Capacity and connection
Reconcile module capacity, inverter output, the connection limit and the capacity accepted for the application. Identify the documents still needed from the utility.
Check the sizing, load data and savings claims in your solar design or installer's proposal before you sign.
Secured Engineers Pvt. Ltd. offers scoped document review for owners, developers and consulting engineers, delivered remotely from India alongside the responsible local team.
Start with one paid package. Agree the outputs, fee, programme and revisions before work begins.
A proposal needs a traceable design basis. Your local engineer and utility confirm the applicable requirements; we review the agreed documents against those inputs.
Reconcile module capacity, inverter output, the connection limit and the capacity accepted for the application. Identify the documents still needed from the utility.
Confirm whether export is permitted, how credits are calculated, which charges remain and whether unused credit expires. Keep unconfirmed terms visible as assumptions.
Include production hours, weekends, shutdowns, site conditions and the grid-generator interface. Check whether the savings model uses the same assumptions as the drawings.
Name the appropriately authorised local professional responsible for verification, signing, applications and site work before agreeing the review scope.
General orientation only, not legal or regulatory advice. Requirements change and vary by site, so confirm them with your local team.
For owners comparing one or more solar proposals before signing.
Proposals, 12 months of bills, any load data and the site layout.
A referenced issue register, questions for each installer and a like-for-like comparison of their assumptions.
Equipment procurement, installation and contractor appointment are outside this remote review scope.
For consulting engineers and owners checking a design before tender.
Single-line diagram, layouts, equipment schedules, specifications and BOQ.
Findings on sizing, electrical interfaces, protection, drawing and BOQ gaps, each with an action.
The review does not certify compliance or replace the registered engineer's check.
For registered local engineers who need extra capacity on a feasibility study.
Load data, site information and the required format.
Agreed load analysis, sizing cases and export scenarios for your engineer to check and use.
Your registered engineer keeps signing, submissions and local responsibility.
Maximum demand may set the limit, but your daytime load decides the useful size. Weekends, shutdowns and planned growth all change the answer.
A savings figure should separate units used on site from units exported, and show any credit that could be lost. We check whether the claim follows from the proposal's own numbers.
Outages, changeover and protection shape the design as much as the roof does. We check that solar, grid and generator are shown working together, with altitude stated where it matters.
A useful review ties an observation to its source document and the action needed from the project team.
Illustrative review format. These are fictional examples, not findings from a client project or a certification of design compliance.
Read the full fictional MEP and solar review report →
| Document reference | Observation | Action to resolve |
|---|---|---|
| Proposal P-02 / load data | The proposal lists module capacity and inverter output without reconciling them with the demand records or utility connection limit. | Resolve the size basis with the registered engineer and licensee. |
| Savings model P-05 | All generation is valued at the full tariff, although the proposal's own profile shows weekend exports. | Re-run the model for self-use, export and no-export cases. |
| Electrical E-01 / proposal P-04 | The drawings show no interlock between solar, grid and generator during an outage. | Define the interface and who supplies it. |
These are existing published project references, with their recorded scope and limitations. They are not presented as appointments in East Africa or as evidence of local authority approval.
Our published project record includes correspondence recording revised fire-fighting drawings and BOQ submitted for review for the Sector 43 parking project.
The submission records revision activity; it does not establish authority approval or completed installation.
Read the consultancy reference →Our company profile identifies a bespoke MEP design role for NXP. The published case sets out the recorded role and considerations for a similar design appointment.
The project location remains unreconciled. The profile reference does not establish experience in East Africa, a certified performance result or an approval outcome.
Read the design reference →One system, one discipline or one drawing set gives both teams a defined first assignment. Enquiries can concern factories, warehouses and cold stores in Kenya, Uganda, Tanzania, Rwanda and Ethiopia.
Working in more than one country? See our global MEP consultancy support.
Share a brief and document list. Agree any NDA before confidential files are exchanged.
Set the design basis, inputs, outputs, fee currency, payment milestones, deadline and revision allowance.
Receive the agreed package, assumptions and open queries. Consolidate comments through the nominated project contact.
Track responses and revisions against the appointment. Agree any additional work separately.
India is 2.5 hours ahead of Kenya, Tanzania, Uganda and Ethiopia, and 3.5 hours ahead of Rwanda, so most of the regional working day overlaps with ours.
No. In East Africa we work only as a remote MEP and solar design consultant. We do not take supply, installation, site execution or contracting work. If you need a contractor, we can review their drawings, BOQ or proposal for you.
We agree the documents, checks, deliverables and limitations before work starts. This East Africa offer is for remote consultancy; it does not include equipment supply, installation or site execution.
This page does not present Secured Engineers as locally registered in any East African country. Our offices are in Ludhiana and Noida, India. Any feasibility study, signature or submission that requires a registered local engineer stays with that engineer.
No. Applications, licences and utility dealings stay with your local team. We provide agreed technical documents where they are in scope.
Twelve months of bills and the proposal or design are usually enough to scope a first review. Interval load data makes the review more useful, so send it if you have it.
We review the documents, system size, required outputs and deadline before quoting. The proposal states the fee currency, payment milestones and revision allowance, and you can start with one proposal as a paid pilot.
Tell us what needs designing, checking or coordinating. We confirm suitability, inputs, deliverables, fee and programme before engineering starts.
In East Africa we work only as a remote MEP and solar design consultant. We do not take supply, installation, site execution or contracting work.
Thank you. Our engineering team will review your requirement and contact you shortly.
Your enquiry reference: . Please include this reference when you send drawings, BOQs or other documents after agreeing any NDA.
If it's urgent, message us on WhatsApp or email sales@securedengineers.com.