Engineers Registration Board (ERB)
Regulates engineers and engineering firms. The appointment names the registered engineer or firm responsible for the engineering services in Tanzania.
Bring scoped MEP design and review support into your Tanzanian project, with the registered firm or engineer named from day one.
Secured Engineers Pvt. Ltd. supports registered consulting firms, architects, contractors and project owners with defined MEP documents, delivered remotely from India.
Start with one paid package. Agree the outputs, fee, programme and revisions before work begins.
Tanzania's Engineers Registration Board (ERB) requires firms offering professional engineering services in the country to be registered. So the first thing we settle is how a remote appointment fits around your registered team.
Regulates engineers and engineering firms. The appointment names the registered engineer or firm responsible for the engineering services in Tanzania.
Your project team confirms the fire-safety review requirements for the site and manages that route.
Supply capacity, metering and connection requirements are obtained from the utility and recorded as electrical design inputs.
Your local team manages planning, permit and environmental routes, and we provide agreed design information where it is in scope.
General orientation only, not legal or regulatory advice. Requirements change and vary by site, so confirm them with your local team.
For registered firms, contractors and owners checking a package before tender.
Current drawings, BOQ, specifications and scope split.
A referenced issue register, drawing–BOQ discrepancies and scope questions for the responsible team to resolve.
Our review does not certify design compliance or replace the registered engineer's check.
For a registered consulting firm or architect that needs defined MEP capacity.
Approved brief, architecture, design criteria, utility data and required issue stage.
The agreed calculations, layouts, schedules and BOQ, ready for your firm's checking and issue.
Your registered firm keeps signing and submission responsibilities.
For teams closing clashes, comments or design changes.
Backgrounds, MEP drawings, comments and revision history.
Coordination markups, an interface and query register, and agreed updates with a revision record.
BIM models and site inspection are not included unless expressly agreed with the right party.
Dar es Salaam and Zanzibar put more latent load on cooling systems, and salt air affects outdoor equipment and metalwork. Material and coating requirements belong in the specifications, not in site decisions.
Arusha and Dodoma have quite different climates and elevations from the coast, so outdoor conditions and altitude effects are set per site rather than copied across the country.
Lead times and local service support can shape what is practical. We list alternatives and assumptions in the schedules so your team can test them against local supply before tender.
A useful review ties an observation to its source document and the action needed from the project team.
Illustrative review format. These are fictional examples, not findings from a client project or a certification of design compliance.
| Document reference | Observation | Action to resolve |
|---|---|---|
| Specification M-S1 / outdoor unit schedule | No corrosion protection is specified for condensers on a coastal site. | Confirm the coating requirement and update the schedule. |
| Electrical E-02 / utility letter | The drawing states a supply capacity that the supplied utility correspondence does not confirm. | Obtain written confirmation of the available capacity. |
| Fire F-01 / BOQ §6 | The fire water tank is drawn, but the pump-room valves and fittings are not itemised. | Add the items or confirm the package boundary. |
These are existing published project references, with their recorded scope and limitations. They are not presented as appointments in Tanzania or as evidence of local authority approval.
Our published project record includes correspondence recording revised fire-fighting drawings and BOQ submitted for review for the Sector 43 parking project.
The submission records revision activity; it does not establish authority approval or completed installation.
Read the consultancy reference →Our company profile identifies a bespoke MEP design role for NXP. The published case sets out the recorded role and considerations for a similar design appointment.
The project location remains unreconciled. The profile reference does not establish experience in Tanzania, a certified performance result or an approval outcome.
Read the design reference →One system, one discipline or one drawing set gives both teams a defined first assignment. Enquiries can concern projects in Dar es Salaam, Dodoma, Arusha, Mwanza, Zanzibar and other regions.
Working in more than one country? See our global MEP consultancy support.
Share a brief and document list. Agree any NDA before confidential files are exchanged.
Set the design basis, inputs, outputs, fee currency, payment milestones, deadline and revision allowance.
Receive the agreed package, assumptions and open queries. Consolidate comments through the nominated project contact.
Track responses and revisions against the appointment. Agree any additional work separately.
India is 2.5 hours ahead of Tanzania, which leaves most of the East Africa working day open for calls and reviews.
No. In East Africa we work only as a remote MEP design consultant. We do not take supply, installation, site execution or contracting work. If you need a contractor, we can review their drawings, BOQ or proposal for you.
This page does not present Secured Engineers as an ERB-registered firm. Our offices are in Ludhiana and Noida, India, and this offer is for defined remote design and document support around a registered engineer or firm. Before any appointment, the parties confirm the registration and contract route that applies to the work.
Yes, you are welcome to send us your requirement. We then look at the scope with you and your registered engineer or firm so that the route is clear before any engineering starts. If you have not appointed one yet, tell us that in your enquiry.
No. This page does not offer Tanzanian authority approvals, utility applications or site supervision. Your local team owns those routes, and we provide the agreed drawings, calculations or schedules as inputs where they are in scope.
We agree the design basis with the client and responsible engineer for each appointment, then confirm our capability against it before accepting the scope. Please include any client, lender or brand standards in your brief.
Yes. Start with one discipline, one drawing set or one review as a paid pilot. We agree the inputs, deliverables, fee, programme and included revisions before starting.
Tell us what needs designing, checking or coordinating. We confirm suitability, inputs, deliverables, fee and programme before engineering starts.
In East Africa we work only as a remote MEP design consultant. We do not take supply, installation, site execution or contracting work.
Thank you. Our engineering team will review your requirement and contact you shortly.
If it's urgent, message us on WhatsApp or email sales@securedengineers.com.