Plant Room Sizes for a Factory: DG, Transformer, Fire Pump, STP and AHU Rooms
Plant room sizes in a factory come from the equipment, not from the shed's floor area. The National Building Code gives guide areas for substations and DG rooms by capacity, sets conditions for the fire pump house, and expects the STP and AHU rooms to be sized from the vendor's layout. Fix each room's size when the equipment list is fixed, before the architect freezes the plot plan.
What do the codes give for each room?
The table summarises what we could read in the National Building Code of India 2016 (NBC), the CEA safety regulations 2023 and the CPCB noise rules. Where the code gives no area, the table says the vendor's drawing decides.
| Room | What the code gives | What else sets the size |
|---|---|---|
| Transformer room and substation | NBC Part 8 Section 2, Annex C, guide areas by capacity: for one 400 kVA transformer, 16.5 m² for the transformer room and about 93 m² for the whole substation without generators; for two 400 kVA, 33 m² and about 125 m²; for two 1,000 kVA, 39 m² and about 149 m². Equipment top to beam soffit: at least 1,200 mm | HV and MV panel counts, bus couplers and standby transformers (the Annex says redundancy needs added space), cable entry from above, oil quantity |
| DG room | NBC Annex D, additional area for a generator in a substation: about 100 m² and 4.2 m clear under the beam for sets from roughly 250 to 480 kVA, about 120 m² and 6.5 m at around 1,000 kVA. The area covers the day tank, not bulk fuel storage | Cooling air, exhaust route, silencing, derating for site conditions, bulk tank position |
| Fire pump house | NBC Part 4, clause 5.1.2.2: sufficiently large for all pumps, accessories, diesel tank and electrical panel; fire walls all round; 120-minute doors; no other utility equipment inside | Number of pump sets, jockey and diesel pump, tank position and suction levels |
| STP room or yard | No area guide found in the code text we read | Flow, treatment technology and the vendor's general arrangement drawing |
| AHU and chiller plant rooms | NBC Part 8 Section 3, clause 4.3.1: clear headroom of at least 4.5 m for chillers of 500 TR and above and at least 3.6 m for smaller plants | Coil face area, filter pull-out, service clearances, equipment removal route, floor drains |
The Annex figures are stated for general guidance. The NBC says the DG room area and height may finally be fixed according to actual requirements, and that other transformer capacities may change the dimensions slightly. Use them to reserve space on the plot plan, then replace them with the vendor's drawings.
How do you size the DG room?
Start from the load, not the room. The generator size comes from the essential load list; our DG sizing calculator gives a first kVA from that list. Then read the manufacturer's footprint, add service clearances and add the air path: cooling air in, hot air out and an exhaust route to a safe discharge point.
NBC Part 8 Section 2 says an emergency generator should not be installed above the ground floor or below the first basement, that a basement DG room's ceiling should be the ground floor slab, and that a utility building is preferable. In an enclosed room it requires forced ventilation so that the equipment derates as little as possible. It prefers the generator next to the MV switchgear to ease load transfer and keep vibration and noise away from the main building, with a separate direct escape and entry from outside so the electrical supply can be cut in a fire.
Noise is the other design input. CPCB's rules for diesel sets up to 1,000 kVA manufactured after 1 January 2005 set 75 dB(A) at 1 metre from the enclosure, with an integral acoustic enclosure. Where the room is acoustically treated instead, the design is for at least 25 dB(A) insertion loss or the ambient standard, whichever is higher, and the set needs an exhaust muffler of the same loss. The user is asked to bring noise outside the premises within ambient limits by siting and control. State boards regulate this, so check with yours. A bulk diesel tank brings its own safety distances and licence questions, covered in our notes on diesel tank distances and PESO licensing.
What does the transformer room need besides floor area?
Oil and fire. Regulation 46(2) of the CEA regulations requires a fire barrier wall, of the thickness the relevant standards give, between oil-filled apparatus holding more than 2,000 litres of oil and between that apparatus and an adjacent building, unless the building wall is rated for four hours. It requires a suitable oil soakpit, and draining arrangements where more than 9,000 litres of oil sits in one tank or chamber. Spare oil must not be stored near oil-filled equipment. Oil-filled transformers installed indoors in buildings other than residential or commercial ones go on the ground floor or not below the first basement. Cable trenches inside substations are filled with sand or similar non-inflammable material or covered with non-inflammable slabs.
Growth is the usual cause of regret. The NBC suggests allowing for future load, splitting load across more than one transformer and providing for a standby. A room sized for exactly today's transformer has no way to take the second unit. Our note on transformer undersizing covers the cost of finding this out late.
What does the fire pump house need?
