Skip to content
Secured Engineers Pvt. Ltd. logo
Home
Company Insights Resources About Founder — Er. Ankur Kaplesh
Services Mechanical / HVACElectricalPlumbingFire ProtectionLow Voltage / ELVSolar EPCDesign & ApprovalsAMC / MaintenanceTurnkey EPCFire NOC AssistanceCEIG Liaison & EnergisationTesting & CommissioningIndustrial Audits
Industries Manufacturing & IndustrialHealthcare & HospitalsHospitality & HotelsWarehousing & LogisticsGovernment & DefenceEducation & InstitutionsData CentrePharmaceutical & CleanroomCold StorageTextile & ApparelAutomobile & Auto-ComponentsFood Processing & FMCGChemical & Process Industries
Free Tools ★ Architect & Design Resource Hub All 29 calculators Solar Savings Calculator Fire Water Tank Calculator Fire Pump Room Calculator AC Tonnage Calculator DG Set Sizing Calculator MEPF Cost Estimator
Projects Work With Us Get a Free Quote
HVAC

Cooling Load

Cooling load is the computed rate at which a space gains heat — solar gain through the envelope, occupants, lighting, equipment and fresh-air conditioning — expressed in kW or TR; every honest HVAC selection starts from it.

Why it matters on an MEPF project

Load calculation is where HVAC is engineered or faked. Room-wise computation with real orientation, glass, occupancy and equipment produces a defensible plant size and duct schedule; ₹-per-sq.ft folklore produces oversized plant that short-cycles and dehumidifies badly, or undersized plant that never holds setpoint in May. Both errors are permanent.

The split matters as much as the total: sensible vs latent load drives coil selection (a Delhi monsoon room fails on latent even when sensible is covered), and the peak-vs-diversified distinction sizes central plant sanely — every room peaks, but not together.

How it's specified in practice

Load components — Cooling Load
ParameterTypical / working positionGoverning reference
Envelope & solarOrientation, glass area/type, shading — often dominant in officesload-calc methodology
Internal gainsPeople, lighting W/m², equipment W/m²design assumptions (declared)
Fresh airVentilation air conditioned from ambient — heavy in Indian summersNBC 2016 Part 8 rates
Sensible/latent splitDrives coil ADP selection; monsoon punishes latent shortcutspsychrometric design

Common mistakes

  • Thumb-rule tonnage with no calculation on file.
  • Ignoring fresh-air load, then wondering why capacity vanished in June.
  • Sizing central plant to the sum of room peaks with zero diversity.
  • No margin policy — or compounding "safety" margins at every step.

Related on this site

Frequently asked

What information does a proper load calc need?

Drawings with orientation, glass specification, occupancy and equipment schedules, and the design ambient. With those, room-wise loads are arithmetic; without them, everything is a guess wearing software.

How much oversizing is healthy?

A declared, single margin on honest inputs — not stacked fudge factors. Oversized plant cycles, controls poorly and dehumidifies worse; "bigger to be safe" is usually less comfortable.

Standards referenced: NBC 2016 Part 8 (ventilation rates) · ECBC 2017 (envelope context)

Ready to start your project?

Get a free consultation and quote. We design, take all approvals, and execute — you stay stress-free.

ONE PARTNER. END TO END. You focus on your business — we handle the rest.
Quality Safety Commitment
Chat / Get Quote