Engineering Institution of Zambia
Regulates the engineering profession. Your local team confirms who must register or certify the work, and that person is named in the appointment.
Get MEP calculations, solar and backup power design inputs, and BOQ checks for your Zambian project, working with the local team that carries responsibility on site.
Secured Engineers Pvt. Ltd. supports consultants, contractors, developers and factory owners with scoped design and document review, delivered remotely from India. This is consultancy only, with no supply, installation or site execution.
Start with one paid package. Agree the outputs, fee, programme and revisions before work begins.
Power supply often decides a Zambian design as much as the building does. We record these points in the design basis, and your local team confirms the current requirements for the site.
Regulates the engineering profession. Your local team confirms who must register or certify the work, and that person is named in the appointment.
Electricity (Net Metering) Regulations were published in 2024. Your local team confirms eligibility, the current process and the required documents with the distribution provider.
Supply capacity, connection and any net metering requirements are confirmed with ZESCO and recorded as design inputs.
The regulator publishes guidance on net metering. Your team manages licensing and regulatory routes, and we provide agreed design information where it is in scope.
General orientation only, not legal or regulatory advice. Requirements change and vary by site, so confirm them with your local team.
For consultants, contractors and owners checking a package or quote before tender.
Current drawings, BOQ, specifications and the scope split.
A referenced issue register, discrepancies and scope questions for your team to resolve.
Pricing, remeasurement and redesign are agreed separately.
For local firms and developers needing capacity on a defined scope.
Brief, architecture, load data, utility information and required issue stage.
The agreed calculations, layouts, schedules and BOQ, with assumptions recorded for your engineer's checking.
Local certification and submissions stay with your local team.
For owners and teams deciding between grid, solar, storage and generators.
Load records, outage history, single-line diagram and any supplier proposals.
A review of essential loads, assumptions and interfaces in the supplied proposals, with questions for your team.
This is not an energy-yield guarantee or a supply offer.
Drought has cut hydro generation in recent years and ZESCO has reported a large power deficit. Essential loads, solar, storage, generators and changeover should be agreed before the electrical design is fixed.
A bill or a nameplate list is not enough. Daytime load, outage hours and critical circuits decide what solar and storage can actually carry, so we set out the assumptions for your team to test.
Copperbelt and processing sites often have large motor loads, dust and owner standards. Share those standards and the operating pattern with your brief so the design basis reflects them.
A useful review ties an observation to its source document and the action needed from the project team.
Illustrative review format. These are fictional examples, not findings from a client project or a certification of design compliance.
| Document reference | Observation | Action to resolve |
|---|---|---|
| Solar proposal / load schedule | The proposal assumes daytime load that the supplied schedule does not support. | Confirm the load profile and ask the supplier to restate the sizing. |
| Electrical SLD E-01 / BOQ §3 | The changeover between grid, solar and generator is not itemised in the BOQ. | Add the items or confirm the package boundary. |
| Battery proposal / outage records | The stated backup duration is not tied to the essential loads list. | Agree the essential loads and recalculate the duration. |
These are existing published project references, with their recorded scope and limitations. They are not presented as appointments in Zambia or as evidence of local authority approval.
Our published project record includes correspondence recording revised fire-fighting drawings and BOQ submitted for review for the Sector 43 parking project.
The submission records revision activity; it does not establish authority approval or completed installation.
Read the consultancy reference →Our company profile identifies a bespoke MEP design role for NXP. The published case sets out the recorded role and considerations for a similar design appointment.
The project location remains unreconciled. The profile reference does not establish experience in Zambia, a certified performance result or an approval outcome.
Read the design reference →One system, one discipline or one drawing set gives both teams a defined first assignment. Enquiries can concern projects in Lusaka, Ndola, Kitwe, the Copperbelt and other provinces.
Working in more than one country? See our global MEP consultancy support.
Share a brief and document list. Agree any NDA before confidential files are exchanged.
Set the design basis, inputs, outputs, fee currency, payment milestones, deadline and revision allowance.
Receive the agreed package, assumptions and open queries. Consolidate comments through the nominated project contact.
Track responses and revisions against the appointment. Agree any additional work separately.
India is 3.5 hours ahead of Zambia, which leaves most of the Lusaka morning and afternoon open for calls and reviews.
This page does not present Secured Engineers as registered in Zambia. Our offices are in Ludhiana and Noida, India, and we offer remote design and document support. Each appointment must name the local professional responsible for checking, certifying, submissions and site work.
No. Our Zambia work is consultancy only, with no supply, installation or site execution. We can review proposals and prepare agreed design documents for your local team and contractors.
We can review your load data and supplier proposals and set out the assumptions behind the sizing. Final selection, net metering approval and installation stay with your local team and installer.
Yes. Start with one discipline, one drawing set or one proposal review as a paid pilot. We agree the inputs, deliverables, fee, programme and included revisions first.
Tell us your confidentiality requirements first and agree any NDA before sending confidential files. This enquiry form does not upload project files.
Tell us what needs designing, checking or coordinating. We confirm suitability, inputs, deliverables, fee and programme before engineering starts.
Thank you. Our engineering team will review your requirement and contact you shortly.
If it's urgent, message us on WhatsApp or email sales@securedengineers.com.