the site conditions change by estate. Each estate page carries the authority, the DISCOM and the questions its units ask us.

Tell us about your project

An engineer reviews every enquiry — not a call centre. The more you can tell us about scope and stage, the more useful our first reply will be.

FAQ

Electrical work in Ludhiana — straight answers

Which authority inspects an HT installation in Ludhiana?

The Chief Electrical Inspector to Government of Punjab. HT installations, substations and DG sets are inspected before energisation; we prepare the single-line diagram, the test records and the filing, and attend the inspection.

Who sanctions the power connection for a Ludhiana factory?

PSPCL (Punjab State Power Corporation Limited), the sole DISCOM for all of Punjab. PSPCL's FAQ gives LT supply up to 100 kVA of demand and HT above it; we prepare the load application and the sanction documents either way.

Do you handle the CEIG filing as part of the electrical contract?

Yes. The drawings, the test records (insulation, earth resistance by pit, relay injection, transformer and DG tests) and the inspectorate submission are part of the scope, so energisation is not waiting on paperwork.

Is your office in Ludhiana?

Yes. Our registered head office is at 2480/1, Gill Rd, near Grewal Hospital, Janta Nagar, Ludhiana, Punjab 141003; our corporate office is in Noida.

Do you maintain the electrical installation after handover?

Yes, under an annual maintenance contract covering the substation, panels, DG and earthing alongside the fire, HVAC and solar systems, with preventive schedules and defined response times.

Put an electrical engineer on your project

Send the connected load, the single-line diagram if you have one and the site location. We will come back with the supply option, the inspectorate route and what the scope should include.

ONE PARTNER. END TO END. You focus on your business — we handle the rest.
Quality Safety Commitment
Speak to a Lead Engineer