NBC Part 4 gives a list. Put the pump house at ground level where possible, directly reachable from outside; if it is below ground, no lower than the second basement, with direct staircase access that does not pass through other occupancies. Separate it by fire walls with 120-minute fire doors, ventilate it, avoid water stagnation, and keep other utility equipment out. Negative suction and submersible pumps are not allowed. It must be large enough for the pumps, valves, pressure reducing valves, the diesel tank and the electrical panel. The static tank must be in two or more interconnected compartments of equal size, and the underground tank not deeper than 7 m from the level of the fire brigade draw-out connection.
One caution for factories: Table 7 of NBC Part 4 states its Group G requirements for small-scale industry units. For other industries, the requirements are worked out from the relevant Indian Standards and in consultation with the local fire authority. So the tank and pump sizes for your plant come from the fire design, and the room follows. See our notes on pump room layout mistakes and tank sizing errors.
What should you give the architect?
Give a room schedule with six entries for each room: floor area, clear height under the beam, floor loading, door and equipment-removal route, ventilation and drain provisions, and cable entry. Give it when the equipment list is frozen, with the vendor's drawings attached where you have them. Architects can then place rooms on the plot plan with correct clearances, road access for the fire tender and a route for crane and truck. Our page for architects sets out how we coordinate MEP rooms with the building design.
How Secured Engineers helps
Secured Engineers designs electrical, fire, HVAC and plumbing systems in-house, so the room schedule and the equipment layouts come from one design. Fire NOC, CEIG and DISCOM filings are handled in-house, and MEPF and solar can be placed under one contract. We work from offices in Noida (Delhi NCR) and Ludhiana. The company has delivered 535+ projects across 18+ states, with 89.77% repeat clients.
If you have a plot plan and an equipment list, we can review the plant room schedule against the code points above and mark the rooms that look short before the drawings freeze. Start with the DG sizing calculator, then send the plan by WhatsApp, call +91 70099 85817, or ask for a free proposal that begins with a budget and layout review.
Frequently asked
How big does a transformer room need to be?
The NBC 2016 Part 8 Section 2 Annex C gives guide areas by capacity. For one 400 kVA transformer it shows 16.5 square metres for the transformer room and about 93 for the whole substation without generators; for two 400 kVA, 33 and about 125. These are for general guidance, with extra space for bus couplers and redundancy. Fix the final size from the HV and MV panel drawings.
Can a DG set be installed in a basement?
NBC Part 8 Section 2 says an emergency generator should not be installed above ground floor or below the first basement. If it is in the basement, the DG room's ceiling should be the ground floor slab, and forced ventilation is needed so the set derates as little as possible. The Code prefers a utility building. Your fire authority and the electrical inspector may add conditions.
What noise limit applies to a factory DG set?
For diesel sets up to 1,000 kVA manufactured on or after 1 January 2005, CPCB's rule is 75 dB(A) at 1 metre from the enclosure, with an integral acoustic enclosure. Where the room is acoustically treated instead, the design is for at least 25 dB(A) insertion loss or the ambient standard if higher. State pollution control boards regulate the limits, so confirm the local position.
Is there a code size for an STP room?
We found no area guide for an STP room in the NBC text we read. The footprint comes from the daily flow, the treatment technology and the vendor's general arrangement drawing, plus access for desludging and maintenance. Ask the vendor for the drawing as soon as the flow estimate is fixed, so the architect can reserve the yard before the layout is frozen.
What are the fire pump house requirements in NBC Part 4?
Clause 5.1.2.2 asks for the pump house at ground level where possible, with direct access from outside, fire walls with 120-minute doors, ventilation, no other utility equipment inside, and enough size for all pumps, valves, the diesel tank and the electrical panel. Negative suction and submersible pumps are not allowed. Pump and tank capacities for a factory are worked out with the local fire authority.
Related services
Related guides
- The Duct and the Beam Both Fit. On Separate Drawings.
- MEPF Cost per Sq Ft in India: How to Build a Budget You Can Defend
- One Bill, Six Tenants, and No Way to Prove Who Used What.
- A Digital Twin Is Not a 3D Model. It Is a Live Data Obligation.
- The Most Dangerous Electrical Installation You Will Ever Own Is the Temporary One
- Types of Fire Fighting Systems in a Building and Which Your Occupancy Needs
Related on this site
- termFire Hydrant System
- termSprinkler System
- termFire Extinguisher Rating
- serviceSoil, Waste & Rainwater Drainage (Plumbing)
- servicePumping & Hydro-Pneumatic Systems (Plumbing)
- calculatorCctv Storage Calculator
- calculatorPump Head Calculator
- buyer's guideHow to Select a Fire Protection Contractor
- guideFactory approvals roadmap, India
- guideCLU for industrial land
More on Project Delivery & Commercial · all insights