National Construction Code (NCC)
Your engineers set the applicable edition, state variations and compliance pathway, including any Section J energy-efficiency requirements.
Extend your team's MEP modelling, coordination and documentation capacity for a defined package, while your engineers keep design responsibility and sign-off.
Secured Engineers Pvt. Ltd. supports building services consultancies and contractors with scoped MEP production and coordination, delivered remotely from India.
Start with one paid package. Agree the outputs, fee, programme and revisions before work begins.
Australian requirements vary by state and by building class. We work to your templates and design inputs, and your engineers remain responsible for compliance.
Your engineers set the applicable edition, state variations and compliance pathway, including any Section J energy-efficiency requirements.
You nominate the applicable standards, such as AS/NZS 3000 (electrical), AS 1668 (ventilation), AS/NZS 3500 (plumbing), AS 2118 (sprinklers) and AS 1670 (detection).
Registered-engineer and design-declaration duties, such as RPEQ in Queensland or the NSW Design and Building Practitioners Act, stay with your authorised practitioners.
The BIM execution plan, model ownership, level of development, naming and common data environment follow your firm's or client's standard.
General orientation only, not legal or regulatory advice. Requirements change and vary by site, so confirm them with your local team.
For consultancies with more documentation work than their current team can handle.
Template, architecture and structure models, engineer's mark-ups, schematics and level-of-development requirement.
The agreed model areas, layouts and sheets, with a query register for your engineer's review.
Software versions and modelling scope are confirmed in the appointment.
For teams preparing federated models or resolving services interfaces.
Discipline models or drawings, the coordination matrix and the clash rules to apply.
Issue lists, agreed coordination markups and tracked model or drawing updates.
Clash resolution decisions stay with the responsible designers.
For firms checking a drawing set or BOQ before issue.
Current drawings, schedules, specifications and revision history.
A referenced discrepancy register between drawings, schedules and scope documents, for your team to resolve.
The audit is not a certification of NCC or standards compliance.
We start from your Revit or CAD template, title blocks, families, layers and drawing standards where the appointment calls for them. A small trial sheet or model area tests the match before volume work starts.
Sizing, schematics, mark-ups and design criteria come from your engineers or are agreed as a separate calculation scope. Assumptions go in a query register so they don't quietly become design decisions.
Tell us your confidentiality, data-location and tool-access requirements at the start. An NDA and any IP terms are agreed before files are exchanged, so the working arrangement matches your client commitments.
A useful review ties an observation to its source document and the action needed from the project team.
Illustrative review format. These are fictional examples, not findings from a client project or a certification of design compliance.
| Document reference | Observation | Action to resolve |
|---|---|---|
| Model level 03 / structure model | A supply duct passes through a beam with no penetration shown or approved. | Refer it to the structural engineer or reroute the duct. |
| Mechanical schedule M-601 / M-201 | The fan tag on the layout does not appear in the current schedule. | Confirm the tag and update the schedule or sheet. |
| Engineer's mark-up / E-301 | The mark-up does not state the circuit for a new distribution board. | Raise it as a query for the responsible engineer. |
These are existing published project references, with their recorded scope and limitations. They are not presented as appointments in Australia or as evidence of local authority approval.
Our published project record includes correspondence recording revised fire-fighting drawings and BOQ submitted for review for the Sector 43 parking project.
The submission records revision activity; it does not establish authority approval or completed installation.
Read the consultancy reference →Our company profile identifies a bespoke MEP design role for NXP. The published case sets out the recorded role and considerations for a similar design appointment.
The project location remains unreconciled. The profile reference does not establish experience in Australia, a certified performance result or an approval outcome.
Read the design reference →One system, one discipline or one drawing set gives both teams a defined first assignment. Enquiries can come from firms in Sydney, Melbourne, Brisbane, Perth, Adelaide and across Australia.
Working in more than one country? See our global MEP consultancy support.
Share a brief and document list. Agree any NDA before confidential files are exchanged.
Set the design basis, inputs, outputs, fee currency, payment milestones, deadline and revision allowance.
Receive the agreed package, assumptions and open queries. Consolidate comments through the nominated project contact.
Track responses and revisions against the appointment. Agree any additional work separately.
India is 2.5 hours behind Perth and 4.5 to 5.5 hours behind Sydney and Melbourne, depending on daylight saving. Your afternoon overlaps our working day, so handovers can be planned around it.
This page does not offer registered Australian engineering services. Our offices are in Ludhiana and Noida, India. Your authorised practitioners remain responsible for design, compliance, declarations, signing and any site inspection, and they check our outputs before issue.
State your software, version, template and level-of-development requirements in the brief. We confirm compatibility and capability, normally with a small trial area, before accepting the scope. BIM deliverables always have their own agreed modelling and coordination scope.
Yes. One floor, one discipline or a small sheet set works well as a paid pilot. It tests your standards, communication and review effort before you commit further. We agree the deliverables, fee and revisions up front.
Tell us your requirements first, including any restrictions from your client or insurer on data location or offshore work. We agree the NDA, transfer route and tool access before files are exchanged. This enquiry form does not upload project files.
We quote after reviewing the scope, inputs, standards, modelling depth and deadline. The proposal states the currency, payment milestones, delivery programme and revision allowance. Depending on the work, it can be priced per package or per defined stage.
Tell us what needs designing, checking or coordinating. We confirm suitability, inputs, deliverables, fee and programme before engineering starts.
Thank you. Our engineering team will review your requirement and contact you shortly.
If it's urgent, message us on WhatsApp or email sales@securedengineers.com.